Householder Extensions and Conversions

A dropped kerb alongside an extension application

7 min readBy PlanScope Editorial Team

The crossing is authorised by the highway authority under the Highways Act 1980, not by the planning officer. Here is how the two applications interact when you are also building an extension.

A dropped kerb is a highway matter before it is a planning one. The crossing itself is authorised by the highway authority under section 184 of the Highways Act 1980, so a dropped kerb application planning officers never see can still be refused by a highway engineer who does not like the sightlines. Planning permission enters the picture in only two situations: where the access is formed onto a classified road, and where the new driveway surfacing counts as development in its own right. Most householders adding off-street parking alongside a rear extension end up dealing with two teams in the same building, working to different tests and different timescales.

Two consents, two desks, two tests

The planning system controls the use and appearance of land. The highway authority controls what happens in the public highway, which usually starts at the back edge of the footway and includes the verge, the kerb line and the carriageway.

Your front garden is yours. The footway in front of it is not. Lowering the kerb and strengthening the footway construction so a car can cross it are works in the highway, and only the highway authority can authorise them.

Which body that is depends on where you live. In a two-tier area it is the county council. In a unitary authority, metropolitan borough or London borough it is the same council that handles your planning application, though a different department. On a trunk road it is National Highways, and on a few roads in London it is Transport for London. Getting this wrong wastes a fortnight before anyone has looked at your drawings.

Applying under section 184

Section 184 of the Highways Act 1980 gives the authority the power to require a proper crossing where a vehicle is driven over a footway or verge, and it is the route under which vehicle crossings are approved and built. Driving across an unstrengthened footway is not simply discouraged. The authority can serve notice, carry out the works itself and recover the cost from the frontager.

The application is usually a short form plus a location plan and a sketch showing the proposed width, the position relative to your boundary and the position of any street furniture. Expect to supply:

  1. A plan at a recognisable scale showing the house, the boundary and the proposed crossing position.
  2. Dimensions of the hardstanding behind the crossing, so the engineer can see a vehicle will park clear of the footway.
  3. Photographs of the frontage, including any trees, lamp columns, gullies and inspection covers.
  4. Evidence of ownership or the freeholder's consent where the frontage is not yours alone.

Some authorities insist on using their own term contractor. Others operate an approved contractor list and let you appoint from it. Either way the works are inspected and signed off by the authority, and the finished crossing stays part of the public highway, maintained at public expense once accepted.

Where planning permission is needed as well

Forming a new means of access to a highway is permitted development under Part 2 of Schedule 2 to the General Permitted Development Order 2015, but that permission is withdrawn where the highway is a trunk road or a classified road. An A, B or C road frontage therefore needs a planning application for the access, and the application will be judged on highway safety: visibility in both directions, the speed and volume of passing traffic, and whether a vehicle can enter and leave in forward gear.

Permission is also needed where a condition on an earlier permission removed the right, which is common on estates built in the past thirty years, and where an Article 4 direction has withdrawn householder permitted development in a conservation area.

If the access goes in at the same time as a rear extension, the two can sit in one application. That is usually the cleaner route, because the officer sees the whole scheme and the drawings only have to be produced once. The policy test for anything in the front garden is tighter than for work at the back, which is a point covered more fully in the article on why front extensions are harder than rear ones.

What the engineer looks at on the ground

Visibility is the first thing. The engineer wants to see that a driver reversing out, or pulling out forwards, can see approaching traffic and be seen in turn. Boundary walls, hedges and parked cars on either side all reduce that, and a condition cutting a wall down to around a metre near the access is a routine outcome.

Then come the obstructions. A street tree within the proposed crossing is often fatal to that exact position, particularly where the tree is protected by a Tree Preservation Order or stands in a conservation area, where six weeks' notice is required before any work. Lamp columns, telecoms cabinets, stop taps, gully gratings and inspection chambers can usually be moved, at your cost, by the undertaker that owns them. That cost is frequently larger than the crossing itself.

Gradients matter too. The fall from the footway level to your driveway has to be gentle enough that a car does not ground, and the footway crossfall has to keep draining along the channel rather than into your garage door.

And one point catches people out repeatedly: the crossing must serve a hardstanding deep enough to hold a car clear of the footway. A driveway that leaves a bonnet overhanging the pavement will not be approved, however keen you are on the extension behind it.

Surfacing and the front garden rules

Laying a hard surface within the curtilage of a house is permitted development under Class F of Part 1 of Schedule 2 to the Order, with a condition attached to land between the principal elevation and a highway. There the surface has to be made of porous material, or run-off has to be directed to a permeable or porous area within your own curtilage. Government guidance on paving front gardens puts the practical line at five square metres: more than that in impermeable surfacing, draining to the road, is development and needs permission.

Permeable block paving, gravel retained in a cellular grid, and resin-bound surfaces laid over a free-draining base all satisfy the condition. So does conventional paving falling to a gravel strip or a shallow filter drain along the boundary. Draw the drainage arrangement on the plan rather than leaving it to be assumed, because an officer who cannot see where the water goes will ask.

Front garden surface Permitted development under Class F
Permeable block paving over a granular sub-base Yes
Gravel in a cellular containment grid Yes
Impermeable paving falling to a soakaway or border within the curtilage Yes
Impermeable paving over five square metres draining to the highway No, apply for permission
Any of the above where an Article 4 direction applies Check with the local planning authority first

Costs, programme and sequencing

Charges for a vehicle crossing are set locally and published by each highway authority, usually as an application fee plus a quoted price for the works, with separate charges for moving apparatus. They are reviewed periodically, so take the figure from the authority's current schedule rather than from a neighbour who did theirs three years ago.

On timing, treat the crossing as the longer pole. A householder planning application is normally determined in eight weeks. A crossing application involves a site visit, a quotation, acceptance, a works order and a slot in the contractor's programme, and that chain can easily run past the planning decision.

The sensible order is to apply for both at once, build the extension, then have the crossing constructed last. Footway works ahead of the build get churned up by deliveries and skips, and no authority will reconstruct them for free. Where the extension drawings need a supporting statement, the access and parking arrangement belongs in the design and access statement rather than being left to the site plan, and on a classified road the highway safety case is worth setting out properly in a planning statement.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. A Lawful Development Certificate is the only formal way to confirm that works are lawful.

Enter your postcode on PlanScope to see which reports a householder scheme on your frontage is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission for a dropped kerb?

Usually no. Forming an access is permitted development under Part 2 of Schedule 2 to the General Permitted Development Order 2015, unless the road is a trunk road or a classified A, B or C road. Permission is also needed where a condition or an Article 4 direction has removed the right. The crossing itself always needs separate highway consent under section 184.

Who do I apply to for a vehicle crossing?

The highway authority for your road. In a two-tier area that is the county council, and in a unitary authority, metropolitan borough or London borough it is the same council as your planning department but a different team. National Highways deals with trunk roads, and a small number of London routes sit with Transport for London.

Can I build the crossing myself?

Not usually. Most authorities either carry out the works through their own term contractor or require an approved contractor from a published list, with the finished crossing inspected and adopted as public highway. Working in the highway without authorisation risks a notice under section 184 requiring the works to be redone at your expense.

Will a street tree stop my dropped kerb?

It can stop that particular position. A tree in the verge belongs to the highway authority, and removal is rarely agreed where the tree is healthy, protected by a Tree Preservation Order or standing in a conservation area. The usual answer is to shift the crossing along the frontage, which may mean redesigning the driveway behind it.

Does my driveway surfacing need permission?

Only in the front garden, and only if it is impermeable. Class F of Part 1 permits hard surfaces within the curtilage, but land between the principal elevation and the highway must be porous or drain to a permeable area inside your own boundary. Government guidance treats more than five square metres of impermeable surfacing draining to the road as needing permission.

Sources and further reading

dropped kerbhighways act 1980permitted developmenthouseholderdrivewayaccess

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Householder Extensions and Conversions

View all →
Householder Extensions and Conversions7 min read

Light wells, front gardens and basement conversions

The excavation is often invisible in planning terms while the light well changes the front elevation. Here is how the two are assessed, and where party wall and drainage duties bite.

Read article →
Householder Extensions and Conversions7 min read

Outbuilding eaves heights and the boundary rule

The 2.5 metre boundary cap and the 2.5 metre eaves limit are different rules that apply together. Both are measured from the highest adjacent ground, which is where garden rooms go wrong.

Read article →
Householder Extensions and Conversions7 min read

Raising the ridge for loft head height

Class B does not permit an enlargement above the highest part of the existing roof, so any ridge lift is a full application. Check the head height numbers before you commit to one.

Read article →
Householder Extensions and Conversions7 min read

Annexes and the ancillary use test

Planning does not care who lives in an annexe. It asks whether the accommodation is ancillary to the house or a separate planning unit, and the answer changes everything about the application.

Read article →
Householder Extensions and Conversions8 min read

Roof terraces on a rear extension and overlooking

Balconies, verandas and raised platforms are excluded from Class A, so any roof terrace on a rear extension is a full application. Here is how overlooking is assessed and what mitigation works.

Read article →
Householder Extensions and Conversions8 min read

L shaped dormers on a terrace: what Class B allows

An L shaped dormer is one enlargement across two roof planes. Whether the 20 centimetre set back applies to the lower limb depends on whether the back addition is original.

Read article →