What competent person means for biodiversity net gain

6 min readBy PlanScope Editorial Team

The statutory biodiversity metric expects a competent person, but no licence or register defines one. Here is what councils look for and how to brief an assessor properly.

Nobody licenses biodiversity net gain assessors. There is no register, no certificate and no statutory competence test, which sits oddly beside a regime that expects a competent person to complete the statutory metric and makes the result a condition on almost every planning permission. Competence here is a matter of evidence rather than paperwork, and the evidence a local planning authority looks for is fairly consistent.

Understanding what that evidence is will save you a delayed start on site. The metric is checked after permission, when the programme is least forgiving.

Where the expectation of competence comes from

The Environment Act 2021 inserted the biodiversity gain condition into the Town and Country Planning Act 1990. Mandatory net gain applied to major development from 12 February 2024 and to small sites from 2 April 2024. The scheme requires a ten per cent uplift in biodiversity value, measured with the statutory metric published by Defra, secured and maintained for at least 30 years.

The statute itself does not define a competent person. The expectation comes from the metric's user guide and from the way authorities apply it: the metric is a calculation tool that turns field observations into units, and the tool is only as good as the observations fed into it. Defra's guidance is explicit that the metric should be applied by someone with the relevant ecological skills.

So the question a council asks is not "does this person hold a certificate", but "could this person defend the habitat classification at appeal".

Habitat classification and condition assessment

Two judgements drive everything downstream.

The first is classification. Habitats are recorded using the UK Habitat Classification, which distinguishes, for example, modified grassland from other neutral grassland, and lowland mixed deciduous woodland from a line of trees. Get that wrong and the distinctiveness band changes, which changes the number of units before any condition scoring happens.

The second is condition. Each habitat type has published criteria, and the assessor scores the parcel as good, moderate or poor against them. This is where the largest arguments occur, because the difference between moderate and good on a hectare of grassland can be worth more units than the whole of a small scheme's proposed planting.

Both judgements are made standing in the field, in the growing season, with a plant identification skill set. Neither can be made from aerial imagery, and a metric produced without a site visit is the first thing a council ecologist looks for.

Who signs the metric and what that means

The metric file records the assessor's name and the survey date. That is the signature, and it carries three practical consequences.

It exposes the surveyor to professional scrutiny, which is the point. It ties the baseline to a date, and councils generally expect the survey to be recent, with older data challenged in the same way as protected species survey data. And it creates a chain of responsibility that matters when the biodiversity gain plan is submitted months or years later by a different party.

Keep the native metric file as well as the printed summary. Councils ask for the calculation tool itself so they can see the habitat parcels, the areas and the condition scores as entered, and a scheme that supplies only a PDF extract of the results will usually be asked for the file anyway.

Where the assessor is a member of a professional body, that membership carries a code of conduct and a complaints route. It also usually carries professional indemnity insurance, which is worth confirming rather than assuming, particularly on a scheme where an error would mean buying off-site units.

How councils check the assessor

Authorities vary in how much ecological capacity they hold. Some employ an in-house ecologist, some buy in a county ecology service, and some rely on the applicant's own consultant with a light review. The checks that recur are these:

  • Is there a named surveyor with stated qualifications, and a survey date inside the growing season?
  • Does the habitat plan match the site layout drawing parcel for parcel, with areas that add up to the red line?
  • Are condition scores justified against the published criteria, with the criteria assessment shown rather than asserted?
  • Have the trading rules been respected, so that losses of medium or high distinctiveness habitat are replaced with the same or better?
  • Are irreplaceable habitats, such as ancient woodland, correctly excluded from the metric and dealt with in policy terms instead?

A preliminary ecological appraisal that describes the site in words the metric contradicts is a reliable way to attract all five questions at once.

Consequences of a metric completed badly

The timing is what hurts. Planning permission can be granted with a poor metric, because the gain plan is a post-permission document. The reckoning arrives when the plan is submitted, the authority declines to approve it, and the site cannot lawfully start.

Illustrative example: a 40-unit scheme records a paddock as modified grassland in poor condition and proposes wildflower meadow to compensate. The council's ecologist visits, finds a species-rich sward, and reclassifies it as other neutral grassland in moderate condition. The baseline units rise, the proposed on-site planting no longer clears ten per cent, and the developer has to buy off-site units in the same national character area at short notice. The delay, not the survey fee, is the expensive part.

There is a second failure mode. Where on-site habitat is proposed that the layout cannot actually accommodate, the metric passes and the landscape scheme does not, and the mismatch surfaces at discharge of conditions. Root protection areas, adoptable highway margins, sub-station plots and attenuation basins all eat into the space a landscape drawing shows as new habitat, and the person entering the metric rarely sees the drainage layout unless someone sends it to them.

Briefing an assessor before the survey

Give them the red line boundary, the existing topographical survey, the draft layout and the landscape strategy, and give them all four before they visit. An assessor who arrives without knowing which parcels will be retained cannot advise on where value is being lost cheaply.

Ask for three things in the fee proposal:

  1. A stated survey window and a named surveyor with their qualifications and experience.
  2. A condition assessment recorded criterion by criterion, with the reasoning shown rather than a bare score.
  3. An indicative metric run at layout stage, before the drawings are fixed, so the design can respond.

That third point is where most of the money is saved. Retaining a hedgerow, widening a buffer or keeping a single mature tree is nearly free at sketch stage and impossible after the drainage layout is set.

The biodiversity net gain assessment that accompanies the application should tell the same story as the metric file and the landscape drawing. Where you want a specialist to review a draft before it goes in, PlanScope's professional directory is the route to a reviewer who can check and sign off the document.

The Environment Act 2021 regime expects the statutory metric to be completed by a competent person and the biodiversity gain plan to be approved by the local planning authority, so treat a PlanScope draft as a starting point for that professional rather than a substitute for them. For specialist technical reports, qualified professional input may be required. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Is there an official qualification for biodiversity net gain assessors?

No. Unlike a bat licence, there is no statutory registration for people who complete the statutory biodiversity metric. Competence is judged on ecological qualifications, membership of a professional body such as the Chartered Institute of Ecology and Environmental Management, documented habitat survey experience and familiarity with the current metric version and its user guide.

Can an architect or planning consultant complete the metric?

They can open the spreadsheet, and on a very simple site with amenity grassland and hardstanding the result may be defensible. The risk sits in habitat classification and condition assessment, which are field ecology judgements. Councils increasingly ask who carried out the survey, and a metric with no named surveyor and no survey date invites a challenge.

When does the biodiversity gain plan have to be approved?

After planning permission and before development begins. The biodiversity gain condition is deemed to be attached to most permissions, and the plan has to be submitted to and approved by the local planning authority. Building before approval is a breach of condition, so the metric needs to be right well ahead of the start on site.

What happens if the council disagrees with the habitat condition scores?

The authority can refuse to approve the biodiversity gain plan, ask for a resurvey, or require the scheme to deliver more units. Because condition scoring drives the baseline, a downgrade from good to moderate on a large parcel can turn a compliant scheme into a shortfall that has to be met off site or with statutory credits.

Does a small site need the same assessment?

Small sites use a simplified version of the statutory metric, but the ten per cent requirement and the need for a biodiversity gain plan still apply. The simplified route reduces the data entry rather than the ecological judgement, so the same competence question arises about who classified the habitats on the ground.

Sources and further reading

biodiversity net gainecologycompetenceenvironment act 2021developers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Who signs a Design and Access Statement

There is no signature block and no prescribed author for a Design and Access Statement. Article 9 of the DMPO 2015 says when one is needed and what it must explain.

Read article →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications6 min read

Whole life carbon assessment competence and scope

The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →