Declaring conflicts of interest in planning reports

6 min readBy PlanScope Editorial Team

A conflict is judged by what a reasonable reader would think, not by whether you would be swayed. Six sentences at the front of the report remove an entire category of cross-examination.

A conflict of interest in a planning report is not a question of whether you would actually be swayed. It is a question of whether a reasonable reader, knowing what you know, would think your independence was at risk. That test is why the professional codes require disclosure rather than self-assessment, and why the honest answer to most borderline cases is to write the connection down and let the client and the council decide.

The awkward part is that planning consultancy mixes roles that other professions keep apart.

Where the codes address independence

Every institute a planning report author might belong to deals with this, in similar terms and with different mechanics.

The planning institute's code requires members to act with competence, honesty and integrity, to avoid acting where a conflict arises, and to disclose any interest that might affect their advice. The surveying institute's conduct rules and its separate professional statement on conflicts require a member not to advise where there is a conflict unless informed consent has been obtained and the conflict can be managed. The ecology and archaeology institutes each carry codes with duties of objectivity and a requirement not to misrepresent findings.

Two common features are worth noting. The duty runs to the profession and the public as well as the client. And disclosure alone does not always cure the problem: some conflicts cannot be managed, and the only answer is to decline.

Author, adviser and advocate

Planning work involves three distinct roles, and much of the confusion comes from doing all three on the same instruction.

The author of a technical report produces evidence. Their duty is to describe what they found, including the parts that do not help. The adviser interprets that evidence for the client and recommends a course of action, which legitimately involves judgement about risk and tactics. The advocate presents the client's case and argues it, which is a partisan function and properly so.

A noise report written by someone who has already advised the client that the scheme is viable is not automatically compromised. But the author should be able to say what they would have written if the advice had gone the other way. Where they cannot, the roles have collapsed.

The practical discipline is separation within the document. Keep the survey, the assessment and the conclusion in sections that could be read by someone who disagrees with you, and keep the recommendation on what to do next in a covering letter rather than in the report.

Conflicts that arise in small teams

Most conflicts in this field are mundane rather than dramatic.

The recurring ones are a practice that advises a council on its validation list and also acts for applicants in that district, an individual who worked at the local planning authority within the last few years and is now assessing a site they once handled, a reviewer asked to check work produced by a colleague, a personal interest in land near the site, and a fee arrangement that pays more if permission is granted.

That last one deserves particular attention. Contingent or success-based fees are incompatible with giving expert evidence, and the expert witness practice statements say so directly. They are also poor practice for any report intended to inform a decision, because the incentive is visible on the face of the arrangement.

Where a practice acts for parties on opposite sides of the same question, the position is covered in more detail in our note on conflicts of interest when consultants advise both sides.

What to declare, and where it goes

Put the declaration in the front matter of the report, alongside the competence statement, not in an appendix.

A workable declaration covers six things. Who instructed you and when. The scope of the instruction, including what you were asked not to do. Any previous involvement with the site, the applicant or an objector. Any financial or personal interest in the outcome. The basis of the fee, with a statement that it is not contingent on the outcome. And a short statement that the opinions expressed are your own and reflect your professional judgement.

Six sentences. It takes ten minutes to write and it removes an entire category of cross-examination.

For a peer review or sign-off, add one more element: what you relied on without independently verifying. A reviewer who signs a draft based on survey data supplied by someone else should say so, and our note on signing off an AI-assisted draft sets out what that responsibility involves.

Duties when giving evidence at an inquiry

Evidence at an inquiry or hearing is different in kind from a report submitted with an application.

An expert giving evidence owes an overriding duty to the tribunal that takes precedence over any duty to the client who is paying. That means evidence has to be independent, uninfluenced by the pressures of the proceedings, and has to state the facts on which the opinion is based, including facts that detract from it. Where a question falls outside the expert's expertise, they must say so. Where their view changes after the proof of evidence is submitted, they must communicate that change.

The practical consequences appear in the proof of evidence itself. A declaration of truth and of understanding of the duty is expected. Material assumptions have to be stated. And the range of opinion on a contested point should be acknowledged rather than suppressed, with reasons for preferring one view.

Inspectors notice when a proof reads as advocacy. The weight given to it drops, and the cross-examination is harder.

Client pressure and how to record it

It usually arrives as a suggestion rather than an instruction. Could the sentence about the roost be shortened. Is the sensitivity really high. Does the appendix need to include the failed monitoring period.

Handle it in three steps. Ask for the request in writing, or confirm it in writing yourself with a short note of what was asked. Explain what you can and cannot change, distinguishing presentation, which is negotiable, from findings, which are not. And keep the original version, dated.

Where a change is legitimate, make it and say why. Where it is not, decline in writing and offer the alternative: a covering letter from the client setting out their own view alongside your report. That arrangement satisfies most clients and preserves the integrity of the document.

Contemporaneous notes are the only protection that works. Memory is not evidence, and a dispute about what was asked for is always reconstructed years later.

Withdrawing from an instruction

Sometimes the answer is to stop. The situations that call for it are a conflict that cannot be managed by disclosure, a client who requires findings to be altered, an instruction that has drifted outside your competence, or the discovery of a prior involvement that was not apparent at the outset.

Do it properly. Notify the client in writing with a factual statement of the reason. Preserve confidentiality over everything learned during the instruction, which survives the end of it. Where a report or proof has already been submitted, tell the council or the inspectorate that you are no longer the author, without explaining why. And return or secure the client's material.

Withdrawal is rare and uncomfortable, and it is also the strongest professional signal available. Reviewers listed in a professional directory are asked to apply exactly this judgement when they are offered work, and the report types that carry a legal competence requirement across the full set of report types are the ones where it matters most.

This is general guidance, not legal advice. Check your own institute's current code and any client-specific requirements before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

What should a conflict of interest declaration contain?

Who instructed you and when, the scope of the instruction including anything you were asked not to do, any previous involvement with the site, applicant or objectors, any financial or personal interest in the outcome, the basis of the fee with confirmation that it is not contingent, and a statement that the opinions are your own professional judgement.

Are success fees acceptable for planning reports?

Not for expert evidence, where the practice statements rule them out directly. They are also poor practice for any report intended to inform a decision, because the incentive is visible on the face of the arrangement. If a fee is structured that way, say so in the declaration, and expect the weight given to the report to fall accordingly.

What is the expert's duty at a planning inquiry?

An overriding duty to the tribunal that takes precedence over the duty to the paying client. Evidence must be independent, must state the facts on which the opinion rests including those that detract from it, must acknowledge where a question falls outside the author's expertise, and must be corrected if the expert's view changes after the proof is submitted.

How should I respond to a client asking me to soften a finding?

Ask for the request in writing or confirm it yourself in a dated note. Distinguish presentation, which is negotiable, from findings, which are not. Where the change is not acceptable, decline in writing and offer a covering letter in which the client sets out their own view alongside your report. Keep the original version.

When should a consultant withdraw from an instruction?

Where a conflict cannot be managed by disclosure, where a client requires findings to be altered, where the instruction has drifted outside your competence, or where a prior involvement emerges that was not apparent at the outset. Notify the client in writing, preserve confidentiality, and tell the council that you are no longer the author without explaining why.

Sources and further reading

conflicts of interestprofessional conductexpert evidencepeer reviewplanning inquiryconsultants

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Who may write a BS 5837 tree survey

BS 5837:2012 asks for an arboriculturist defined by education, training and experience rather than by licence. Councils look for a relevant qualification, an assessed professional grade and planning experience.

Read article →
Professionals and Qualifications7 min read

Who may sign a SuDS maintenance and management plan

There is no competent person regime for sustainable drainage maintenance plans. The question an authority is really asking is who holds the duty in twenty years, how it is funded and how plant reaches each component.

Read article →
Professionals and Qualifications8 min read

Townscape assessor competence and peer review

Townscape judgements are opinions, so competence shows in whether the reasoning is traceable. This covers the disciplines that do this work, baseline discipline, design review weight and what a peer review should test.

Read article →
Professionals and Qualifications7 min read

Who prepares an open space assessment

Open space work is survey and data handling measured against the authority's own standards. This covers who should lead by typology, how catchments should be drawn, and the delivery questions the assessment must answer.

Read article →
Professionals and Qualifications7 min read

Who prepares a foul sewage assessment

A foul sewage assessment is judged on three pieces of evidence rather than on the author's title. This sets out who obtains each one, and when a drainage engineer becomes necessary.

Read article →
Professionals and Qualifications6 min read

Who prepares a circular economy statement

A circular economy statement stands or falls on quantified material data. This looks at which member of the design team should lead it, where the tonnages come from, and who carries the post-completion reporting duty.

Read article →