Dormer design that survives a planning officer

7 min readBy PlanScope Editorial Team

Forty or fifty cubic metres is the permitted development allowance for a dormer. Building to the maximum is often what gets a scheme refused when it needs consent.

The dormer window planning rules that matter sit in Class B of Part 1 of the General Permitted Development Order 2015, and they are more generous than most householders expect: 40 cubic metres of additional roof volume on a terraced house, 50 on a detached or semi-detached one, with no application needed at all if the design stays inside the limits and conditions. The catch is that a dormer built to the maximum of those limits is frequently the one the neighbours notice and the officer refuses when it does need permission.

So there are two questions, and they are different. What is permitted, and what is good enough to approve when permitted development is not available.

Volume allowances for a loft conversion

The allowance is cumulative. It covers the additional roof space created by this dormer and by any previous enlargement of the roof, including work done by a previous owner and including any hip to gable enlargement. A house that has already had a small rear dormer has less than the full allowance left.

The volume is measured as the space enclosed by the enlargement, not the floor area gained. A wide, shallow dormer uses less volume than a deep box of the same width, which is one reason the maximum internal gain and the minimum visual impact rarely coincide.

Class B also does not allow anything that would exceed the highest part of the existing roof, so the dormer roof has to sit below the ridge. And the whole class is unavailable on article 2(3) land, which means conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites: there, every dormer needs planning permission whatever its size.

Where the calculation is close, get a Lawful Development Certificate. It is the only formal way to confirm that works are lawful, and it costs a fraction of putting a dormer right after an enforcement investigation.

Setting the dormer in from the eaves and ridge

Class B carries a condition requiring the edge of the enlargement to be set back at least 20 centimetres from the original eaves, measured along the roof slope, except for a hip to gable enlargement or where the enlargement joins the original roof at the rear.

Twenty centimetres is the legal minimum, and it is not a design target. Councils' householder design guides typically ask for considerably more: a clear band of original roof at the eaves, a set down from the ridge, and a set in from the party walls or the ends of the roof.

The proportions that read well on a typical two storey house are a dormer occupying somewhere around half to two thirds of the roof width, with the original roof visible above, below and to each side. Once the dormer approaches the full width and runs from ridge to eaves, the roof stops reading as a roof and starts reading as a storey.

That is a judgement, and reasonable people differ about the exact proportions. What is not a judgement is that a full width, full height box dormer is the single most refused householder design in the country.

Flat roof dormers and why they draw objections

Flat roofed dormers are the default because they maximise head height and cost less to build. They are also the form officers most often criticise, particularly on houses with a strong pitched roof character.

A flat roof works reasonably well when the dormer is modest, set well within the roof, and the flat area is not visible from ground level. It works badly when it is wide, high, and finished in a material that contrasts with the roof.

The alternatives worth drawing before defaulting to flat: a pitched roof dormer with a gablet, which suits Victorian and Edwardian houses, a hipped dormer, which softens the form on interwar semis, and two or three separate dormers rather than one continuous box, which almost always reads better and occasionally uses less volume.

On a rear roof slope with no public view, the argument for the flat roofed box is much stronger, and officers generally accept it. On a front or prominent side slope, expect resistance.

Cheeks, cladding and window proportion

The cheeks are the vertical side panels, and they are where a dormer either looks careless or looks considered.

Lead, or a lead substitute, is the traditional finish and is what conservation officers expect. Tile hanging to match the roof works on houses that already use it. Timber cladding and fibre cement panels are both used, with mixed success, and a dormer clad in a material used nowhere else on the house will be commented on.

Window proportion is the other detail. The dormer window should relate to the windows below in width, in proportion and ideally in alignment. A single wide horizontal window in the dormer above two vertical windows at first floor looks wrong for reasons most people cannot articulate but everyone can see.

Frame materials should match the rest of the house unless the house has already been changed. The similar appearance condition in Class B applies to permitted development work, and while a full application is not bound by it, officers apply much the same expectation through design policy. The practical implications of matching are covered in materials of similar appearance.

Front dormers and article 2(3) land

Class B does not permit any enlargement that extends beyond the plane of an existing roof slope which forms the principal elevation and fronts a highway. In plain terms, a dormer on the front roof slope facing the road is not permitted development.

It may still be acceptable as a full application, particularly in an area where front dormers are already a feature of the streetscape. It is rarely acceptable where the street has an unbroken run of original roofs, and never a formality in a conservation area.

Rooflights are the usual alternative on the front, and conservation style rooflights fitted flush with the roof plane are what officers ask for in sensitive areas. They are more expensive than standard units and they make the difference between an approval and a refusal often enough to be worth specifying from the start.

Where the house is listed, none of the above applies in the usual way: listed building consent is needed for works affecting the building's special interest, and a Heritage Statement explaining the effect on significance will be expected alongside the application.

Obscure glazing and the 1.7 metre rule

Class B requires that any window in a wall or roof slope forming a side elevation of the dwellinghouse must be obscure glazed, and non-opening unless the opening part is more than 1.7 metres above the floor of the room in which it is installed.

Three things about that rule catch people out. The height is measured from the internal floor level of the room, not from the ground. It applies to side-facing windows, which on a dormer means the cheeks. And it is a condition of the permitted development right, so a side window that does not comply takes the whole dormer outside Class B rather than just being a problem in itself.

The same standard appears as a condition on full applications, and the level of obscurity specified varies, which is the subject of obscure glazing conditions and the levels that apply. Where a dormer includes doors onto a guarding rather than a window, the overlooking question is assessed differently, as set out in Juliet balconies and the overlooking test.

Drawing the dormer to scale on the elevation

Most dormer refusals could have been predicted from the elevation drawing, if anyone had drawn it properly.

The drawings that answer an officer's questions:

  • existing and proposed rear, side and, where affected, front elevations at 1:50, with the dormer dimensioned from the ridge, the eaves and each party wall or roof end
  • a roof plan showing the dormer position relative to the whole roof
  • a section at 1:50 through the dormer showing head height, the eaves set back and the sight line to any affected neighbouring window
  • a cheek and window detail at 1:20 in a conservation area or on a listed building

Where the application needs written support, a short Planning Statement addressing the council's own householder design guide by name does more than general assertions about good design. A Design and Access Statement is only required for a householder application where the site is in a conservation area or a World Heritage Site, or the works affect a listed building.

And draw the neighbours. A rear elevation showing your dormer alongside the two houses either side answers the character question before it is asked.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. A Lawful Development Certificate is the only formal way to confirm that works are lawful. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Enter your postcode on PlanScope to see which reports a loft conversion is likely to need.

Frequently asked questions

How big can a dormer be under permitted development?

Class B of Part 1 of the GPDO 2015 allows 40 cubic metres of additional roof volume on a terraced house and 50 cubic metres on a detached or semi-detached one. The allowance is cumulative and includes earlier roof enlargements by any owner, including a hip to gable conversion, so check what has already been used.

Can I build a dormer on the front of my house?

Not under permitted development. Class B excludes any enlargement extending beyond the plane of a roof slope that forms the principal elevation and fronts a highway. A front dormer may still be acceptable as a full application where the street already has them, but it is rarely acceptable on an unbroken run of original roofs.

What is the 20 centimetre set back rule?

A condition of Class B requires the edge of the enlargement to be set back at least 20 centimetres from the original eaves, measured along the roof slope, except for a hip to gable enlargement or where the enlargement joins the original roof at the rear. It is a legal minimum, not a design target.

Why does a side window in the dormer have to be obscure glazed?

Class B requires any window in a side elevation to be obscure glazed and non-opening unless the opening part is more than 1.7 metres above the floor of that room. The height is measured from the internal floor, and a non-complying side window takes the whole dormer outside permitted development.

Do dormers need permission in a conservation area?

Yes. Class B does not apply on article 2(3) land, which includes conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites. Every dormer in those areas needs planning permission whatever its volume, and a Design and Access Statement is required with the application.

Is a flat roof dormer always a problem?

No. On a rear roof slope with no public view, a modest flat roofed dormer set well within the roof is usually accepted. The objections arise when it is full width, runs from ridge to eaves, or sits on a prominent slope, where a pitched or hipped form or two separate dormers will read better.

Sources and further reading

dormerloft conversionpermitted developmentclass bhouseholder

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Householder Extensions and Conversions

View all →
Householder Extensions and Conversions7 min read

Loft conversion stairs and the planning drawings

The staircase decides how much of a loft is usable and where the dormer has to go. The section through the stair is the drawing that settles whether a conversion works.

Read article →
Householder Extensions and Conversions7 min read

Flat roof against pitched roof on a rear extension

The 4 m overall and 3 m eaves limits in Class A decide most rear extension roof forms. Once you are applying for permission, the design guide takes over and often prefers a pitch.

Read article →
Householder Extensions and Conversions7 min read

Setting back a two storey side extension

A two storey side extension always needs planning permission, and setting the front wall back from the original frontage is usually the change that turns a refusal into an approval.

Read article →
Householder Extensions and Conversions7 min read

Lighting a deep single storey rear extension

Daylight falls away fast from a vertical window, so a deep rear extension needs light from above or from the side. The decisions have to come before the steelwork.

Read article →
Householder Extensions and Conversions7 min read

Counting back to the original dwellinghouse

Previous owners' extensions eat into your allowance, and conservatories count. Here is how the original dwellinghouse baseline is fixed and proved.

Read article →
Householder Extensions and Conversions7 min read

Householder applications where Article 4 applies

An Article 4 direction withdraws a permitted development right, it does not ban the work. Here is how to read the schedule and apply without a fee.

Read article →