Use Classes and Change of Use

Class F2 local community uses and the shop threshold

7 min readBy PlanScope Editorial Team

A shop only sits in Class F2 while it stays under 280 square metres with no similar shop within 1,000 metres. What the class covers and how to evidence it.

Class F2 local community use is the only use class in England whose membership depends on what is happening outside the building. A shop qualifies as a local community use where it mostly sells essential goods including food, the premises cover no more than 280 square metres, and there is no other such facility within 1,000 metres. Change any one of those three facts and the same shop sits in a different class, with different rights attached.

That external test is what makes F2 worth understanding properly before you fill in an application form.

What Class F2 covers

The Use Classes Order as amended in 2020 put four things into Class F2:

  • Small shops mostly selling essential goods, including food, subject to the size and distance conditions.
  • Halls or meeting places used principally by the local community.
  • Areas or places for outdoor sport or recreation, excluding those involving motorised vehicles or firearms.
  • Indoor or outdoor swimming pools and skating rinks.

Class F1, which sits alongside it, covers learning and non-residential institutions: schools and other education, art galleries, museums, public libraries, exhibition halls, places of worship and law courts. The two are often confused because both describe non-commercial community activity, and they carry different permitted change rights.

What F2 deliberately excludes is ordinary retail. A general shop of any size sits in Class E, which is the commercial class covering shops, cafes, offices, professional services, indoor sport and clinics.

The floorspace threshold for a local shop

Two hundred and eighty square metres is the ceiling for the shop limb of F2, measured as the area the premises cover.

Measure it before you describe the use. A village shop with a stockroom, a post office counter and a small cafe area can sit either side of the line depending on what is counted, and the Order refers to the area the premises cover rather than to a net sales area. Where a unit is close to the threshold, produce a measured floor plan with the areas annotated and state the convention used, because an officer asked to accept a borderline figure will otherwise ask for a survey.

Essential goods is the other soft edge. A shop selling groceries, newspapers and household basics is clearly within it. A specialist delicatessen, a gift shop or a wine merchant is arguable, and the word mostly does real work.

Distance from another shop and how it is measured

The condition is that there is no other such facility within 1,000 metres of the shop's location. Other such facility means another shop of the kind described, so a large supermarket or a shop over the size limit does not necessarily count against you.

The Order does not spell out whether the distance is measured as a straight line or along a walking route, and in practice authorities take the straight line as the starting point and then consider the realistic catchment. A river, a railway or a dual carriageway between two shops changes the analysis in a way a radius does not capture, and that argument is worth making with a plan rather than in prose.

Record the position at the date of the application. Another shop opening 800 metres away afterwards does not retrospectively change the lawful use, but it will change the analysis for the next application on the site.

Halls, outdoor sport and swimming pools in F2

The hall limb is the one that generates most enquiries. A building used principally by the local community as a hall or meeting place is F2, which covers village halls, scout huts, community centres and many church halls used for secular community activity.

Where the hall is used for worship, the position shifts towards F1, and a building used for both needs a judgement about the primary use. Our note on how councils decide what they assess deals with the planning unit question that follows.

Outdoor sport and recreation is broad and excludes motorsport and shooting, both of which are sui generis. Swimming pools and skating rinks sit in F2 whether indoor or outdoor, which is an odd fit alongside the hall limb and occasionally useful, because a pool that would otherwise be read as an indoor sport use in Class E may fall in F2 instead.

Permitted changes into and out of F2

Part 3 of the General Permitted Development Order allows a number of changes involving F2 and F1 uses, and the class letters were renumbered when the Use Classes Order changed in 2020. Read the current consolidated text rather than an older advice note, because rights in this part have been amended several times since.

The practical point for an occupier is that flexibility runs in one direction more easily than the other. Moving out of a community use towards commercial use is often easier than moving back, and once a shop or hall has become a Class E use it can move within Class E without any further application.

That asymmetry is why councils resist the first change.

Local policies protecting community facilities

National policy supports the retention of community facilities and guards against their unnecessary loss, and almost every adopted local plan carries a policy giving effect to that. Those policies typically require an applicant to show that the facility is no longer needed or is not viable, and they apply whether or not planning permission is technically required.

A building can also be listed as an asset of community value under the Localism Act 2011, which does not stop a change of use but does trigger a moratorium on disposal and gives community groups a period to prepare a bid. Check the register before assuming a sale can proceed.

Where a proposal reduces community provision, a Social Infrastructure Assessment addressing need, capacity and accessibility gives the officer something to weigh, and an Open Space Assessment does the same job where the loss involves outdoor recreation land.

Evidence of marketing before loss

Where a policy requires the facility to be shown as unneeded or unviable, marketing evidence carries the argument, and weak marketing evidence loses cases.

What officers look for:

  1. A marketing period of the length the local policy specifies, commonly twelve months, and clearly evidenced.
  2. Marketing at a price reflecting the existing use value rather than a hope value based on residential conversion.
  3. Particulars aimed at the sector, with the agent named and the channels listed.
  4. A record of every enquiry, viewing and offer, with reasons for rejection.
  5. Financial information on the trading position, where viability is the argument.
  6. Evidence of approaches to community organisations, parish council and local groups.

Point two is where most cases fail. A community building marketed at a price only achievable with a residential permission has not been tested against demand for the existing use.

Describing the use on the application form

Be precise, and describe the use rather than the class. Applications that say change of use to F2 leave the officer to work out which limb of the class is meant, and a permission granted in those terms is hard to enforce and hard to rely on later.

Better to describe the activity. Change of use to a hall for community use. Change of use to a shop selling essential goods with a floor area of 240 square metres. Then state the class you consider it falls within, with the reasoning, in the supporting statement.

Where the classification depends on the external test, set out the evidence for it: the measured floor area and the nearest comparable shop with the distance stated and shown on a plan. A Planning Statement is the right place for that analysis, and on a scheme with any traffic implication a Transport Statement covers the access and servicing questions a community use raises.

One honest uncertainty. The essential goods test and the measurement of the 1,000 metre distance have not been worked through in many decisions, so on a borderline site the safest route is a pre-application enquiry with the position recorded in writing.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the size limit for a shop in Class F2?

The premises must cover no more than 280 square metres, and the shop must mostly sell essential goods including food, with no other such facility within 1,000 metres. All three conditions have to be met. Where a unit is near the limit, submit a measured floor plan with annotated areas and state the measurement convention used.

How is the 1,000 metre distance measured?

The Order does not specify, so authorities normally start with a straight line and then consider the realistic catchment. Barriers such as a river, railway or dual carriageway between two shops are worth arguing with a plan, because a simple radius ignores them. Record the position at the date of application.

Is a church hall in F1 or F2?

It depends on the principal use. A hall or meeting place used principally by the local community falls in F2, while a building used for worship sits in F1. Where both happen in the same building, the classification turns on which use is primary, which is a planning unit question rather than a matter of the building's name.

Can I change a village hall to a house without permission?

No. Changing a community use to residential needs an application, and local plan policies protecting community facilities will apply, usually requiring evidence that the facility is no longer needed or is not viable. Check the register of assets of community value too, since a listing triggers a moratorium on disposal.

What marketing evidence do councils accept?

Marketing for the period the local policy specifies, commonly twelve months, at a price reflecting existing use value rather than residential hope value, with particulars aimed at the sector, the agent named and every enquiry, viewing and offer recorded with reasons. Approaches to the parish council and community groups should also be evidenced.

Sources and further reading

use classesclass f2community facilitieschange of usevillage shop

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Co-living schemes and what use class they fall into

Large-scale purpose-built shared living fits no class in the Use Classes Order, so it is sui generis. That shapes room sizes, affordable housing contributions and the conditions on any consent.

Read article →
Use Classes and Change of Use7 min read

Trampoline parks and indoor leisure capacity

Indoor trampoline parks usually sit in Class E(d), so the planning risk moves to restrictive conditions, structure-borne impact noise and the occupancy figure the fire strategy allows.

Read article →
Use Classes and Change of Use7 min read

Crematoria and burial grounds: use class and consents

Neither a crematorium nor a burial ground falls within any use class, so both need planning permission. A crematorium also carries statutory separation distances and an emissions permit, and a burial ground needs a groundwater risk assessment.

Read article →
Use Classes and Change of Use6 min read

Sports and social clubs: Class F2 or sui generis?

A sports and social club can sit in Class F2 as a local community facility, or outside the use classes entirely if the bar becomes the main event. The distinction decides what you can change without permission.

Read article →
Use Classes and Change of Use6 min read

Film and television studios and the use class question

Film and television production is not named in the Use Classes Order, so a studio consent turns on how the primary use is described and how the planning unit is drawn. Sound stages, set workshops and production offices can each fall differently.

Read article →
Use Classes and Change of Use7 min read

Data centres: which use class applies

Classifying a data centre is a matter of fact and degree, and the answer rarely decides the scheme. Grid capacity and plant noise do.

Read article →