The argument in daylight review is almost never about the test. It is about reflectance, geometry, room use assumptions and the baseline that was run.

Daylight model inputs challenged in review are rarely the test or the target. Both sides usually agree that the vertical sky component matters, or that the climate-based target illuminance applies. The argument is about reflectance values, what geometry was included, which rooms were assessed and how the windows were mapped to them, because those choices move results by more than the difference between a pass and a fail.

A reviewer who cannot reconstruct the model from the submitted document cannot verify it. So the practical standard is not whether the modelling is right. It is whether someone else could repeat it and get the same number.

Geometry and the level of detail modelled

Start the audit with what is in the model and what is not.

Window reveals, overhangs, balconies, projecting fins, external walkways and deep soffits all reduce the sky visible from a reference point, and omitting them inflates results. Balconies on the proposed building are the most frequent omission, and on a single-aspect flat they can be decisive, as our note on daylight to single aspect flats sets out.

Then look outwards. The extent of surrounding context included should be stated with a radius or a boundary, and should extend far enough that further buildings would not subtend meaningful angles at the assessed windows. Terrain matters on a sloping site, because a flat ground plane in a model on a 1 in 12 street produces systematically wrong results.

Ask three questions of any geometry schedule. Was the surveyed or the drawn building line used for existing neighbours. Were roof forms modelled or simplified to a flat plane at ridge height. And were trees included, excluded, or represented as a permeable obstruction with a stated transmission value.

Surface reflectance values and their justification

Reflectance is where the largest unjustified gains appear, particularly in internally reflected component and climate-based calculations.

Surface Commonly used value Audit point
External obstruction faces 0.20 Raising this to brighten the result needs evidence
Ground plane 0.20 Higher values need a stated surface finish
Internal ceiling 0.70 Check it matches the specified finish
Internal walls 0.50 Values above this need a specification reference
Internal floor 0.20 Dark finishes reduce results materially

Figures of this kind are conventions drawn from the guidance and from CIBSE practice, and they should be reported as assumptions rather than facts. Where a scheme relies on a value outside the usual range, the assessment should name the finish, its measured or published reflectance, and the condition that will secure it. A model using 0.8 internal wall reflectance to pass a target, with no specification behind it, is not an assessment of the building that will be built.

External reflectance deserves equal attention on courtyard and light well schemes, where a light-coloured facade opposite does change the result materially. The point is to evidence it, not to assume it.

Glazing transmittance, frame factor and maintenance

Three multipliers sit between the aperture and the light, and all three get quietly optimised.

Light transmittance depends on the glazing build-up. Clear double glazing sits in the region of 0.7, and triple glazing and solar control coatings reduce it further. The transmittance used should come from the specified unit, not from a generic default, and where the unit is not yet specified the assessment should say which value was assumed and what happens if a lower one is chosen.

Frame factor is the proportion of the aperture that is glass. Slim aluminium systems and chunky composite systems differ enough to matter, and a frame factor taken from a schematic elevation rather than a window schedule is a weak input.

A maintenance or dirt factor accounts for soiling of the glass. It is routinely omitted, and omission is conservative in the wrong direction.

Report all three in a table, with the source for each. Where the glazing specification is a condition rather than a commitment, say so.

Existing obstructions and the baseline

The baseline choice frames everything that follows, and it should be stated explicitly.

The existing condition is the normal starting point for neighbouring amenity tests. But where a consented but unbuilt scheme sits between the application site and the receptor, an assessment may present a consented baseline as well, and a reviewer should see both. Running only the baseline that produces the better answer, without saying so, is the single most common criticism in review.

Temporary structures, scaffolding, hoardings and trees of uncertain longevity should be identified and their treatment explained. Construction stage effects are a separate question with their own approach, discussed in temporary loss of daylight during construction.

Room use assumptions and window mapping

This is the input a reviewer can most easily test and most often finds wrong.

For neighbouring properties the internal layout is usually unknown, so assumptions have to be made and stated. The defensible method is to derive layouts from the external fenestration, the property type and whatever evidence exists, including sales particulars, historic applications and the authority's records, and then to say what was assumed for each window.

  • Which rooms are treated as main habitable spaces, and which as kitchens, bathrooms, halls or circulation.
  • How combined living, kitchen and dining rooms are treated, and whether a separate assessment point was used for the kitchen area.
  • Which window serves which room, where a room has more than one, and whether rooms were assumed to be single aspect.
  • Room depth and the reference plane height used for the no-sky line.

Where an assumption is uncertain, the honest response is a sensitivity test rather than a confident single figure. A reviewer will accept a range with the reasoning far more readily than a precise number with a hidden assumption.

Sky models and climate files

The sky model has to match the metric. Vertical sky component and average daylight factor rest on the standard overcast sky, which is a defined luminance distribution rather than a weather condition. Reporting them against a climate file is a category error.

Climate-based modelling needs a weather file, and the choice is itself an input. State which file, which location it stands for, and which reference year, because a file for a city 60 kilometres away with a different cloud regime is not interchangeable. For overheating-adjacent work a design summer year is used instead of a test reference year, and conflating the two in one document causes confusion.

Sunlight calculations depend on the sun path rather than on a sky model, so state the latitude and the dates used, and confirm whether the assessment covers the whole year or only the winter period alongside it.

Documenting inputs so a reviewer can audit them

An assessment that can be audited includes an input schedule. Put it in an appendix and keep it to the facts.

  1. Software and version, and the calculation engine where these differ.
  2. Geometry sources, with drawing numbers and revisions, survey references and the context extent.
  3. A reflectance schedule by surface, with the source or specification for each value.
  4. Glazing transmittance, frame factor and maintenance factor, with the window schedule reference.
  5. Baseline cases run, and which is reported as the primary case.
  6. Room use and window mapping table for every assessed property.
  7. Sky model or climate file, dates and reference plane heights.
  8. Sensitivity tests carried out and their results.

Then supply model views: a plan and two axonometric screenshots showing the modelled context. Those three images answer half the questions a reviewer would otherwise raise in writing.

Local policy determines which tests carry weight in the first place, which is covered in local plan amenity policies and how they use BRE 209. Where sun on ground rather than skylight is the issue, the analysis belongs in an Overshadowing Study, and a Daylight and Sunlight Assessment carries the window-based tests. PlanScope drafts both to a structure that exposes the assumptions rather than burying them, and flags each site-specific input it cannot supply.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Which daylight model inputs are most often disputed?

Surface reflectance values, the level of geometric detail included, the room use and window mapping assumed for neighbouring properties, and which baseline was run. Each of those can move results more than the difference between a pass and a fail, and none of them is visible from the results tables alone.

What reflectance values should a daylight model use?

Conventional values are around 0.20 for external obstruction faces and the ground plane, 0.70 for ceilings, 0.50 for internal walls and 0.20 for floors. They are assumptions drawn from guidance and practice, so report them as such. Any value outside the usual range needs a named finish, a published or measured reflectance, and a condition securing it.

Why does frame factor matter in a daylight assessment?

Because it sets the proportion of the aperture that is actually glass, and slim and bulky window systems differ enough to change results. Take it from the window schedule rather than a schematic elevation, and report it alongside the glazing light transmittance and any maintenance factor, with the source for each.

Should an assessment use the existing or the consented baseline?

State both where a consented but unbuilt scheme sits between the site and the receptor. Existing condition is the normal starting point for neighbouring amenity, but running only the baseline that gives the better answer, without saying so, is the criticism most often made in independent review.

How should unknown internal layouts in neighbouring properties be handled?

Derive them from external fenestration, property type and available evidence such as sales particulars and historic applications, then state the assumption for every window: which rooms are main habitable spaces, how combined living and kitchen spaces are treated, and which window serves which room. Where an assumption is uncertain, run a sensitivity test.

Can climate-based modelling replace vertical sky component?

They answer different questions and use different skies. Vertical sky component and average daylight factor rest on the standard overcast sky, a defined luminance distribution rather than a weather condition. Climate-based modelling needs a weather file, and the file, the location it stands for and the reference year all become declared inputs.

Sources and further reading

daylightbre 209modellingpeer reviewspecialist reviewers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Daylight, Sunlight and Amenity

View all →
Daylight, Sunlight and Amenity7 min read

Temporary loss of light from scaffolding and hoardings

Temporary obstruction of light by scaffolding or a hoarding is not a planning matter. The controls sit in highway licences, construction management plans and private nuisance.

Read article →
Daylight, Sunlight and Amenity7 min read

When a daylight assessment is required on the validation list

No national rule requires a daylight assessment. The requirement comes from the authority's own local validation list, and the trigger is usually set by storeys, separation distance or whether new flats are proposed.

Read article →
Daylight, Sunlight and Amenity7 min read

Cumulative overshadowing from consented but unbuilt schemes

Where a neighbouring plot holds an unbuilt permission, the realistic future condition includes it. Model that, model the proposal alone, and say which scenario the conclusion rests on.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight in a conservation area: rooflights and sash geometry

Establish what the heritage duty permits in aperture, profile and position first, then model what it delivers. A daylight result based on glazing a conservation officer will not accept is worth nothing.

Read article →
Daylight, Sunlight and Amenity7 min read

Dual aspect and single aspect units in amenity policy

A scheme can pass every daylight test and still fail on aspect. Policy restricts north facing single aspect units outright, and the overheating rules bite on the same configuration.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight to solar panels and whether planning protects it

There is no right to light for a roof-mounted array. Loss of generation is material but weakly weighted, so the objection needs a shading study and conventional amenity grounds alongside it.

Read article →