Planning Process

The consultation period and whether late comments count

7 min readBy PlanScope Editorial Team

The statutory publicity period is a minimum, not a cut-off for material considerations. How the period is set, when a late objection still counts, and what happens once committee papers are published.

A late planning objection can still count. The publicity period sets the minimum time the council must allow for comments and the earliest date it may decide, and the statutory minimum is 21 days from the day a site notice is first displayed. What the period does not do is switch off the council's duty under section 70(2) of the Town and Country Planning Act 1990 to have regard to material considerations. A point that is material and arrives before the decision is made has to be considered, whatever the deadline on the website said.

The practical caveat matters as much as the legal position. A comment arriving the afternoon before a delegated decision is signed may be read by nobody in time.

How the period is set and when it starts

The Development Management Procedure Order 2015 requires publicity for planning applications, and the route depends on the type of development. Site display, a letter to adjoining occupiers, and a newspaper advertisement for major, departure and certain other applications.

The minimum representation period runs from the date the publicity took place rather than from the date the application was validated, which is why the closing date on a council's website sometimes looks out of step with the registration date. Where publicity is by site notice the minimum is 21 days. Where it is by newspaper advertisement or a neighbour letter the statutory minimum is shorter, though many authorities apply 21 days across all routes as a matter of practice.

Check the specific dates on the council's own page for the application. And check whether the site notice was actually displayed, because a notice that blew off a lamp post is a real issue and the council can be asked to re-publicise.

What the authority must take into account

Two duties operate together. The Order requires the authority to take into account representations made within the publicity period, and prevents it from determining the application before that period has ended. Section 70(2) of the 1990 Act requires it to have regard to the development plan and to any other material considerations when it makes the decision.

The second duty has no cut-off date attached. So the answer to whether a late comment counts depends on whether it raises something material, and on whether it arrives while the decision is still to be made.

What is material is a legal question rather than a matter of strength of feeling. Loss of privacy, highway safety, effect on a listed building, noise, flood risk, loss of trees, conflict with an adopted policy: material. Loss of property value, competition with an existing business, the identity of the applicant, a private boundary dispute, a restrictive covenant: not material in planning terms, however genuine.

A late representation raising a material matter nobody had spotted is far more useful than an early one repeating a point already made forty times.

Late representations before the decision

For an application to be decided by officers under delegated powers, the comment needs to reach the case officer before the decision notice is issued. There is no public warning that a delegated decision is imminent.

Three things help. Ask the case officer by email when they expect to determine the application, and note the eight or thirteen week target date shown on the register. Ask to be notified of the outcome. And if you have a material point, send it as soon as you have it rather than polishing it.

Where a comment arrives after the decision, it is too late in practical terms. The routes that remain are narrow: a challenge by judicial review, which has a six-week time limit for planning decisions and needs a legal error rather than a disagreement, or engagement with any subsequent application or condition discharge.

Comments arriving after committee papers are published

Committee agendas and reports have to be published at least five clear days before the meeting, under the access to information rules in the Local Government Act 1972. Representations received after that point cannot be in the printed report.

They are normally dealt with in one of two ways. An update or addendum report circulated to members before or at the meeting, summarising late representations and the officer's response. Or a verbal update from the officer at the meeting itself.

Neither is guaranteed. Whether a late point makes it into the update sheet is a matter of officer judgement and timing, so if you are objecting to an application heading for committee, work to the agenda publication date rather than the consultation deadline. Registering to speak is a separate process again, run under the council's own constitution with its own earlier deadline, often two or three working days before the meeting.

Reconsultation on amended plans

Amended plans submitted during the application are common, and there is no automatic statutory duty to start the publicity again. The authority has to consider whether the changes are material enough that fairness requires further consultation, and practice varies widely between councils.

The test people find useful is whether the amendment introduces a new effect on someone who has not had the chance to comment on it. A reduction in height is unlikely to require it. Moving a vehicle access to a different frontage almost always does. The position on re-consultation after amended plans goes into the detail, and if a scheme has changed in a way that affects you, asking for a fresh period in writing is a reasonable request to put.

Amended plans also reset what you are objecting to. An objection to the original drawings, left standing, may be recorded against a scheme that no longer exists.

Officer discretion and its limits

Case officers have real discretion over process and much less over substance.

They can decide how to summarise representations in a report, whether to include a late point in an update sheet, whether to re-publicise amendments, and whether to recommend approval or refusal. They cannot lawfully leave a material consideration out of account, and they cannot refuse to receive a representation.

They also have no duty to reply individually to objectors, to agree with any of them, or to explain why a point carried no weight. That is often what feels unfair, and it is not a procedural failure.

Where the report misrepresents an objection, the practical remedy is to write to the committee members and the democratic services officer before the meeting, briefly and factually, with the correction. That does get read.

Practical timing for an objector

  1. Find the application on the council's register and note the publicity closing date, the target determination date and whether it is going to committee.
  2. Submit the substance of your comments within the publicity period, in writing, through the council's portal so there is a record.
  3. Frame every point as a material planning consideration and cite the adopted local plan policy number where you can.
  4. Ask to be notified of amendments, of the committee date and of the decision.
  5. If new information emerges, send it immediately, and copy it to the committee members if the item is already on an agenda.
  6. If the item goes to committee, register to speak by the council's deadline, which is earlier than the meeting.

Two habits make objections land better. Be specific about the effect on a named receptor, such as a particular window or a particular junction, rather than describing the scheme as unacceptable in general. And say what would address the point, because a suggested condition is something an officer can act on.

Reading the application documents properly is the other half of it. The statutory planning register tells you what must be available to view, and applications made by the council on its own land follow a slightly different route that is worth understanding if that is your situation.

If you want to know what an applicant should have submitted, the index of planning report types by category sets out the documents councils commonly expect for different kinds of development, which is a quick way to spot a gap in a submission. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Will the council ignore my objection if I miss the deadline?

Not necessarily. Section 70(2) of the Town and Country Planning Act 1990 requires the authority to have regard to material considerations when it makes the decision, and that duty has no closing date attached. The practical risk is different: a comment arriving shortly before a delegated decision is signed may not be read in time.

How long is the consultation period?

Where publicity is by site notice the statutory minimum is 21 days from the day it was first displayed. Where publicity is by newspaper advertisement or a letter to neighbours the minimum is shorter, though many councils apply 21 days across all routes. The period runs from the publicity date, not the validation date.

What happens to comments received after the committee report is published?

Agendas must be published at least five clear days before the meeting, so late representations cannot appear in the printed report. They are usually summarised in an update or addendum sheet, or reported verbally by the officer. Neither is guaranteed, so work to the agenda publication date rather than the consultation deadline.

Does the council have to consult again on amended plans?

There is no automatic statutory duty. The authority considers whether the change is material enough that fairness requires further publicity, and practice varies. The useful test is whether the amendment creates a new effect on someone who has not had a chance to comment on it, such as moving a vehicle access to a different frontage.

Which objections count as material planning considerations?

Loss of privacy, highway safety, noise, flood risk, effect on a listed building or trees, and conflict with an adopted policy all count. Loss of property value, competition with an existing business, the identity of the applicant, private boundary disputes and restrictive covenants do not, however strongly they are felt.

Can I do anything once permission has been granted?

The routes are narrow. A judicial review challenge has a six-week time limit for planning decisions and needs a legal error rather than a disagreement with the planning judgement. Otherwise, engagement shifts to the discharge of conditions and to any later application to vary the permission.

Sources and further reading

consultationobjectionsplanning processcommitteecommunityrepresentations

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Transferring a permission and a change of applicant

Section 75 makes a permission a benefit of the land, so a buyer acquires it on completion with no form or fee. The levy paperwork and undischarged conditions are where the risk sits.

Read article →
Planning Process8 min read

Decision notices: conditions, informatives and reasons

The permission is the description, the conditions and the drawings those conditions list. The officer report is not part of it, and a superseded drawing revision in the list is a real problem.

Read article →
Planning Process7 min read

Prior approval: the clock, deemed consent and the risks

Prior approval runs on a hard statutory deadline, and silence from the council can let development begin. The paper trail that silence leaves is rarely good enough for a lender.

Read article →
Planning Process7 min read

Permission time limits and what happens when one lapses

A permission that expires cannot be renewed. Keeping one alive means a material operation within the time limit, with every pre-commencement condition already discharged.

Read article →
Planning Process7 min read

Outline permission: what to fix and what to reserve

Access, appearance, landscaping, layout and scale can each be reserved, but reserving everything is rarely the least costly route. This sets out which to fix at outline and what the decision costs you later.

Read article →
Planning Process7 min read

Extensions of time and the eight week deadline

The eight week period is a deadline for the council, not a promise to you. Agreeing an extension helps the authority's performance figures and sometimes helps your application. Knowing when it does which is the useful part.

Read article →