Creating a natural burial ground on farmland

6 min readBy PlanScope Editorial Team

A natural burial ground is decided on hydrogeology before landscape. What to test first, and how the usable area is usually smaller than the field.

A natural burial ground on farmland is a change of use to a sui generis use, and the application is decided less on countryside policy than on hydrogeology. The Environment Agency's position on burials and groundwater is what shapes the site layout, the grave depth, the usable area and, quite often, whether the proposal is viable at all.

Start with the water, then the access, then the landscape. Owners who start with the landscape design tend to produce a beautiful plan across ground that cannot be used.

Change of use of agricultural land

Burying human remains on land not previously used for that purpose is a material change of use, and it needs planning permission. A burial ground is not an agricultural use, and no permitted development right reaches it.

The permanence of the change is the point officers keep returning to. Land used for burial is, in practice, committed indefinitely, so the decision is treated as irreversible even though the physical works are slight. That raises the evidential bar on long-term management well above what a comparable diversification scheme would face.

Where the land is Green Belt, cemeteries and burial grounds have been treated in national policy as a form of development that is not inappropriate provided openness is preserved. Check the current edition of the Framework before relying on that, and design to preserve openness rather than assuming the label does the work.

Where the land is best and most versatile agricultural land, expect a question about its loss. An agricultural land classification survey answers it with evidence rather than assertion, and a site on grade 3b or poorer removes the issue entirely.

Groundwater protection and the Environment Agency position

This is the decisive constraint and it should be tested before any money is spent on design.

The Environment Agency publishes position statements on groundwater protection that cover burial sites. They set out separation distances from wells, springs and boreholes used for drinking water, from watercourses and springs, and from field drains, together with a requirement for a depth of unsaturated subsoil beneath the base of each grave and a prohibition on graves standing in water.

Verify the current figures against the published statements rather than a summary, because they are revised. Then apply them to your site with a soil survey and trial pits, at the lowest-lying part of the field and at the time of year when the water table is highest.

The result is usually a smaller usable area than the owner expected. A field of five hectares may yield two once the watercourse buffer, the field drain offsets, the wet corner and the access arrangements are taken out. Establish that number before the business case is built on the larger one.

Source protection zones and the distance tests

Check whether the site sits within a groundwater source protection zone using the published mapping. Zones are defined around public water supply abstractions and are graded by the travel time of water to the source.

Development involving burial within the innermost zone is very unlikely to be acceptable, and sites in the wider zones will attract close scrutiny and may require a hydrogeological risk assessment prepared by a specialist.

That assessment is not a planning report. It is technical work for the Environment Agency, using ground investigation data, groundwater levels and a conceptual site model. Where it is needed, commission it early, because a negative result ends the project and a late negative result ends it expensively.

Private water supplies matter as much as public ones. A neighbouring farm borehole serving a dwelling triggers the same separation requirements, and its location may not be recorded anywhere you would naturally look.

Access, parking and the funeral procession

Traffic at a burial ground is infrequent and concentrated, which is a familiar pattern for rural highway officers and a manageable one.

Set out the expected number of burials a year, the vehicle numbers per service, and the arrival and departure profile. Then show the access geometry, the visibility splays measured against actual traffic speeds, and the swept path for a hearse and a limousine on the approach and within the site.

Parking needs to work on grass in February. Show a bound or reinforced surface for the disabled spaces and the turning area at minimum, and an overflow arrangement for the occasional large service. A vehicle stuck in mud at a funeral is the sort of event that generates a complaint to the council rather than to you.

A short transport statement covering the access, the parking and the movement profile is usually proportionate. Include a note on how the site is managed when a service is taking place, because visitors and mourners arriving at once is the peak the design has to handle.

Planting, memorials and the absence of headstones

The landscape case is the easy part, and it is where a natural burial ground earns its support.

Describe the planting as habitat rather than as decoration. Species-rich grassland managed by an annual cut and removal, hedgerow restoration on the boundaries, individual trees or a woodland block with a species mix appropriate to the local landscape character, and no hard landscaping beyond the access and the parking.

Memorials are the detail to pin down in the application. Say what is permitted, whether that is a flat marker flush with the ground, a tree plaque, a shared memorial structure or nothing at all. Councils condition this, and a scheme that proposes its own restriction is easier to grant than one that leaves it open.

A landscape strategy setting out the planting, the management regime and the phasing links the visual case to the habitat case. Where biodiversity net gain applies to the application, the same planting is doing double duty, and the metric work should be run alongside the design rather than after it.

Long-term management and the obligations that secure it

This is what worries officers most, and rightly. A burial ground has to be maintained long after the burials stop and long after the current owner has gone.

Set out the management structure. Who owns the land in the long term, what body or trust is responsible for maintenance, how it is funded, and what happens if the business ceases trading. A management plan secured by condition, with a funded maintenance mechanism secured by a planning obligation, is the usual answer on a scheme of any size.

Record keeping belongs here too. A burial register recording each interment and its precise location is a practical necessity and an obligation you should describe in the application rather than leave implied.

Put the whole case, including the need, the groundwater evidence, the access and the management arrangements, into the planning statement so that the officer can follow the argument in one document. If you want to see which supporting reports a site of this kind is likely to need, the types are listed under planning documents.

This is general guidance, not legal advice. Groundwater protection requirements, Green Belt policy and local plan policy change, so check the position with the Environment Agency, your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission for a natural burial ground?

Yes. Burying human remains on land not previously used for that purpose is a material change of use to a sui generis use, and no permitted development right reaches it. Officers treat the change as effectively permanent, which raises the evidential bar on long-term management well above a comparable farm diversification scheme.

What does the Environment Agency require for burial sites?

Its published groundwater protection position statements set separation distances from wells, springs and boreholes used for drinking water, from watercourses and springs and from field drains, together with a required depth of unsaturated subsoil beneath the base of each grave and a prohibition on graves standing in water. Verify the current figures against the published statements.

How much of my field will actually be usable?

Usually less than expected. Once the watercourse buffer, field drain offsets, wet ground and access arrangements are removed, a five hectare field may yield two hectares of usable burial area. Establish that figure with a soil survey and trial pits, dug at the lowest part of the site when the water table is at its highest, before building any business case.

Can a burial ground go in the Green Belt?

National policy has treated cemeteries and burial grounds as a form of development that is not inappropriate in the Green Belt provided openness is preserved. Check the current edition of the Framework before relying on that, and design the scheme to preserve openness, with minimal built form, rather than assuming the policy label settles the matter.

What happens to the site in fifty years?

That is the question officers worry about most. Set out who will own the land long term, which body or trust maintains it, how maintenance is funded and what happens if the business ceases trading. A management plan secured by condition with a funded maintenance mechanism secured by obligation is the usual answer.

Sources and further reading

natural burialchange of usegroundwaterrural diversificationfarmland

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Project Type Guides

View all →
Project Type Guides8 min read

Planning permission for a gym in a vacant retail unit

Shops and indoor fitness both sit in Class E, so the use change is not development. What decides a gym conversion is an old retail condition, structure-borne noise from free weights, and the works to the shopfront.

Read article →
Project Type Guides7 min read

Planning permission for a zip wire course in woodland

A woodland zip wire course needs full planning permission, and the case turns on ancient woodland status, what the anchors and platforms do to the trees, and whether the access can take visitor traffic.

Read article →
Project Type Guides7 min read

Permission for housing on a car showroom site

A car showroom redevelops on its contamination report. Staging the intrusive investigation around demolition is what determines the programme.

Read article →
Project Type Guides7 min read

Permission for a rooftop extension to a car park

Development above a multi storey car park stands or falls on column and foundation capacity. Get the intrusive structural appraisal done before anything else is commissioned.

Read article →
Project Type Guides6 min read

Permission for a restaurant terrace on the pavement

Removable tables on the public footway need a pavement licence. A terrace on your own forecourt is a planning matter. Most disputes come down to where the highway edge sits.

Read article →
Project Type Guides7 min read

Permission for new gates and railings to a listed house

Boundary structures at a listed house are usually part of the listing, and permitted development rights for means of enclosure do not apply within the curtilage. Both consents are needed.

Read article →