Planning Law Updates

Class MA and the conditions that limit it

8 min readBy PlanScope Editorial Team

The floorspace cap and vacancy test went in March 2024, but the two year Class E use requirement, natural light, space standards and Article 4 directions still decide most Class MA schemes.

Class MA lets a building in Class E commercial, business and service use change to dwellings under prior approval, without a full planning application. The right is narrower than its reputation. The building must have been in Class E use for a continuous period of at least two years before you apply, the right is disapplied on a list of designated sites and heritage assets, every new home must have adequate natural light in all habitable rooms and meet the nationally described space standard, and an Article 4 direction can remove the right entirely in the area you are interested in.

Two of the original limits have gone. The 1,500 square metre floorspace cap and the three month vacancy requirement were removed by an amendment to the Order that took effect on 5 March 2024. Read the current text of Class MA before relying on any summary, including this one, because Part 3 has been amended repeatedly.

What Class MA permits

Class MA sits in Schedule 2 Part 3 of the Town and Country Planning (General Permitted Development) (England) Order 2015 and was introduced in 2021. It permits the change of use of a building and any land within its curtilage from Class E to Class C3, subject to prior approval by the local planning authority.

Class E is broad. It covers shops, restaurants and cafes, financial and professional services, indoor sport and fitness, medical and health services, creches and nurseries, offices, research and development, and light industrial processes suitable in a residential area. So a former bank branch, a gym, a dental surgery and an office all come within the right in principle.

This replaced the narrower Class O right for offices, which applied only to Class B1(a) use and has fallen away with the use class it referred to. If you are reading older guidance that talks about office to residential conversion under Class O, it is describing a right that no longer applies to new proposals.

Physical works are not authorised by Class MA. The right covers the change of use and, to a limited extent, works reasonably necessary for the conversion. New windows, extensions, external alterations and a change to the shopfront need their own permission, and that is where many prior approval schemes come unstuck.

The two year use requirement and the vacancy test

The qualifying condition that bites most often is continuous Class E use for at least two years immediately before the date of the prior approval application. Not two years at some point in the past. Not two years of ownership.

Evidence that condition properly. Business rates records, lease documents, utility accounts, trading records, signage photographs with dates, and a statutory declaration where documentary evidence is thin. An authority that doubts the two year position will refuse, and the burden is on the applicant.

The three month vacancy requirement that originally sat alongside it was removed from 5 March 2024. That removal matters commercially, because it means a building in active Class E use can convert without a deliberate void period. But the two year use condition survived, and the two are easy to confuse when reading older commentary.

Where the building has had a mixed history, the question becomes which use was the primary one. A unit used as a shop with ancillary storage is in Class E. A unit used substantially for general industrial purposes in Class B2 is not, and no amount of a Class E label in the lease cures that.

Floorspace limits and how they changed

Until 5 March 2024, Class MA applied only where the cumulative floorspace changing use did not exceed 1,500 square metres. That cap has been removed, so larger buildings can now use the right.

The practical effect is uneven. A large building generating a substantial number of homes attracts more scrutiny on the prior approval matters the authority can consider, particularly transport and noise, even though the floorspace itself is no longer a bar. And removal of the cap has made Article 4 directions more attractive to authorities that want to protect town centre frontages, so the local position matters more than the national one.

Where a scheme would once have been split into phases to stay under the cap, check whether a single application is now simpler. Where a previous phase was already approved under the old limit, the cumulative floorspace wording no longer constrains the next one.

Matters the authority may consider

Prior approval is not a rubber stamp, and the list of matters is specific. The authority considers transport impacts, particularly safe site access, contamination risk, flood risk, the impact of noise from commercial premises on the intended occupiers, and the impact on the intended occupiers of introducing residential use into an area the authority considers important for general industrial, storage or distribution use. Where the building is in a conservation area, the authority also considers the impact of the loss of the ground floor use.

Those last two are the ones that refuse schemes. A unit in the middle of a working industrial estate is a poor candidate however clean the paperwork. A ground floor shop in a conservation area shopping parade engages the frontage question directly, and an authority with a town centre vitality policy will use it.

What the authority cannot do is apply its general development plan policies as though this were a full application. Affordable housing, amenity space standards beyond those in the Order, and design policy are outside the prior approval matters. That is the value of the route, and it is also why authorities reach for Article 4.

Natural light and space standards

Two conditions apply to all residential conversions under Part 3 and are easy to overlook.

Every habitable room must have adequate natural light, and the authority must refuse prior approval where the plans do not show it. There is no numerical test in the Order, so a short daylight note with the plans is worth preparing, particularly for deep plan buildings and basements. A bedroom lit only by a borrowed light or a rooflight at the end of a long corridor will not pass.

New dwellings created under Part 3 must also meet the nationally described space standard, which sets minimum gross internal areas by number of bedrooms and bed spaces, along with minimum room dimensions. Annotate every unit on the plans with its gross internal area and its bed space count. An application that leaves the officer to measure it invites a refusal.

Where Article 4 directions apply

An Article 4 direction made by the authority removes a permitted development right in a defined area. Many authorities have made directions covering Class MA in town centres, primary shopping frontages and industrial areas.

Check for directions before anything else. They are published by the authority and recorded in the national planning data, and a direction means a full planning application with all the development plan policies in play. National policy expects directions to be limited to situations where they are necessary to avoid wholly unacceptable adverse impacts, and to the smallest geographical area possible, which is a point worth making in representations on a draft direction rather than after it is confirmed.

Watch the timing too. A direction made without immediate effect comes into force after a notice period, and an application made before that date is determined under the right as it stood.

Common reasons prior approval is refused

The pattern is consistent: evidence of the two year Class E use is thin, the plans do not demonstrate adequate natural light, unit sizes fall below the space standard, the site is in an area the authority treats as important for industrial or storage use, noise from a neighbouring commercial operation has not been assessed, or external alterations have been included that the right does not cover.

Flood risk and contamination refusals turn on the absence of an assessment rather than on the substance. Where the building sits in Flood Zone 2 or 3, submit a flood risk assessment with the prior approval application. Where the previous use was potentially contaminative, submit a desk study.

A refusal can be appealed under section 78, and the appeal is determined on the prior approval matters only, which keeps the case narrow.

Deciding between prior approval and a full application

Prior approval is faster, lower in cost and narrower. A full application is slower and opens the scheme to the whole development plan, but it can authorise external alterations, a different mix, and a scheme that does not fit the qualifying conditions.

Three situations point towards a full application. An Article 4 direction covers the site. The scheme needs external works that materially change the building. Or the building fails a qualifying condition, for example because it has not been in Class E use for two years.

Note also that development permitted by a development order is outside the biodiversity gain condition that otherwise attaches to planning permissions, which is explained in our note on the biodiversity gain condition. The levy can still apply to prior approval development, and the notice requirements are the same, as set out in commencement notices and the levy amendment regulations.

Follow changes to Part 3 on the planning law updates timeline, and check the Order as currently in force before you commit. Browse the 66 report types by category to scope the flood, contamination and noise evidence a prior approval application may need.

This is general guidance, not legal advice. Permitted development rights change frequently and a lawful development certificate is the only formal way to confirm that works are lawful, so check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What are the qualifying conditions for Class MA?

The building must have been in Class E use for a continuous period of at least two years immediately before the prior approval application, and the right is disapplied for listed buildings and their curtilage, scheduled monuments, sites of special scientific interest, safety hazard areas and military explosives storage areas. The Order lists further exclusions, so read the current text.

Is there still a floorspace limit on Class MA?

No. The 1,500 square metre cumulative floorspace cap was removed by an amendment to the General Permitted Development Order that took effect on 5 March 2024, along with the three month vacancy requirement. The two year continuous Class E use condition was not removed and still applies to every application.

Does the building have to be vacant before applying?

Not since 5 March 2024, when the three month continuous vacancy requirement was removed. A building in active Class E use can now convert without a deliberate void period. Older commentary that refers to a vacancy test is describing the position before that amendment, so check the Order as currently in force.

What can the council refuse prior approval on?

Only the listed prior approval matters: transport impacts and safe access, contamination, flood risk, noise from commercial premises affecting the intended occupiers, the effect of introducing residential use into an area important for industrial, storage or distribution use, and in a conservation area the loss of the ground floor use. Adequate natural light and space standards also apply.

Does Class MA allow new windows or external alterations?

No. The right covers the change of use and works reasonably necessary for the conversion. New window openings, extensions, external alterations and changes to a shopfront need separate planning permission, and including them in a prior approval application is a frequent reason for refusal.

How do I check whether an Article 4 direction removes the right?

Directions are published by the local planning authority and recorded in the national planning data, so check both before doing anything else. A direction means a full planning application with the whole development plan in play. Where a direction is made without immediate effect, applications submitted before it takes effect are determined under the right as it stood.

Sources and further reading

class mapermitted developmentprior approvalchange of usearticle 4gpdo

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates6 min read

Local validation lists: what authorities may require

A local list item only bites if it was published within two years and is reasonable for your scheme. How to check, and what to do when validation disagrees.

Read article →
Planning Law Updates8 min read

Temporary stop notices and how long they last

A temporary stop notice halts an activity on display, with no right of appeal, and now lasts up to 56 days in England. Here is what it can and cannot prohibit.

Read article →
Planning Law Updates7 min read

Appeal procedures compared: written, hearing and inquiry

You state a preference and the Inspectorate decides. Here is how the three appeal procedures are allocated, what each demands, and how to argue for the one you want.

Read article →
Planning Law Updates8 min read

Prior approval procedure and the deemed grant trap

The 56 day deemed grant under paragraph W runs from receipt, permits only what was submitted, and waives none of the class conditions. How to use it safely.

Read article →
Planning Law Updates7 min read

Permitted development conditions and the effect of a breach

A breached condition in the General Permitted Development Order leaves the whole extension unauthorised, not just the non-compliant part. What follows and how to fix it.

Read article →
Planning Law Updates7 min read

The standard method for local housing need explained

Local housing need now starts from existing stock rather than household projections. The result is a minimum for plan making, not a target, a ceiling or a test for any single application.

Read article →