Energy, Sustainability and Carbon

Energy statements for refrigerated warehousing

7 min readBy PlanScope Editorial Team

Refrigeration is process energy, so it sits outside Part L and outside the percentage a carbon policy asks for. A cold store energy statement that ignores that is answering the wrong question.

A cold store energy statement has an awkward starting point: the largest energy use in the building is invisible to the calculation the policy target is based on. Process refrigeration is unregulated energy, so it falls outside Part L and outside the percentage reduction a local plan carbon policy asks for. You can show a large regulated improvement on a refrigerated distribution building while the meters run at many times the figure in the table.

Officers have become alert to this. The statements that pass are the ones that report the process load openly, set out what is being done about it, and explain why the Part L number is small.

Why the regulated and process split matters more here

Regulated energy under Approved Document L covers fixed building services: space heating and cooling, hot water, ventilation and fixed lighting. Process energy, including refrigeration plant serving chilled and frozen storage, is outside that definition.

For an office the split might be reasonably balanced. For a freezer store it is lopsided. The building has almost no space heating demand, modest lighting, and a refrigeration plant running continuously. A compliance calculation under the National Calculation Methodology compares your building with a notional building of the same geometry built to a defined specification, and that notional building is assumed to be heated and lit in a conventional way. Comparing a cold store against it produces a number that is arithmetically correct and practically meaningless.

There is a further wrinkle worth resolving early. Some industrial buildings with low energy demand sit outside parts of the energy efficiency requirements altogether, and how a cold store is treated depends on how it is serviced and how the unconditioned volumes are modelled. Settle that with your building control body before the energy statement is drafted, because the answer changes what the statement can say.

Reporting the refrigeration load

The statement should give the refrigeration load its own section with its own numbers, separate from the compliance tables.

What a reviewer needs is the refrigerated volume by temperature regime, the design plant capacity, the assumed operating hours and load profile, the coefficient of performance or seasonal efficiency assumed for the plant, and the resulting annual electricity consumption. Then state the method used to derive it. A design-stage operational energy estimate prepared to a named method such as the CIBSE approach to evaluating operational energy is far more useful than a single unsupported kilowatt-hour figure.

Separate the loads out as well. Compressors, condenser fans, evaporator fans, defrost, dock equipment, underfloor heating to the freezer slab and lighting inside the cold volume all behave differently, and an officer asking about mitigation wants to know which of them your strategy actually touches.

The electrical consequence belongs here too. A continuous refrigeration load drives the connection capacity, and the timing of a distribution network operator connection is often the real programme risk on these schemes. Our note on substation capacity and the grid connection question covers how that interacts with the planning programme.

Fabric performance in a cold envelope

A cold envelope behaves in the opposite direction to a heated one, and the details that matter are different.

Insulation continuity is the whole game. A thermal bridge in a freezer envelope wastes energy, and then it condenses and freezes, and ice formation in a panel joint is a defect rather than an inefficiency. So the statement should describe the panel system, the treatment of junctions at the floor perimeter, the vapour control strategy and the approach to penetrations.

Underfloor heating beneath a freezer slab is an energy use that exists to prevent frost heave lifting the floor. It is unavoidable, but its source is a design choice, and recovered heat from the refrigeration plant is the obvious one.

Air infiltration at the dock is where a lot of the load actually comes from. Rapid-action doors, dock shelters, air curtains, vestibules between temperature regimes and a door interlocking regime all reduce it, and they are the measures a planning officer can understand without a thermodynamics lesson. Give the door cycle assumptions you used, because that is what the load estimate turns on.

Heat recovery and what is worth claiming

A refrigeration plant rejects heat continuously, all year, which makes it an unusually reliable heat source. That is the strongest part of most cold store energy strategies and it is often understated.

The uses worth claiming are the ones with a matching year-round demand: domestic hot water, heating for the ancillary office and welfare areas, underfloor heating to the freezer slab, and defrost. Where an adjacent building or a future phase could take low-grade heat, say so and describe the connection point you have left, because a network connection commitment carries weight in policy terms even when the network does not exist yet.

What is not worth claiming is a heat recovery arrangement with no demand to serve. A desuperheater feeding a hot water cylinder that is already heated by an efficient source is a line on a drawing rather than a carbon saving, and reviewers with technical support will say so.

Quantify it properly. Give the recoverable heat, the demand it meets, the hours of coincidence, and the resulting reduction. An unquantified statement that heat recovery will be incorporated invites a condition requiring the detail later, which means a discharge application.

Refrigerant choice and its carbon weight

Refrigerant selection has a carbon consequence that sits outside the energy calculation entirely, and it belongs in the statement.

Ammonia and carbon dioxide systems have negligible direct global warming potential compared with the fluorinated refrigerants they replace, and the regulatory direction of travel has been reducing the supply of high global warming potential gases for years. Ammonia brings safety and design implications, including separation distances, plant room design and the regulatory regime for the quantity stored. Carbon dioxide systems operate transcritically at high pressures with their own engineering consequences.

What the statement should contain is the refrigerant proposed, its global warming potential, the charge quantity, the leakage rate assumed over the life of the plant, and the resulting emissions. Where a refrigerant is chosen for safety or operational reasons rather than carbon, say so plainly.

Those life-cycle emissions also belong in a Whole Life Carbon Assessment if one is required, and the RICS methodology sets out where refrigerant leakage sits in the modular reporting. Keep the charge quantity and leakage assumption identical in both documents.

Benchmarking against comparable buildings

Because the Part L comparison is weak, benchmarking carries more weight than usual, and it is where statements most often become vague.

Use an intensity metric suited to the building type. Energy use per cubic metre of refrigerated volume per year is more meaningful for a cold store than energy per square metre of floor area, because the load follows volume and temperature regime rather than footprint. Whatever metric you use, state it, state the source of the comparator, and state whether the comparator includes process energy. A benchmark quoted without those three things will be discounted.

Do not invent a figure. If no published benchmark fits the building, say that, give your modelled intensity, and offer a monitoring commitment instead. That is a more defensible position than a comparison nobody can verify, and it sits comfortably alongside a BREEAM Pre-Assessment where the scheme is pursuing certification.

Presenting the strategy to a planning officer

Structure the Energy Statement so that the officer can find the policy answer and the honest answer in the same document without them contradicting each other.

  1. State the policy target and which emissions it applies to, in one paragraph.
  2. Give the regulated emissions baseline and proposed figures, with the software and version named.
  3. Give the process energy estimate separately, with its method named and its exclusion from the policy target stated.
  4. Set out the measures against the energy hierarchy: demand reduction first, then efficient supply and heat recovery, then low carbon generation.
  5. Quantify each measure, including the heat recovery, with the demand it serves.
  6. Report the refrigerant, charge, leakage assumption and resulting emissions.
  7. Offer a metering and reporting commitment, with the metering strategy described.

That last point matters more on a process-dominated building than anywhere else, because the gap between design estimate and operation is wide and the only way to close it is measurement. Where a zero carbon or energy condition is likely, read it before determination, since discharge terms drafted for an office can be awkward to satisfy on a cold store. Our note on zero carbon conditions and how they are discharged sets out what to watch for.

Enter your postcode on PlanScope to see which energy and sustainability documents an industrial scheme is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is refrigeration counted in a Part L calculation?

No. Process refrigeration serving chilled and frozen storage is unregulated energy, so it sits outside the Building Emission Rate and outside the percentage reduction that local plan carbon policies are usually written against. Report it separately, with its own method and assumptions, rather than folding it into the compliance tables.

How should I benchmark a cold store's energy use?

Use energy per cubic metre of refrigerated volume per year rather than per square metre of floor area, because the load follows volume and temperature regime. State the comparator source and whether it includes process energy. Where no published benchmark fits, give your modelled intensity and offer a metering commitment instead of inventing a comparison.

Does the freezer floor really need heating?

Yes, in most designs. Underfloor heating beneath a freezer slab prevents the ground below freezing and lifting the floor. It is an unavoidable energy use, but its source is a choice, and recovered heat from the refrigeration plant condenser is the obvious one. Quantify the recovered heat against the demand rather than stating the principle.

Which refrigerant should the energy statement assume?

Whichever the mechanical design actually proposes, stated with its global warming potential, charge quantity and assumed leakage rate. Ammonia and carbon dioxide systems have very low direct warming potential but bring safety and pressure design consequences. If the choice was driven by operational or safety reasons rather than carbon, say so.

Do cold stores get an exemption from the energy efficiency requirements?

Some industrial buildings with low energy demand sit outside parts of the Building Regulations energy efficiency requirements, and how a cold store is treated depends on how it is serviced and how unconditioned volumes are modelled. Settle the position with your building control body before drafting, because it changes what the energy statement can claim.

Sources and further reading

energy statementcold storageindustrialrefrigerationcarbonpart l

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Energy, Sustainability and Carbon

View all →
Energy, Sustainability and Carbon6 min read

Embodied carbon of foundations and ground works

On brownfield sites the substructure can carry more embodied carbon than the frame above. How piling, rafts, ground improvement and mix design compare, and how to report substructure so the saving is reviewable.

Read article →
Energy, Sustainability and Carbon7 min read

Green roofs: what counts and what the drawings must show

A thin sedum blanket satisfies almost no current policy. What separates extensive, biodiverse and intensive roofs, how much attenuation credit to expect, and the drawings that discharge the condition.

Read article →
Energy, Sustainability and Carbon6 min read

Water efficiency standards and how to hit 110 litres

The tighter 110 litre standard applies only where a plan policy adopts it and a condition imposes it. How the water efficiency calculation works and which fittings decide the result.

Read article →
Energy, Sustainability and Carbon7 min read

Energy and carbon conditions: what gets discharged when

Energy and carbon conditions bite at different points in the programme. The triggers, the as-built evidence councils accept, and what to do when design changes break one.

Read article →
Energy, Sustainability and Carbon7 min read

Overheating risk in a loft conversion

Sloping rooflights collect more solar gain than vertical windows, and a converted loft has almost no thermal mass. Part O rarely applies, so the design has to deal with it.

Read article →
Energy, Sustainability and Carbon7 min read

Electricity grid capacity and when it stops a scheme

Capacity is a deliverability problem, not a policy objection. What to ask the network operator, how to read an offer, and how phasing conditions should be drafted.

Read article →