Development plan: what documents make it up

6 min readBy PlanScope Editorial Team

Councils decide applications in accordance with the development plan unless material considerations indicate otherwise. Knowing which documents are actually in it is the first move in any planning argument.

The development plan definition sits in section 38 of the Planning and Compulsory Purchase Act 2004, and it matters more than any other single provision in English planning. Section 38(6) requires that an application be determined in accordance with the development plan unless material considerations indicate otherwise. Before anyone can argue about whether a scheme complies, both sides have to agree on which documents are in the plan.

For most sites that turns out to be four or five documents with different adoption dates, written by different bodies, at different levels of detail.

What section 38 actually says

Section 38 defines the development plan for an area in England as the adopted or approved development plan documents that cover it, taken as a whole, together with any neighbourhood development plan that has been made for the area. In Greater London it also takes in the spatial development strategy prepared by the Mayor.

Two subsections earn their keep in practice. Section 38(5) resolves conflict between plan documents in favour of the one adopted or approved more recently. Section 38(6) sets the plan-led starting point for every decision.

That phrase "taken as a whole" does real work. A scheme rarely satisfies every policy, and the statutory question is whether it accords with the plan read as a package, which is why officer reports usually end with a paragraph weighing conflict with one policy against compliance with several others.

The documents that make up a local plan

In a unitary or district area the core document is the adopted local plan, which allocates sites, draws settlement boundaries and sets the development management policies an officer will cite in a decision notice. Some councils still run a two-part structure with a strategic plan and a separate site allocations document, and both are development plan documents.

Where the area is two-tier, the county council prepares the minerals and waste local plan. It applies to your site even though it comes from a different authority, and it can bite on ordinary schemes through minerals safeguarding areas, which sometimes require a short assessment before a house can be built over a sand and gravel resource.

Then there are saved policies. When the 2004 Act changed the plan system, policies from older local plans, unitary development plans and structure plans were saved by direction so that areas were not left without a plan. Some are still in force. They look old-fashioned and they are still part of the development plan until replaced.

Document Prepared by In the development plan
Local plan (adopted) District, borough or unitary council Yes
Minerals and waste local plan County or unitary council Yes
Made neighbourhood plan Parish, town council or forum Yes
Spatial development strategy (London Plan) Greater London Authority Yes, in Greater London
Supplementary planning document The council No, material consideration only
National Planning Policy Framework Government No, material consideration only

Neighbourhood plans and when they count

A neighbourhood plan becomes part of the development plan when it is made, which happens after an independent examination against the basic conditions and a local referendum. Before that point a plan in preparation is a material consideration whose weight grows as it passes each stage.

Made plans are short and specific. They set local design rules, protect green spaces, allocate small housing sites and sometimes impose stricter parking or frontage requirements than the borough-wide plan. Because they are development plan documents, a conflict with a made neighbourhood plan is a conflict with the plan, and the section 38(5) rule about the later document prevailing can cut either way depending on adoption dates.

Where supplementary planning documents sit

Householder design guides, parking standards, developer contributions guidance and shopfront guides are usually supplementary planning documents. They are consulted on and adopted by the council, they are material considerations, and they are not part of the development plan.

The practical consequence is about weight, not relevance. An SPD that explains how an adopted policy on residential amenity should be applied is persuasive. An SPD that quietly introduces a new requirement with no parent policy is vulnerable, because supplementary documents cannot add policy. If your scheme fails only against an SPD, say so plainly in your Planning Statement and set out the adopted policy it is said to supplement.

Some council documents sit outside the plan altogether and still shape the outcome. Air quality action plans are an example, and a site inside an Air Quality Management Area will attract requirements drawn from documents that were never examined by an inspector.

London and the spatial development strategy

In the 32 boroughs and the City of London, the London Plan sits alongside the borough local plan as part of the development plan. Both apply. Where they conflict the later document prevails, subject to the general duty of the borough plan to be in general conformity with the strategy.

That layering is why a London application often cites two policy numbers for the same issue, one from the strategy and one from the borough. It also explains why boroughs publish so much supplementary guidance: the detail has to go somewhere.

Finding the current policies for your site

  1. Open the council's planning policy pages and note the adopted local plan name and its adoption date.
  2. Check whether any older policies are formally saved and listed as still in force.
  3. Search the neighbourhood planning pages for a made plan covering the parish, ward or forum area.
  4. In a two-tier area, find the county minerals and waste plan and check the safeguarding maps.
  5. In Greater London, add the current London Plan.
  6. Collect the SPDs the council will apply, and mark them as material considerations rather than plan policy.

Write the list at the front of your policy analysis with adoption dates against each item. Officers notice when an applicant has done this, and it prevents the awkward moment where a submission quotes a policy that was superseded two years ago. Councils also publish their charging arrangements for the levy your council charges alongside plan documents, which is worth collecting at the same time.

Why adoption dates change the argument

A plan does not expire. Its policies stay in force until they are replaced, and the council still has to determine applications in accordance with them. What shifts with age is weight, because national policy directs decision-makers to consider how consistent a plan policy is with the current Framework, and older policies drift.

The Levelling-up and Regeneration Act 2023 changed the architecture again, introducing National Development Management Policies intended to sit alongside local plans and remove duplication from them. Commencement has been staged and the detail is set by regulations, so check the current position on gov.uk before relying on it in a submission rather than assuming the reform is in force.

One honest uncertainty. Nobody drafting a statement today can be sure how much weight an inspector will give a five-year-old policy against a newer Framework, and the answer varies by topic. State the age, state the consistency, and make the argument rather than hiding it.

Start by listing the plan documents for your site, then work out which supporting reports the council will expect alongside them. You can enter your postcode on PlanScope to see which reports your site is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the development plan in simple terms?

It is the set of statutory policy documents a council must decide applications against. For most English sites that means the adopted local plan, any minerals and waste plan covering the area, any neighbourhood plan that has been made after a referendum, and any older policies formally saved. In Greater London the London Plan is added to that list.

Is the NPPF part of the development plan?

No. The National Planning Policy Framework is national policy and a material consideration, so it can outweigh the plan in the balance, but it is not itself part of the development plan. Its weight is greatest where a local policy is out of date or inconsistent with it. Always state which edition of the Framework you are relying on.

Do supplementary planning documents carry the same weight as the local plan?

They do not. An SPD explains and adds detail to an adopted policy, and it is a material consideration when the council decides. It cannot create a new policy requirement or allocate land. If an officer report treats an SPD requirement as though it were plan policy, that is a point worth raising in your representations.

How do I find out which local plan applies to my site?

Start on your council's planning policy pages, where the adopted plan, its adoption date and any saved policies are published, then check the neighbourhood planning pages for a made plan covering your parish or ward. Two-tier areas also have a county minerals and waste plan. Note the adoption date of each document you rely on.

What happens when the local plan is old?

Age alone does not remove a policy from the development plan. It stays in force until it is replaced. What changes is the weight it carries, because the Framework directs decision-makers to weigh policies according to their consistency with national policy, and separate provisions apply where a council cannot demonstrate the housing land supply it needs.

Sources and further reading

development planlocal planneighbourhood planplanning policysection 38spd

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary6 min read

Prior approval: the application that is not quite one

The permission already exists. A prior approval application only determines the matters the class lists, which is both the attraction of the route and its main trap.

Read article →
Glossary6 min read

Planning obligation: when a contribution may be required

Regulation 122 sets three statutory tests for any planning obligation. The most useful question in a contributions negotiation is which limb a given ask satisfies.

Read article →
Glossary7 min read

Section 73 application: varying a condition in practice

Section 73 lets you vary conditions on a permission you already hold, but it cannot touch the description of development and it will not buy you more time.

Read article →
Glossary7 min read

Certificate of lawfulness for a proposed use or operation

Section 192 asks whether a proposed use or operation would be lawful, not whether it would be acceptable. The authority has no discretion to refuse on the merits, and the onus of proof is on the applicant.

Read article →
Glossary7 min read

Stop notice and the compensation risk it carries

Section 183 allows a stop notice only where an enforcement notice has been issued. Section 186 then pays compensation if that notice is quashed on any ground other than the planning merits.

Read article →
Glossary7 min read

Enforcement notice: what it must specify to be effective

Section 173 of the Town and Country Planning Act 1990 fixes what an enforcement notice must say. Where the drafting fails, the notice may be a nullity rather than merely invalid, and that changes what you do next.

Read article →