Council Guides

Council CIL charging schedules: reading zones and indexation

6 min readBy PlanScope Editorial Team

The rate printed in a charging schedule is almost never the rate you pay. Indexation, zone boundaries and floorspace deductions all sit between the two.

The rate printed on a Community Infrastructure Levy charging schedule is almost never the rate you pay. Between the two sit indexation, the zone your site falls in, and the floorspace the council will let you deduct. On a scheme of any size those three variables move the number more than the headline rate does.

Reading a schedule properly takes about twenty minutes and saves an appraisal that is wrong by a six figure sum.

This is general guidance rather than legal advice. Levy rates and the regulations change, so work from the council's current published documents.

How a charging schedule is put together

A charging authority prepares a draft schedule, tests it against viability evidence, consults, and submits it for independent examination. The examiner checks that the rates strike an appropriate balance between funding infrastructure and the effect on the viability of development across the area. The schedule then takes effect from a date the council resolves.

Rates are expressed in pounds per square metre of net additional gross internal floorspace. They vary by development type, and most schedules set a nil rate for uses the viability evidence could not support, which frequently means offices, industrial floorspace and some town centre uses.

Two documents sit alongside the schedule and both matter: the map defining the charging zones, and the instalment policy.

Reading the zone map and the boundary problem

Zones exist because values differ across a district. A rural authority might charge a high rate in commuter villages, a middle rate in the market town and nothing on the edge of an urban area where values are lower.

The boundaries are lines on a plan, and they are frequently drawn along ward boundaries, parish boundaries or plan policy designations rather than anything you can see from the road. Two consequences follow. Sites near a boundary need checking against the actual map rather than a general impression of the area. And a site that straddles a boundary is apportioned, normally by reference to where the chargeable floorspace sits.

Ask the levy officer for written confirmation of the zone before the appraisal is finalised. It is a two line email and it prevents the argument that arrives with the liability notice.

Indexation and why the adopted rate is not the rate you pay

Indexation is the part most appraisals get wrong. The regulations index the adopted rate using construction cost indices published by RICS, comparing the index figure for the year the charging schedule took effect with the figure for the year the permission is granted.

A schedule adopted several years ago will therefore produce a demand well above its printed rate, and the gap widens with every year of construction cost inflation. Since the 2019 amendments, charging authorities publish an annual rate summary setting out the indexed rates for the current year. That summary is the working document.

Timing follows from this. Indexation is fixed by the year the permission is granted, so a permission granted in December and one granted in January of the following year can carry different rates. On a large scheme that is worth knowing when you decide whether to accept an extension of time.

Document What it tells you Where it lives
Charging schedule Adopted rates by use and zone, and the effective date Council levy pages
Charging zone map Which rate applies to your site Adopted with the schedule
Annual rate summary The indexed rates for the current year Published each year
Instalment policy Payment stages and trigger dates Council levy pages
Infrastructure funding statement Receipts, spending and planned infrastructure Published annually

Existing floorspace and what can be deducted

The charge falls on net additional floorspace, so what is already there can be deducted where it qualifies. The test in the regulations is that the building has been in lawful use for at least six continuous months within the three years ending on the day the permission first permits the development.

Evidence is the whole battle. Business rates records, utility bills showing consumption rather than standing charges, tenancy agreements, photographs and delivery records all help. A building that has stood empty for four years produces no deduction, which is why long vacant sites often carry a far larger charge than the owner expected.

Gross internal area includes basements, plant rooms and internal circulation, which is why basement floorspace in London boroughs so often pushes a scheme into a charge the applicant had not budgeted for. Measure to the internal face of the external walls and check the drawings agree with the schedule of areas on the form.

Instalment policies and payment windows

An instalment policy is discretionary. Where one exists it sets the number of payments, the proportion due at each stage and the trigger dates, usually running from the commencement date.

The policy almost always applies only where the commencement notice was served on time and liability was assumed before works began. Miss either and the full amount falls due shortly after commencement. On a phased scheme the policy may also treat each phase separately, which helps cash flow considerably where the permission is drafted with phases properly defined.

Read the policy alongside the development programme rather than after it. A trigger set at first occupation behaves very differently from one set at eighteen months after commencement.

Infrastructure funding statements after regulation 123

Regulation 123 lists, which used to define what the levy would be spent on and therefore what could not be sought through a section 106 obligation, were abolished in 2019. In their place, charging authorities publish an annual infrastructure funding statement.

The statement reports levy and obligation receipts, what has been spent, what is held, and the infrastructure the council intends to fund. It is worth reading before you negotiate contributions, because it shows whether the council is already collecting for the infrastructure it is asking you to fund again through an obligation.

Where the total burden threatens deliverability, the argument moves to viability. A Viability Assessment can address the level of affordable housing and obligations, though the levy itself is far harder to reduce, since the schedule was examined on area-wide viability evidence. Set the position out clearly in the Affordable Housing Statement as well, so the two documents tell a consistent story.

Checking whether your council charges at all

Not every authority has adopted a schedule. Some rely on section 106 obligations. Others have a schedule with a nil rate for the use you are proposing.

  1. Search the council's site for a charging schedule and note the date it took effect.
  2. Find the current annual rate summary and use its indexed figures.
  3. Locate your site on the charging zone map.
  4. Read the instalment policy and note the trigger dates.
  5. In Greater London, add the Mayoral levy, which is charged alongside the borough rate.
  6. Check the latest infrastructure funding statement before negotiating obligations.

That sequence gives you a defensible number for an appraisal. It also gives you the questions to put to the levy officer, who is usually a different person from the case officer and often quicker to answer.

Budget the reports the application itself needs alongside the levy. See PlanScope pricing for one free report, £50 per report, or Professional for unlimited reports.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Why is my CIL demand higher than the rate in the charging schedule?

Because the rate is indexed. The regulations apply an index based on the year the charging schedule took effect and the year the planning permission was granted, using construction cost indices published by RICS. Councils publish an annual rate summary with the current indexed figures. Use that summary for appraisals, not the adopted schedule.

What happens if my site straddles two charging zones?

The council apportions the chargeable floorspace between the zones, usually by reference to where the buildings sit rather than by land area. Zone boundaries follow lines on the charging schedule map, and those lines are not always drawn along features you can see on site. Ask the levy officer to confirm the split before you appraise the scheme.

Can I deduct the building I am demolishing?

Usually, if it qualifies as an in-use building. The regulations allow floorspace to be deducted where the building has been in lawful use for at least six continuous months within the three years before the permission first permits the development. Keep utility bills, business rates records and tenancy documents, because the council will ask for evidence.

Do all councils charge the levy?

No. Adopting a charging schedule is optional, and some authorities rely on section 106 obligations instead. Others charge a nil rate for some uses and a positive rate for others. Check the council's levy pages for an adopted schedule, its effective date, and whether an update has been examined since.

What replaced the regulation 123 list?

The infrastructure funding statement. Since the 2019 amendments, charging authorities publish an annual statement setting out levy and section 106 receipts, what has been spent, and the infrastructure they intend to fund. It is the document to read when you want to know whether a contribution the council is seeking is already covered by the levy.

Sources and further reading

cil charging schedulecommunity infrastructure levyindexationdeveloper contributionsinfrastructure funding statementviability

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Council Guides

View all →
Council Guides7 min read

Tree Preservation Order registers and how to check them

Checking a TPO needs the order and its sealed map, not just the council's GIS layer. Individual, group, woodland and area classifications each behave differently, and the exemptions are riskier than they read.

Read article →
Council Guides7 min read

Searching a council planning register properly

The council portal is a search front end to the statutory planning register, not the register itself. How to search by map rather than address, trace pre-1996 records, and request files that were never scanned.

Read article →
Council Guides6 min read

Schemes of delegation: when a decision goes to committee

Most planning applications are decided by officers under delegated powers. The scheme of delegation sets out which ones are not, and that changes your timetable.

Read article →
Council Guides7 min read

Adopted parking standards: maximum, minimum and where they bind

A maximum caps provision, a minimum sets a floor, and whoever departs from either carries the evidence. This covers where standards sit in the plan, how accessibility zones work and what a departure needs.

Read article →
Council Guides7 min read

Supplementary planning documents and how far they bind

SPDs elaborate adopted policy and cannot create new requirements. This sets out the procedural basis for their weight, where design guides and parking standards are contestable, and how to cite one properly.

Read article →
Council Guides7 min read

Emerging local plans and the weight they carry

Weight attaches to individual emerging policies, not to plans. This sets out the three national tests, how weight moves through examination, and how to use main modifications in a planning case.

Read article →