Class MA prior approval or full permission for flats
Class MA grants the change of use and nothing else. The route works when the building passes every eligibility gate and the envelope stays as built; otherwise a full application is the cleaner asset.
Class MA prior approval is faster and narrower than a full application, and it costs less, and it is the right route for an office to flats conversion only when the building passes every eligibility gate and the scheme needs no change to the external envelope. A full application under section 70 of the Town and Country Planning Act 1990 costs more and takes longer, but it lets you alter the building, add floorspace, argue the planning merits and secure a permission that is not vulnerable to an argument about whether a limitation was met.
The deciding question is rarely which route is quicker. It is whether the conversion you actually want fits inside what Class MA permits.
What Class MA does
Class MA sits in Schedule 2 Part 3 of the General Permitted Development Order 2015 and permits a change of use from Class E, the commercial, business and service class, to Class C3 dwellinghouses. It grants the change of use only. It does not grant external alterations, new windows, extensions, balconies, changes to the roof or new access arrangements, all of which need their own permission.
Before anything else, read the current consolidated text of Class MA. The eligibility gates in it, including how long the building must have been in Class E use, any requirement that it be vacant, and any cap on the floorspace changing use, have been amended since the class was introduced in August 2021. Commentary written against the original version is no longer a safe guide, and these are the provisions on which a prior approval application stands or falls.
Class MA is also unavailable in defined circumstances. A listed building or land within its curtilage is excluded, as is a scheduled monument and its curtilage, a site of special scientific interest, a safety hazard area and a military explosives storage area. Buildings on agricultural land occupied under an agricultural tenancy are excluded, and so, broadly, are buildings whose current use was itself granted by one of the earlier residential conversion classes in Part 3.
What the council can and cannot consider
Prior approval is not a merits assessment. The authority may only consider the matters the Order lists, which for Class MA are:
- Transport and highways impacts of the development.
- Contamination risks in relation to the building.
- Flooding risks in relation to the building.
- Impacts of noise from commercial premises on the intended occupiers.
- Where part of the building is on a ground floor and in a conservation area, the impact of the change of use on the character or sustainability of the conservation area.
- The provision of adequate natural light in all habitable rooms.
- Where the building is in an area the authority considers important for heavy industry, waste management, storage and distribution or a mix of such uses, the impact of the introduction of residential use.
- The design and external appearance of the building, where that is relevant to the matters above.
Everything else is off the table. Affordable housing, policy compliance with the development plan, the loss of employment floorspace as a matter of principle, amenity for neighbours and parking standards are not prior approval matters. That narrowness is the whole attraction of the route.
Natural light is the condition that most often defeats a scheme. Deep plan office floorplates produce internal bedrooms with no window, and a prior approval must be refused where adequate natural light is not provided to all habitable rooms. Draw a plan with every habitable room's glazing shown before you apply.
Space standards apply either way
A common misreading is that permitted development conversions escape minimum unit sizes. They do not. Homes created through prior approval are subject to the nationally described space standard, which sets minimum gross internal areas by number of bedrooms and occupants, along with minimum built-in storage and a minimum floor-to-ceiling height.
Where a local plan sets different minimum sizes, the interaction between the two is not always obvious, and the reasoning is set out in the comparison of the space standard and local minimum unit sizes.
Run the areas before the appointment of an architect, not after. A floorplate that yields fourteen units on a sketch often yields nine once the standard and the daylight requirement are applied together.
Why a full application is sometimes better
Four situations push towards a full application.
The building needs physical change. Any new window opening, roof extension, balcony, external stair or alteration to the elevations falls outside Class MA, so a scheme requiring them needs a planning application anyway. Running two routes in parallel, prior approval for the use and a full application for the alterations, is possible but creates sequencing risk.
The eligibility is arguable. If the building's recent use history, vacancy position or floorspace sits close to a limitation, a prior approval granted on a contested basis is a weak asset. A purchaser's solicitor will ask, and the answer has to be clean.
You want more than the envelope allows. Additional storeys, infill or a change to the footprint need permission, and some of those have their own permitted development routes with their own limitations.
The site is in an area where the authority has used an Article 4 direction to remove Class MA. Several authorities have done so for defined centres and employment areas, and the direction is the first thing to check on the authority's own mapping.
Comparing the two routes
| Class MA prior approval | Full application | |
|---|---|---|
| What is granted | Change of use only | Use and any works applied for |
| Scope of assessment | Listed prior approval matters only | Full development plan and material considerations |
| Affordable housing | Not a consideration | Policy applies according to the local plan |
| Determination period | The statutory prior approval period | 8 weeks for minor, 13 for major, subject to extension |
| Fee | Lower, fixed per application | Scaled by units or floorspace |
| External alterations | Not included | Can be included |
| Vulnerability | Turns on whether every limitation was met | Turns on planning merits once granted |
Community Infrastructure Levy liability can arise on either route where the authority has a charging schedule and the floorspace is chargeable, so do not treat prior approval as a levy-free option without checking the schedule and the relevant exemptions.
Evidence for each route
For prior approval, assemble: the application form and fee, a plan showing the building and the floorspace changing use, floor plans showing every habitable room with its glazing, a noise assessment where commercial uses adjoin, a contamination screening note, a flood risk position, a transport note covering access and parking, and documentary evidence of the building's use history. Keep the use history evidence to primary documents, meaning leases, business rates records, accounts and dated photographs.
For a full application, the pack is the normal one and the documents follow from the site's constraints. The index of report types shows which are usually in play for a residential conversion, and the daylight, noise and transport work tends to be deeper because the authority is assessing merits rather than a closed list.
Either way, settle the route before the design is fixed. Switching from prior approval to a full application after a refusal costs a quarter and a fee, and the alternative appeal route differs by application type in the way described in the note on householder and fast track commercial appeals.
Draft the supporting documents for a conversion on PlanScope, then have them reviewed before submission.
This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. A lawful development certificate is the only formal way to confirm that works are lawful. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
What can the council consider on a Class MA prior approval?
Only the matters the Order lists: transport and highways impacts, contamination, flooding, noise from commercial premises affecting occupiers, the conservation area impact of losing a ground floor use, adequate natural light in all habitable rooms, and the effect of introducing residential use in areas important for industry, waste or distribution. Policy compliance and affordable housing are not among them.
Does Class MA allow new windows or an extension?
No. Class MA grants the change of use alone. New window openings, roof extensions, balconies, external stairs and alterations to the elevations all need separate permission. A scheme that depends on physical change to the building will need a planning application regardless, which often makes a single full application the simpler route.
Do space standards apply to a prior approval conversion?
Yes. Homes created through prior approval are subject to the nationally described space standard, which sets minimum gross internal areas by bedrooms and occupants, minimum built-in storage and a minimum floor-to-ceiling height. Run the areas before the design is developed, because a floorplate often yields far fewer compliant units than a first sketch suggests.
Where is Class MA unavailable?
Listed buildings and land in their curtilage, scheduled monuments and their curtilage, sites of special scientific interest, safety hazard areas and military explosives storage areas are all excluded, as are buildings on agricultural land held under an agricultural tenancy. An Article 4 direction can also remove the right for a defined area, so check the authority's mapping first.
Is a prior approval conversion free of the levy?
Not necessarily. Community Infrastructure Levy liability can arise on either route where the authority has adopted a charging schedule and the floorspace is chargeable. Check the schedule and the available exemptions and reliefs before assuming the prior approval route avoids a payment, and submit the required forms before commencement.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.