Daylight, Sunlight and Amenity

Courtyard schemes and daylight to the lower floors

7 min readBy PlanScope Editorial Team

Courtyard daylight is fixed at massing stage by the angle from a lower window to the eaves opposite. What the arithmetic implies for plot width, which units suffer, and how to report the result honestly.

Courtyard daylight is decided at massing stage, and by arithmetic that does not care how good the rest of the scheme is. A perimeter block obstructs its own lower floors, and the controlling variable is the angle from a ground-floor window up to the eaves of the building opposite. The rule of thumb in the BRE guidance on site layout planning for daylight and sunlight is that an obstruction angle below about 25 degrees, measured from a point roughly two metres above ground level, suggests daylight is likely to be adequate. Convert that into plan dimensions and a courtyard needs to be somewhere near twice as wide as the surrounding buildings are tall before the ground floor is comfortable.

Most urban schemes cannot afford that. So the practical question becomes which units take the hit, and what goes in them.

The geometry that governs courtyard daylight

Three dimensions do almost all the work: the height of the opposing facade above the window being assessed, the horizontal distance to it, and the head height of the window itself.

The first two set the obstruction angle. The third sets how far daylight penetrates into the room, because sky visible high in the window reaches deeper than sky visible low in it. A room with a 2.1 metre window head is a different proposition from the same room with a 2.6 metre head, even though the obstruction has not changed.

Floor-to-floor height is therefore a daylight variable as much as a cost and planning-height variable. Where a scheme is squeezing storey heights to fit a height limit, the ground-floor units pay for it twice.

Width to height ratios that work

Here is the arithmetic, and it is illustrative rather than a standard.

Opposing facade height above the window Courtyard width for a 25-degree obstruction angle Typical outcome at ground floor
9m (three storeys) about 19m Workable with careful unit planning
12m (four storeys) about 26m Hard on a typical urban plot
15m (five storeys) about 32m Rarely achievable in a courtyard
18m (six storeys) about 39m Not achievable; plan for a different use at ground level

Two caveats. The 25-degree test is a screening rule, and failing it does not mean the scheme fails. It means the detailed assessment against the illuminance targets in the daylight standard has to do the work. And the height that matters is measured above the window in question, so a scheme stepping down towards its own courtyard performs better than the storey count suggests.

Where the ratio cannot be met, the honest response is to change the unit mix rather than to change the assumptions.

Corner units and the double obstruction problem

A window near an internal corner sees sky through a narrower wedge than a window in the middle of the same elevation, because two facades obstruct it rather than one.

Corner plans make this worse when the designer does what is natural and puts a single window on each face of the corner room. Each window is close to a return wall, both look into the obstructed wedge, and the room's total sky access is lower than either window suggests in isolation.

Better moves exist. Chamfer or set back the corner to open the wedge. Place the corner unit's habitable rooms on the outer elevations and put the bathroom and circulation in the corner itself. Or accept a non-residential use in that position at ground and first floor.

The assessment has to reflect the real geometry on both sides of the boundary, which is the same consistency point that arises in a mirror-image massing test.

Ground and first floor unit types

This is where a scheme is won or lost, and it is a layout decision rather than a modelling one.

Dual-aspect units are the single most effective response. A unit with a window to the street and a window to the courtyard is not relying on the obstructed elevation for its daylight. Single-aspect units facing only into a deep courtyard at ground floor are the ones that generate the long list of failures in an appendix.

Maisonettes help, by putting the living space at first floor where the obstruction angle is lower and the bedroom below. So does raising the ground floor slab half a storey, which lifts every window head and gives the ground floor a defensible threshold at the same time.

And some ground-floor courtyard frontages should not be homes. Cycle stores, plant, a concierge, a workspace unit or a commercial tenancy in the worst positions is a better answer than five dwellings that need explaining at committee.

Balconies compounding the loss

Inset and recessed balconies on a courtyard elevation are the combination that produces the worst numbers, because the soffit above the window removes the highest and most useful part of the sky view before the courtyard geometry has even been considered.

The mitigations are known and each has a cost. Reduce the balcony depth. Make it a projecting balcony rather than an inset one, so the soffit is outside the window plane. Use a glazed or perforated balustrade. Keep balconies off the lowest two floors of the courtyard elevation and provide amenity space elsewhere for those units.

Model the balconies as built, with the soffit as the darker surface it is. An assessment that models an inset balcony as an open reveal is not modelling the scheme.

Light-coloured finishes and their real effect

Pale courtyard facades do help, and the effect is real in a tight court where much of the light arriving at a lower window has bounced off the wall opposite. It is also limited, dependent on the specification being secured, and reduced by weathering.

Treat it as the last percentage point rather than the fix. If a scheme only works with high external reflectance, the officer needs to know that, and a condition securing the finish becomes reasonable.

Reporting the worst units rather than an average

Block averages hide exactly what a planning officer is being asked to accept.

Report by unit reference and room. Give the number and proportion of rooms meeting the target illuminance, the number falling short, and by how much. List the worst ten rooms with their location, aspect and the reason they underperform. Where a room fails, say what it is: a single-aspect ground-floor living room under an inset balcony on the north side of a court eighteen metres wide.

That level of candour does better at committee than a summary table showing 87 per cent compliance, because the officer can see that the failures are concentrated and explain why the scheme is still acceptable. It also tells you which four units to redesign.

Sunlight to the courtyard itself is a separate test. The BRE guidance looks for a proportion of an amenity area receiving a period of sun on 21 March, and a deep court with buildings on all four sides frequently fails it. An Overshadowing Study sets that out, and the results usually point to opening a corner of the block rather than to anything subtler.

If you are still establishing whether the assessment is needed, start with when a daylight and sunlight assessment is required, and the Daylight and Sunlight Assessment page sets out what the document covers. Councils usually expect a suitably qualified author for this work, and professional review is strongly advised.

PlanScope can produce an AI-assisted draft of the supporting narrative and flag the inputs that must come from the modeller, with missing site data marked rather than invented. It does not run the daylight model. Reports should be reviewed before submission, and PlanScope does not guarantee planning approval. For specialist technical reports, qualified professional input may be required. Enter your postcode on PlanScope to see which reports a courtyard scheme is likely to need. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

How wide does a courtyard need to be for good ground-floor daylight?

As a screening rule, roughly twice the height of the surrounding buildings measured above the window being assessed, which corresponds to the 25-degree obstruction angle in the BRE guidance. A four-storey perimeter block would need a court around 26 metres wide, which is more than most urban plots allow.

Does failing the 25-degree rule mean the scheme is unacceptable?

No. It is a screening test, and failing it moves the assessment on to detailed modelling against the illuminance targets in the daylight standard. What it does tell you is that the ground and first floor unit mix needs attention before the layout is fixed, rather than afterwards.

Why do corner units perform badly?

A window near an internal corner sees sky through a narrower wedge because two facades obstruct it rather than one. Putting a single window on each face of a corner room compounds the problem, since both look into the obstructed wedge. Chamfering the corner, or placing bathrooms and circulation there, works better.

How much do inset balconies affect courtyard daylight?

Substantially, because the soffit above the window removes the highest and most useful part of the sky view before the courtyard geometry is considered. Projecting balconies, shallower depths, glazed balustrades, and keeping balconies off the lowest two floors of the courtyard elevation are the usual responses.

Should results be reported as an average for the block?

No. Report by unit reference and room, with the number of rooms meeting and falling short of the target and by how much, and list the worst rooms with their aspect and the reason. Concentrated failures that are explained read better at committee than a single compliance percentage.

Does sunlight to the courtyard itself get assessed?

Yes, separately. The BRE guidance looks at the proportion of an amenity area receiving a period of sun on 21 March, and a deep court enclosed on all four sides often fails. The usual remedy is opening a corner of the block rather than a detailed design change.

Sources and further reading

daylightcourtyardperimeter blockmassingdeveloperamenity

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Daylight, Sunlight and Amenity

View all →
Daylight, Sunlight and Amenity6 min read

Daylight to rooms behind deep balconies and access decks

The obstruction is your own building. How projection, soffit height and balustrade choice change the daylight result, and what the assessment has to show.

Read article →
Daylight, Sunlight and Amenity8 min read

Adequate natural light as a Class MA prior approval matter

Adequate natural light carries a duty to refuse, not a discretion to weigh, and it is assessed on your drawings. Here is what to submit and how deep floorplates are made to work.

Read article →
Daylight, Sunlight and Amenity7 min read

Overshadowing of a public park by a tall building

The sun on ground test gives one number for an amenity space. A park is many spaces. Here is how to zone it, baseline it and report it so the result survives committee.

Read article →
Daylight, Sunlight and Amenity7 min read

Obscure glazing conditions and their daylight effect

Obscuring glass leaves the geometric daylight metrics untouched and alters everything calculated from transmittance. What changes, what does not, and the alternatives.

Read article →
Daylight, Sunlight and Amenity8 min read

Amenity harm and the presumption in favour of development

A failed Vertical Sky Component test is an input, not a reason for refusal. How to turn daylight findings into weight an inspector can use in the planning balance.

Read article →
Daylight, Sunlight and Amenity7 min read

Measuring existing windows for a daylight survey

External geometry can be measured from the street. Room depth and room use cannot, and that is where most daylight assessments are challenged at committee and on appeal.

Read article →