Crown development and how it gets determined

6 min readBy PlanScope Editorial Team

Prisons, barracks and government offices go through the planning system like anything else, with a handful of special routes for urgency and national security.

Crown development is subject to planning control. That has been the position in England since June 2006, when the Planning and Compulsory Purchase Act 2004 removed Crown immunity and inserted a dedicated Part into the Town and Country Planning Act 1990. A government department building a prison, a barracks or a laboratory applies to the local planning authority in the ordinary way, pays a fee, and gets a decision it can appeal.

The special routes exist for a narrow class of case: development that is nationally important and urgent, and development where national security limits what can be put in the public domain.

What counts as Crown development

Crown land, for these purposes, is land in which there is a Crown interest or a Duchy interest. That takes in land belonging to a government department, land held by the Crown Estate, and land of the Duchy of Cornwall and the Duchy of Lancaster. The appropriate authority for each is identified in the Act, and it is the body that makes the application or gives consent to someone else making one.

Local authority development is not Crown development, and is dealt with under the separate 1992 General Regulations. Nor are the many bodies that feel governmental but are not the Crown, such as most non-departmental public bodies, so check the legal status of the applicant before assuming a special route is available.

An ordinary Crown application looks like any other on the register. It carries the same validation requirements, the same publicity, the same consultation with statutory consultees and the same determination periods, and the same rules on publicity for major development apply.

The ordinary route through the local authority

Most Crown development goes here, and there is little that is distinctive about it. The application is made to the local planning authority, decided against the development plan under section 38(6) of the Planning and Compulsory Purchase Act 2004, and appealable to the Planning Inspectorate if refused or not determined in time.

Where the authority sits on it, the same options apply as for anyone else, including the approach set out in appealing non-determination instead of waiting.

Two practical differences are worth noting. Crown applications on operational sites often involve constraints that cannot be fully described in a public document, which changes how the supporting statements are written. And the consultation body list tends to be longer, with the Ministry of Defence safeguarding team, the Civil Aviation Authority or the Health and Safety Executive appearing on schemes where they would not otherwise.

Fees are payable in the ordinary way, and a Crown application is counted in the authority's performance statistics like any other, so there is no procedural incentive for a council to treat it differently.

Applications made to the Secretary of State

Section 293A of the Town and Country Planning Act 1990 provides a route for urgent Crown development. It can be used where the appropriate authority certifies that the development is of national importance and that it is necessary that the development be carried out as a matter of urgency.

Both limbs have to be satisfied. National importance without urgency does not open the route, and urgency on a locally important scheme does not either. The application goes to the Secretary of State, who may hold an inquiry or a hearing, and who determines it in place of the local authority.

The Levelling-up and Regeneration Act 2023 added a further route for Crown development of national importance without requiring the urgency test, with the detail carried in regulations. Commencement and the procedural detail have been brought forward in stages, so confirm the current position and the applicable regulations on gov.uk before choosing a route.

How the urgent procedure differs

The shortened procedure trades local determination for speed, and the safeguards shift rather than disappear.

Feature Ordinary application Urgent Crown route
Decision maker Local planning authority Secretary of State
Certification needed None National importance and urgency
Publicity Standard DMPO requirements Notice given as directed, often compressed
Local authority role Determines Consulted, and reports on local issues
Appeal To the Planning Inspectorate No appeal against the Secretary of State's decision

The local planning authority is consulted and its views on local planning issues are taken into account, but it does not decide. Third parties can make representations, and an inquiry may be held where the issues warrant it, though the timetable will be tighter than a standard call-in inquiry.

Choosing the route is a judgement made before the application is prepared, because the evidence base differs. A case for the urgent route has to document why the timetable cannot accommodate an ordinary application, with reference to operational need rather than to programme convenience, and the certificate is open to challenge if the reasoning is thin.

National security and closed material

Section 321 of the Act allows a direction that evidence relating to national security, or to the security of premises or property, be heard otherwise than in public. Where that happens, a special advocate can be appointed to represent the interests of those excluded from the closed session.

For an applicant, the practical effect is on the supporting documents. Technical reports may need a public version and a closed version, and the environmental information supplied for an environmental impact assessment has to be handled carefully because the EIA Regulations assume publication. Agree the approach with the determining body early, and expect the redaction exercise to take longer than the drafting.

Where the site adjoins a designated habitat, the appropriate assessment work still has to be done and disclosed in a usable form, as set out in habitats regulations assessment and what an applicant supplies.

Enforcement and where immunity still bites

One honest caveat on all of this. The special routes are used rarely, and the great majority of defence, prison and government office schemes go through the ordinary application process with a standard supporting document set.

Removal of immunity did not make the Crown liable in exactly the same way as a private owner. The Act makes special provision for enforcement in relation to Crown land, including restrictions on entering land and on criminal liability, and consent from the appropriate authority is needed for certain steps.

In practice, disputes are resolved by correspondence between the authority and the department rather than by notice and prosecution. That is a weaker position for a council than it has against a private developer, and it is one reason that conditions on Crown permissions tend to be drafted with more precision than usual.

The supporting statements for a Crown application are conventional. A Planning Statement setting out the policy case, the need argument and the alternatives considered does most of the work, with the national importance case carried in a separate certificate where the urgent route is used.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does the Crown need planning permission?

Yes. Crown immunity from planning control in England was removed in June 2006 by the Planning and Compulsory Purchase Act 2004, which inserted a dedicated Part into the Town and Country Planning Act 1990. Government departments apply to the local planning authority, pay fees and are bound by conditions in the ordinary way.

What is an urgent Crown development application?

An application made directly to the Secretary of State under section 293A of the Town and Country Planning Act 1990, available where the appropriate authority certifies that the development is of national importance and must be carried out urgently. Both limbs must be met, and the local planning authority is consulted rather than deciding.

Can the public object to Crown development?

Yes. Ordinary Crown applications carry the same publicity and consultation requirements as any other. On the urgent route, notice is given as directed and representations can be made to the Secretary of State, with an inquiry or hearing held where the issues justify it, though on a compressed timetable.

Is Ministry of Defence land always Crown land?

Land held by the Ministry of Defence is Crown land, but defence estate is sometimes held through other structures, and contractors operating on the estate are not the Crown. Check who holds the interest and who the appropriate authority is before assuming a Crown route applies to a particular site.

Can a council enforce against the Crown?

The Act makes special provision for enforcement in relation to Crown land, including limits on entry and on criminal liability, and some steps need the appropriate authority's consent. Breaches are usually resolved through correspondence between the council and the department rather than through notices and prosecution.

Sources and further reading

crown developmentplanning processsecretary of statedefenceprocedure

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Transferring a permission and a change of applicant

Section 75 makes a permission a benefit of the land, so a buyer acquires it on completion with no form or fee. The levy paperwork and undischarged conditions are where the risk sits.

Read article →
Planning Process8 min read

Decision notices: conditions, informatives and reasons

The permission is the description, the conditions and the drawings those conditions list. The officer report is not part of it, and a superseded drawing revision in the list is a real problem.

Read article →
Planning Process7 min read

Prior approval: the clock, deemed consent and the risks

Prior approval runs on a hard statutory deadline, and silence from the council can let development begin. The paper trail that silence leaves is rarely good enough for a lender.

Read article →
Planning Process7 min read

Permission time limits and what happens when one lapses

A permission that expires cannot be renewed. Keeping one alive means a material operation within the time limit, with every pre-commencement condition already discharged.

Read article →
Planning Process7 min read

Outline permission: what to fix and what to reserve

Access, appearance, landscaping, layout and scale can each be reserved, but reserving everything is rarely the least costly route. This sets out which to fix at outline and what the decision costs you later.

Read article →
Planning Process7 min read

Extensions of time and the eight week deadline

The eight week period is a deadline for the council, not a promise to you. Agreeing an extension helps the authority's performance figures and sometimes helps your application. Knowing when it does which is the useful part.

Read article →