Use Classes and Change of Use

Dog day care and grooming: which use class applies

7 min readBy PlanScope Editorial Team

The Use Classes Order says nothing about animals. Working out which activity you actually run, grooming or day care or boarding, decides whether you need permission and what evidence goes with it.

Dog day care planning use class questions have an unsatisfying answer: day care is almost always sui generis, grooming is arguably within Class E, and boarding has never sat in any use class at all. The Use Classes Order was not written with animal care businesses in mind, and the 2020 amendment did nothing to help. So the practical route is to work out which of the three activities you are actually running, then apply for the one the council will recognise.

Getting that wrong is expensive, because a permission described as a grooming salon will not authorise twenty dogs on the premises for eight hours a day, and enforcement follows the complaints about barking.

Why animal care uses sit awkwardly in the class system

The Town and Country Planning (Use Classes) Order 1987, as amended in 2020, lists uses by activity. Nothing in Class E, Class F1 or Class F2 mentions animals. Kennels and catteries have always been outside the classes, which makes them sui generis, and a use that is sui generis needs planning permission for any change into or out of it.

That leaves grooming as the only animal activity with a plausible home in the class system, because it is a service provided to visiting members of the public and it can be argued to fall within Class E(c)(iii), other appropriate services in a commercial, business or service locality. Before 2020 the same argument ran through Class A1.

A veterinary practice is usually treated as falling within Class E, and it is worth confirming that with the local planning authority rather than assuming it, because the treatment has never been uniform.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and remember that a lawful development certificate under section 191 or 192 of the Town and Country Planning Act 1990 is the only formal way to confirm that a use is lawful.

Grooming, day care and boarding are three different answers

Describe the operation by what happens on the premises rather than by what the business is called.

Activity Typical planning treatment What drives the decision
Grooming salon Arguably Class E(c) Short appointments, low numbers, parking turnover
Dog day care Normally sui generis Numbers on site all day, barking, outdoor space
Boarding, including overnight Sui generis Night-time noise, staffing, welfare licensing

The line between grooming and day care is time and number. A salon taking four appointments an hour, with each dog on the premises for ninety minutes, behaves like any other service unit. A facility holding twenty-five dogs from 7.30am to 6.30pm, with an outdoor yard, does not, and describing it as a grooming business with waiting facilities will not survive the first neighbour complaint.

Where the operation mixes activities, and most do, apply for the mixed use and say what proportion of the floorspace and the hours each element occupies. A grooming salon with a day care room at the back is a mixed use, and it needs to be described as one.

Noise from barking and how it is assessed

Barking is the reason these applications get refused. It is intermittent, impulsive and highly noticeable against a quiet residential background, and a single dog setting off a group produces a sustained event rather than an isolated one.

Because the business is commercial, BS 4142:2014+A1:2019 is normally the framework, with acoustic feature corrections applied for the impulsive and intermittent character of the source. A noise impact assessment for this kind of use should give:

  • Measured background sound levels at the nearest sensitive façades, across the operating day and, where boarding is proposed, at night.
  • Predicted rating levels with the corrections stated and justified, for the indoor space and separately for any outdoor area.
  • Maximum levels for individual barking events at the nearest habitable room windows.
  • A stated maximum number of dogs on which the prediction is based.

That last point is the one applicants forget. A prediction based on fifteen dogs cannot support a permission for thirty, and the officer will tie the condition to whatever number the assessment used.

Mitigation that works is mostly operational and architectural. Keep the dogs indoors in an acoustically treated space with mechanical ventilation, use the outdoor yard in short supervised sessions away from the sensitive boundary, position the building so the yard is screened by the structure rather than by a fence, and commit to a barking management protocol with staff ratios in it. Offer the numbers and the hours as conditions.

Odour, waste and wash-down water

Twenty-five dogs produce waste, and the smell of a poorly managed facility carries further than the noise. Councils will want a waste and cleaning regime described in the application rather than left to the licensing stage.

Four elements to cover. Sealed bins in a ventilated store, with the store shown on the plan and away from the boundary. A commercial collection contract with a stated frequency. A cleaning schedule for the indoor space and the yard. And the drainage route for wash-down water, which is trade effluent and normally needs consent from the water undertaker rather than simply going to the foul sewer.

Where numbers are high, or where the premises sit close to housing or a food business, an odour assessment may be requested. For most small facilities a management plan with a clear cleaning and waste regime, offered as a condition, does the job.

Mechanical ventilation needs the same attention as the noise. An extract fan discharging over a neighbouring garden solves the internal air quality and creates a new complaint, so the termination point belongs on the elevation drawing.

Hours, drop-off and the on-street problem

Day care traffic mirrors the school run. Arrivals concentrate between about 7.30am and 9am and collections between 4.30pm and 6.30pm, every weekday, with each visit lasting two or three minutes.

That short dwell time is both the problem and the answer. Two or three vehicles waiting at once is enough to block a narrow street or a shared access, and a dog being walked from the car to the door on a lead adds a pedestrian movement into the carriageway. Show a layby or a defined drop-off area on the plan, with enough space for the number of arrivals in the busiest fifteen minutes, and set out the staggered arrival slots the booking system will use.

Where no off-street provision is possible, survey the street at the actual arrival times and present the result honestly. Highway officers respond better to a survey showing capacity for two waiting vehicles than to an assertion that parking is not a problem.

Animal activity licensing runs separately

Providing day care for dogs is a licensable activity under the Animal Welfare (Licensing of Activities Involving Animals) (England) Regulations 2018, as is boarding in kennels and home boarding. The licence comes from the same local authority, often from a different team, and it is assessed against animal welfare standards rather than planning policy.

Two things follow. A licence does not authorise the use in planning terms, and planning permission does not guarantee a licence. And the licensing standards on space per dog, staff ratios, separation of groups and rest areas will shape the layout, so read them before the drawings are finalised rather than after permission is granted.

Where the site is in the countryside or on a farm, the change from agricultural use brings its own policy tests, covered under agricultural to equestrian and other rural changes of use, and conversion of an agricultural building may need a full application rather than prior approval.

Writing the description of development

The description defines the permission, and on a sui generis use it has to carry the operational limits that make the scheme acceptable.

A workable form runs along these lines: "Change of use of Unit 6 to a dog day care facility (sui generis) for a maximum of 20 dogs, with associated grooming, external alterations, plant and an enclosed exercise yard."

Naming the number in the description is unusual and it is worth doing, because it makes the scope of the permission unambiguous and it gives the officer a reason to impose a numbers condition rather than refuse. Then offer conditions on opening hours, the hours of use of the outdoor yard, the maximum number of animals, and compliance with a submitted noise and waste management plan.

The supporting planning statement should set out the use class reasoning explicitly, the adopted local plan policies on amenity and employment land, and the operational controls. The broader document set for a change of use is covered under the evidence pack for a change of use application.

PlanScope drafts the planning statement, the noise and waste scopes and the rest of the pack from your postcode and a short set of answers. Enter your postcode to see which reports your site is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Is dog day care a use class?

No. Day care for dogs is not listed in Class E, F1 or F2, so it is normally treated as sui generis. That means planning permission is needed for any change into or out of the use, and the permission has to be described accurately because the class system provides no fallback flexibility.

Does a dog grooming salon need planning permission?

Where the unit is already in Class E, a grooming salon can be argued to fall within Class E(c)(iii) as another appropriate service, so no application may be needed. That argument depends on short appointments and low numbers. Add a day room holding dogs all day and the use moves outside Class E.

How is barking assessed for a planning application?

Usually under BS 4142:2014+A1:2019, with acoustic feature corrections for the impulsive and intermittent character of the source. The report should give background levels at the nearest façades, rating levels indoors and outdoors separately, maximum levels for individual events, and the number of dogs the prediction assumes.

Do I need a licence as well as planning permission?

Yes. Providing day care for dogs is licensable under the Animal Welfare (Licensing of Activities Involving Animals) (England) Regulations 2018, along with boarding in kennels and home boarding. The licence is assessed on animal welfare standards, and neither consent guarantees the other. Read the licensing standards before finalising the layout.

Should the number of dogs be in the description of development?

It usually helps. Naming a maximum makes the scope of the permission unambiguous and gives the officer a reason to impose a numbers condition rather than refuse. It also has to match the figure the noise assessment used, because a prediction based on fifteen dogs cannot support a permission for thirty.

Sources and further reading

dog day careuse classessui generisnoisechange of uselicensing

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Veterinary practices: Class E or sui generis?

Consulting surgeries are usually treated as Class E. Boarding, catteries and dog day care sit outside the Use Classes Order entirely, so a practice doing both runs a mixed use with no fallback.

Read article →
Use Classes and Change of Use7 min read

Dentists, clinics and the limits of Class E(e)

Dentists and clinics sit in Class E(e), so movement from another Class E use is not development. Surgeries attached to a practitioner's home, overnight care and restrictive conditions are where that breaks down.

Read article →
Use Classes and Change of Use8 min read

Betting shops, payday lenders and amusement arcades

Betting offices, pay day loan shops and amusement arcades sit outside the use classes, so there is no permitted change into them and no fallback use to rely on.

Read article →
Use Classes and Change of Use6 min read

Padel and outdoor sport: consents and conditions

The use class is the easy part. How padel noise is assessed when there is no national method, what the lighting limits require, and when Sport England is consulted.

Read article →
Use Classes and Change of Use6 min read

Self-storage and the limits of Class B8

Self-storage sits within Class B8, but ancillary sales, trade counters and processing all test the edge of the class. Where the line falls and how it is conditioned.

Read article →
Use Classes and Change of Use7 min read

Dog day care and boarding: which consents you need

Day care and boarding sit outside the Use Classes Order, so the change of use always needs permission. Barking decides the case, and welfare licensing is a separate consent.

Read article →