Use Classes and Change of Use

Class F1: schools, museums and places of worship

6 min readBy PlanScope Editorial Team

A church can become a museum without permission because both sit in Class F1. What the class covers, what still needs consent, and the policies protecting these uses.

Class F1 use covers learning and non-residential institutions: schools and other education, museums, public libraries and reading rooms, the display of works of art other than for sale, public halls and exhibition halls, places of public worship and religious instruction, and law courts. All of those sit in a single class, which has a consequence people find surprising the first time they meet it. A church can become a museum, and a museum can become a school, without planning permission.

That flexibility is real, and it is also narrower than it looks, because everything about the building's operation still has to work.

What sits inside the class

The class was created by the Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020, which came into force on 1 September 2020 and broke up the old D1 and D2 classes. What used to be lumped together as non-residential institutions was split: the institutional and learning uses went into F1, local community facilities went into F2, and medical services, creches and day nurseries moved into the broad Class E alongside shops and offices.

The full F1 list should be read in the Order rather than from memory, because the wording is specific. Education means the provision of education, which covers a school, a college and a training centre but not a use that merely happens to teach something as part of a commercial operation. Display of works of art is qualified by the words other than for sale or hire, which is why a commercial gallery is not F1.

Places of worship sit at F1(f), and the wording extends to use in connection with religious instruction. A church hall used for the congregation's own activities is normally part of that use. A church hall hired out to the public for parties and classes is doing something else, and that is where enforcement disputes start.

Moving between F1 uses

Section 55(2)(f) of the Town and Country Planning Act 1990 puts a change of use within the same class outside the definition of development. So a redundant library becoming a place of worship, or a chapel becoming a museum, needs no permission for the change of use itself.

Three things still catch people.

  1. Conditions on the existing permission. A permission granted for a school with a condition restricting the use to a school defeats the class flexibility completely.
  2. Physical works. Alterations, extensions, new access arrangements, car parking, external lighting and signage are development in their own right.
  3. Intensification. A change within a class can still amount to a material change of use if the character of the activity alters completely, for example a small chapel used weekly becoming a venue holding several large events every day.

The safe route where money depends on the answer is a certificate of lawfulness under section 191 or 192 of the 1990 Act. That is the only formal way to confirm the position, and a council's informal email is not it.

Getting into F1 from a shop or an office

Moving from Class E into F1 is a material change of use and needs planning permission. This is the direction most community groups travel, typically taking a vacant retail unit for a church, a supplementary school or a community museum.

Permitted development rights involving these classes exist but are narrow and are amended often, so check the current Schedule 2 Part 3 of the General Permitted Development Order rather than relying on a summary. Assume a full application unless you have read the class wording yourself.

The application will be judged on the loss of the previous use, on highways and parking, and on amenity. Frontage policies matter in designated shopping areas, and the argument that a community use brings footfall works better when it is evidenced with expected attendance patterns rather than asserted.

Parking, noise and hours in practice

These uses concentrate people at particular times, which is the whole of the planning objection in most cases.

A place of worship with a Friday or Sunday peak, a supplementary school on Saturday mornings, and a hall hosting evening classes all generate the same complaint: parked cars in residential streets at the times residents want to park. The evidence that answers it is a Parking Survey carried out to a recognised methodology on the relevant days, together with a Transport Statement setting out attendance numbers, arrival profiles and any dispersal arrangements.

Noise is the second objection. Amplified sound, plant, and people arriving and leaving late in the evening. A Noise Impact Assessment addressing the specific sources, with a mitigation package the council can condition, is more persuasive than an undertaking to be considerate.

Expect conditions on hours, on numbers attending at any one time, on amplified sound, and on the use of any outdoor space. Negotiate the numbers before the officer picks them, and be honest about festivals and one-off events, because a condition that ignores them will be breached in the first year.

There is no planning fee exemption here, and the application fee for a change of use is set by the current national fee schedule, which is indexed annually. Check the figure on GOV.UK rather than working from an older table, and add the cost of any technical reports the council's validation list requires.

Local policy protecting community uses

The loss of an F1 use is usually resisted. Most local plans carry a policy requiring evidence that a community facility is no longer needed, or has been marketed unsuccessfully for a defined period, before a change to another use is permitted.

Marketing evidence is a discipline of its own. Councils typically want a stated period, a stated asking price or rent that reflects the existing use rather than an alternative one, evidence of the agent's efforts and a record of enquiries received. A twelve-month marketing exercise at a price set by a residential valuation will not satisfy the policy.

A building may also be listed as an asset of community value under the Localism Act 2011, which triggers a moratorium on disposal and is capable of being a material consideration in a planning decision. Community groups often reach for that first.

Listed places of worship

Many places of worship are listed buildings, and one exemption is worth knowing about. The ecclesiastical exemption, set out in the Ecclesiastical Exemption (Listed Buildings and Conservation Areas) (England) Order 2010, means that listed building consent is not required for certain works to listed buildings used for worship by specified denominations, where the denomination operates its own approved internal control system.

The exemption is limited. It does not cover works to buildings outside the exempt denominations, it does not extend to demolition of the whole building, and it never removes the need for planning permission where the works are development. Conservation area controls and the ordinary planning regime continue to apply. Where a building leaves worship use, the exemption goes with it, and a Heritage Statement assessing significance and harm becomes part of the application pack.

Anyone taking on one of these buildings should establish, in writing and before exchange, which regime applies and what has been done to the fabric under it.

Two practical steps help. Ask the denomination or trustees for the record of works carried out under the exemption, because it is rarely held by the council and will not appear in a planning search. And commission a condition survey early, since the repairs a large nineteenth century church needs tend to dwarf the cost of the planning work by a wide margin.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What does Class F1 include?

The provision of education, display of works of art other than for sale or hire, museums, public libraries and reading rooms, public halls and exhibition halls, public worship and religious instruction, and law courts. It was created by the 2020 amendment to the Use Classes Order, which broke up the old D1 and D2 classes.

Can a church become a school without planning permission?

The change of use itself normally needs none, because section 55(2)(f) of the Town and Country Planning Act 1990 puts changes within a class outside the definition of development. Check for conditions restricting the use on the existing permission, and remember that alterations, parking, access works and signage are development in their own right.

Do I need permission to turn a shop into a place of worship?

Yes. Shops sit in Class E and worship in Class F1, so the change is a material change of use requiring a full planning application. It will be judged on the loss of the previous use, on highways and parking, and on amenity. Permitted development rights in this area are narrow and change often, so check the current Order.

Can a council refuse because of parking on Sunday mornings?

Highway safety and residential amenity are proper planning considerations, so parking pressure at peak attendance times can support a refusal. The way to answer it is with a parking survey carried out on the relevant days to a recognised methodology, plus attendance figures and dispersal arrangements, rather than with reassurance.

Does the ecclesiastical exemption remove the need for planning permission?

No. The exemption under the 2010 Order removes the need for listed building consent for certain works to listed buildings in use for worship by specified denominations with their own internal control systems. Planning permission is still required where the works are development, and conservation area controls continue to apply.

Sources and further reading

use classesclass f1places of worshipcommunity facilitieschange of uselisted buildings

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Merging two dwellings and the loss of a unit

Combining two dwellings into one is not automatically a change of use. Whether permission is needed turns on local housing retention policy and the evidence you bring.

Read article →
Use Classes and Change of Use7 min read

Splitting one dwelling into two: the use position

Subdividing a dwelling always needs permission under section 55(3)(a). What decides the outcome is room sizes, refuse storage, cycle parking and overnight parking stress.

Read article →
Use Classes and Change of Use7 min read

Flats above shops and ancillary residential use

Accommodation above a shop is either ancillary to the Class E use or a separate dwelling. Access arrangements usually decide which, and moving between them is a material change of use.

Read article →
Use Classes and Change of Use7 min read

Change of use with no building work: what to submit

No building work does not mean no drawings. The permission defines a use within a planning unit, and only plans can define either, which is why most invalid applications fail here.

Read article →
Use Classes and Change of Use8 min read

Two planning units in one building: how to tell

A shop with a flat above may be one planning unit or two, and the answer changes which permitted development rights exist and whether a change of use needs permission at all.

Read article →
Use Classes and Change of Use7 min read

Conditions that tie a permission to one Class E sub-use

Class E lets a use move freely between shops, offices, gyms and clinics. A single condition on an old permission can take all of that away, and most buyers never read it.

Read article →