Use Classes and Change of Use

Dog day care and boarding: which consents you need

7 min readBy PlanScope Editorial Team

Day care and boarding sit outside the Use Classes Order, so the change of use always needs permission. Barking decides the case, and welfare licensing is a separate consent.

Dog day care and animal boarding sit outside the Use Classes Order, which means they are sui generis and planning permission is needed whatever the building was used for before. A vacant industrial unit, a redundant barn, a shop, an office: all of them require a change of use application. And the application will be decided on barking, because that is the issue that determines nearly every one of these cases.

There is a second consent too. Animal welfare licensing is a separate regime with its own application, and holding a licence does not make the use lawful in planning terms.

How dog day care is classified

Day care for dogs, where animals are dropped off in the morning and collected in the afternoon with no overnight stay, is not covered by any class in the Use Classes Order 1987 as amended. Nor is boarding. Both are sui generis uses.

Two consequences follow. There is no permitted change into the use from anything else, so the change always needs permission. And there is no permitted change out of it either, so a building with a day care permission cannot simply revert to a Class E or storage use without a further application, unless the earlier lawful use can be resumed.

A few related activities fall differently. Dog grooming without boarding is usually treated as a Class E(a) retail-type service, because customers visit and leave. Veterinary services sit within Class E(e). A dog walking business run from a house, where dogs are collected and walked and not kept on the premises, may remain incidental to the residential use, and the test is the same one applied to any home-based business: visitors, vehicles, noise, and whether part of the property stops being used as a dwelling. A workshop in a garden raises the same analysis from a different starting point.

Where the unit sits in an industrial estate, do not assume an easy ride. Sui generis uses on employment land often conflict with a policy protecting that land for Class B uses, and that policy objection is separate from the noise one.

Boarding and kennels as a separate question

Overnight boarding changes the application in three ways.

The noise exposure period extends into the night, when background sound levels are at their lowest and the assessment criteria are at their most demanding. The welfare requirements change, with implications for building design, exercise provision and staffing. And the trip pattern changes, with arrivals and departures spread across a day rather than concentrated at two peaks.

A permission for day care only will usually carry a condition expressly preventing overnight boarding. Operators who later want to add boarding need a further application, and the acoustic evidence for the night period is a different exercise rather than an extension of the day one.

If boarding is the eventual plan, apply for it at the outset with the night-time assessment included. Adding it later means a second application, a second round of objections and sometimes a refusal on an operation that has already been built.

What the noise assessment has to show

Barking is the whole case. An assessment that treats it as general commercial noise will not satisfy an environmental health officer.

The usual approach is a rating level assessment following BS 4142:2014+A1:2019, with the specific sound level determined for the proposed operation and corrections applied for the acoustic character of barking, which is impulsive and tonal rather than steady. The background sound level is measured at or representative of the nearest noise-sensitive facade, over a period covering the hours of proposed operation.

Element What the assessment should contain
Baseline Measured background levels at or representative of the nearest sensitive facade, over the proposed hours
Source data Barking source levels from measurement at a comparable operation or from published source data, stated
Operating assumption Maximum number of dogs outside at once, session length and frequency
Mitigation Building fabric, acoustic fencing with specified mass, outdoor session limits
Result Rating level with character correction, compared against background, at each receptor

The operating assumption is where applications are won. An assessment based on all forty dogs in the outdoor area simultaneously will fail at most sites. An assessment based on supervised sessions of eight dogs at a time, for defined periods, with the rest of the animals inside a treated building, often works. The condition then has to match the assumption, which operators sometimes regret later.

Mitigation that councils accept includes a sealed building with mechanical ventilation rather than opening windows, acoustic absorption to internal surfaces, a close-boarded acoustic fence of specified mass and height around the exercise area, and a limit on the hours the outdoor area can be used. A Noise Impact Assessment should present the mitigated result rather than the unmitigated one as the headline, with both shown.

Odour, waste and drainage

Odour is a smaller issue than noise and it still needs answering, particularly where the nearest window is close.

Deal with four things. Waste storage, with a covered bin store away from the boundary and a stated collection frequency. The waste route, because dog faeces from a commercial operation is a controlled waste that must be transferred to a registered carrier, not put in a domestic bin. Cleaning regime and the chemicals used, which affects both odour and drainage. And foul drainage, because a kennel wash-down connects to the foul sewer and the water company may require a trade effluent consent depending on volume and content.

Where the building needs mechanical ventilation for noise reasons, the discharge point then becomes an odour question, and the ventilation statement should locate the discharge away from residential windows and state the extract rate.

Numbers, hours and drop-off arrangements

The number of dogs is the single figure that controls the permission. Offer it yourself, with the operating model behind it, rather than leaving the authority to pick a number.

Drop-off and collection concentrate into two short windows, typically before 9am and after 5pm, and that is the transport issue. What the highway authority wants to see is that vehicles can enter, park, unload and leave without reversing onto the carriageway or stopping on it. For a unit with four parking spaces and forty dogs arriving within an hour, the arithmetic has to work on paper.

A short Transport Statement should state the number of staff, the number of animals, the expected arrival profile, the on-site parking and manoeuvring, and the staff travel arrangements. Where the site is rural with a single track access, say how two vehicles pass.

Hours conditions usually cover three things separately: opening hours for drop-off and collection, hours during which the outdoor area may be used, and hours for deliveries. Where an existing permission already restricts hours and the operation needs different ones, varying an opening hours condition runs through a section 73 application.

Animal welfare licensing is a separate regime

Providing boarding for cats or dogs, which includes boarding in kennels, home boarding and day care for dogs, is a licensable activity under the Animal Welfare (Licensing of Activities Involving Animals) (England) Regulations 2018. The licence comes from the local authority, carries conditions about accommodation, staffing, welfare and record keeping, and is inspected with a rating.

Keep the two processes apart in your head and run them together in practice. A welfare licence does not authorise the use in planning terms, and a planning permission does not satisfy the welfare standards. The building specification often has to meet both: the welfare requirements set minimum kennel sizes and exercise provision, and the planning mitigation may require a sealed building, and reconciling those two is a design exercise worth doing before the application rather than after.

Conditions to expect

A permission for dog day care typically carries:

  1. A maximum number of dogs on the premises at any one time.
  2. A maximum number of dogs in the outdoor area at any one time, with session arrangements.
  3. Hours of operation, hours of outdoor use and hours of delivery, each stated separately.
  4. A restriction preventing overnight boarding where only day care is permitted.
  5. Approval and retention of the acoustic mitigation, including the fence specification, before first use.
  6. A management plan covering supervision, cleaning, waste and complaints handling.
  7. Parking and manoeuvring to be laid out and retained.

Read condition one and condition two together before accepting them. An operator whose business plan needs sixty dogs will not survive on a condition for thirty, and renegotiating a numbers condition after permission means another application and another consultation. The Planning Statement is where the numbers, the hours and the mitigation should be set out as a package so that the officer conditions what you proposed.

Enter your postcode on PlanScope to see which reports a sui generis animal use is likely to need on your site.

This is general guidance and not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does dog day care need planning permission?

Yes. Day care and boarding are not covered by any class in the Use Classes Order, so they are sui generis and permission is needed whatever the previous use was. There is no permitted change into the use or out of it, so a building with a day care permission cannot simply revert to another use without a further application.

Which standard applies to barking noise?

A rating level assessment following BS 4142:2014+A1:2019, with corrections applied for the acoustic character of barking, which is impulsive and tonal rather than steady. The background sound level is measured at or representative of the nearest sensitive facade over the proposed hours of operation, and the result is compared against it.

Do I need a separate animal welfare licence?

Yes. Providing boarding for cats or dogs, including kennels, home boarding and day care for dogs, is a licensable activity under the Animal Welfare (Licensing of Activities Involving Animals) (England) Regulations 2018. The licence comes from the local authority with its own conditions and inspection rating, and it does not make the use lawful in planning terms.

Can I add overnight boarding later?

Only with a further application. A day care permission usually carries a condition expressly preventing overnight boarding, and the night-time acoustic assessment is a different exercise because background levels are at their lowest. If boarding is the eventual plan, apply for it at the outset with the night assessment included.

How is dog waste from a commercial operation handled?

As a controlled waste transferred to a registered carrier, not in a domestic bin. The application should state the covered store location away from the boundary, the collection frequency, the cleaning regime and the chemicals used. Wash-down to foul drainage may require a trade effluent consent from the water company depending on volume and content.

How many dogs will the council permit?

Whatever number the acoustic assessment and the site can support, and the condition will reflect the operating assumption in your assessment. Offer the figure yourself with the operating model behind it. An assessment based on supervised outdoor sessions of a small group at a time, with the rest inside a treated building, usually works better than all animals outside at once.

Sources and further reading

dog day carekennelssui generischange of usenoiselicensing

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Co-living schemes and what use class they fall into

Large-scale purpose-built shared living fits no class in the Use Classes Order, so it is sui generis. That shapes room sizes, affordable housing contributions and the conditions on any consent.

Read article →
Use Classes and Change of Use7 min read

Trampoline parks and indoor leisure capacity

Indoor trampoline parks usually sit in Class E(d), so the planning risk moves to restrictive conditions, structure-borne impact noise and the occupancy figure the fire strategy allows.

Read article →
Use Classes and Change of Use7 min read

Crematoria and burial grounds: use class and consents

Neither a crematorium nor a burial ground falls within any use class, so both need planning permission. A crematorium also carries statutory separation distances and an emissions permit, and a burial ground needs a groundwater risk assessment.

Read article →
Use Classes and Change of Use6 min read

Sports and social clubs: Class F2 or sui generis?

A sports and social club can sit in Class F2 as a local community facility, or outside the use classes entirely if the bar becomes the main event. The distinction decides what you can change without permission.

Read article →
Use Classes and Change of Use6 min read

Film and television studios and the use class question

Film and television production is not named in the Use Classes Order, so a studio consent turns on how the primary use is described and how the planning unit is drawn. Sound stages, set workshops and production offices can each fall differently.

Read article →
Use Classes and Change of Use7 min read

Data centres: which use class applies

Classifying a data centre is a matter of fact and degree, and the answer rarely decides the scheme. Grid capacity and plant noise do.

Read article →