Energy, Sustainability and Carbon

Energy and overheating evidence for student and co-living

7 min readBy PlanScope Editorial Team

Purpose-built student accommodation and co-living are sui generis uses assessed as rooms for residential purposes, which changes the Part L route, the TM59 occupancy profile and the corridor criterion that usually decides the scheme.

Student accommodation overheating energy work is assessed differently from flats, and the reason is occupancy. A purpose-built student bedroom may be occupied at any hour of the day, every day of term, by one person with a laptop, a kettle, a fridge and an en-suite. Dynamic thermal modelling has to assume that. A one-bedroom flat modelled on the standard residential profile assumes the occupant leaves for work, and the two assumptions produce different answers from the same geometry.

Get the profiles wrong at planning stage and the energy strategy you submit will not survive the Part L submission, which means a revised strategy, a possible amendment application and a conversation with the authority about a condition you have already discharged.

Why the use changes the assessment

Purpose-built student accommodation and large-scale shared living are both sui generis uses. They are not dwellinghouses, and the rooms within them are normally treated as rooms for residential purposes rather than dwellings. That has a practical consequence that catches design teams out: for Building Regulations Part L compliance these buildings are usually assessed as non-domestic buildings using SBEM or dynamic simulation, not with SAP.

The planning submission should reflect the same route. An energy statement that presents SAP outputs for a student block will be queried, and in London it will be queried by the Greater London Authority as well as the borough.

Overheating is governed by Part O of the Building Regulations, which applies to new residential buildings including rooms for residential purposes. Compliance runs either through the simplified method, with its glazing area limits and minimum free ventilation areas, or through dynamic thermal modelling following CIBSE TM59. For a deep-plan block with single-aspect rooms, the simplified route rarely works, so assume modelling.

Occupancy and internal gains in a single room

TM59 sets out the assessment approach, and its guidance on student accommodation is the part to read closely. Student bedrooms are assessed on the basis that they may be occupied throughout the 24 hours rather than only at night, because residents study, sleep and socialise in the same 18 m² room.

The gains that matter in that room:

  • One occupant present far more of the day than a residential profile assumes.
  • Small power from laptops, chargers, a kettle and often a microwave.
  • A compact fridge running continuously.
  • An en-suite with a towel rail, and hot water pipework passing through the room.
  • Single-aspect glazing with limited cross-ventilation.

Illustrative example. An 18 m2 cluster bedroom with a 1.8 m wide window on a south-west elevation, one occupant, 150 W of small power and an uninsulated hot water riser in the en-suite wall will usually fail the TM59 bedroom criterion on a sheltered site before any shading is added. Reducing the glazed area, adding external shading to the upper floors and insulating the riser are the three moves that tend to recover it. The figures here are illustrative rather than drawn from a real assessment.

Co-living differs again. Bedrooms are smaller, communal kitchens and lounges carry the cooking and social gains, and the corridors are longer because the plan is deeper. The London Plan 2021 treats purpose-built student accommodation and large-scale purpose-built shared living under separate policies, and an assessment that blends the two profiles will satisfy neither.

Communal corridors and distribution losses

Corridors are where these buildings fail, and they fail for a reason that has nothing to do with glazing. Communal heating and hot water pipework runs through them, often in risers and ceiling voids with inadequate insulation, and the corridor has no openable window.

TM59 includes a separate criterion for communal corridors in buildings with communal heating or hot water systems, limiting the hours for which the operative temperature exceeds 28 degrees. Meeting it is a coordination exercise rather than a modelling one.

What actually fixes it:

  1. Insulate primary and secondary pipework to a specified standard and model the residual losses rather than assuming them away.
  2. Keep hot water distribution out of unventilated corridors where the plan allows.
  3. Use mechanical ventilation to the corridor with a defined rate, and state it in the energy strategy.
  4. Reduce the number of valve sets and heat interface units sited in corridor cupboards.

The temptation at planning stage is to leave all of this to the detailed design. Do not. The corridor temperature criterion can drive riser positions and ceiling zones, which are drawn on the planning drawings, and changing them later is an amendment.

Ventilation in a small room with a noisy facade

Part O also constrains the solution. If the strategy relies on open windows at night and the facade faces a road or a railway, the acoustic assessment and the overheating assessment start to contradict each other. One wants the window open, the other wants it shut.

Resolving that is design work, not reporting work. The usual answers are acoustically attenuated background ventilators, a secondary opening on a quieter elevation, or mechanical ventilation with a cooling capability where the hierarchy justifies it. Each has a cost and each shows on the elevations.

In London, the cooling hierarchy in the London Plan requires passive measures to be exhausted before active cooling, and an assessment that jumps to comfort cooling without working through the hierarchy will be sent back. Outside London, many local plans now carry a similar sequence.

Metering, reporting and the planning condition

Communal heating brings metering obligations. The Heat Network (Metering and Billing) Regulations 2014 set requirements for heat meters and billing information for final customers, which for student accommodation and co-living interacts awkwardly with inclusive rents.

Expect two things in the decision notice. A condition requiring the development to be built in accordance with the approved energy strategy, with evidence at completion. And, on major schemes in London, a requirement to report actual energy performance under the Be Seen monitoring policy, which runs after practical completion and for several years of operation.

Conditions on these schemes are often drafted around the energy strategy rather than around individual measures, which gives the design team flexibility and takes it away at the same time. Flexibility, because a change of heat source within the approved hierarchy can be agreed. Taken away, because the strategy document becomes the approved detail, and anything inconsistent with it needs a formal amendment rather than a site decision.

Write the strategy knowing someone will measure it. Stating a distribution loss figure that the as-built system cannot achieve creates a reporting problem for whoever owns the building in five years.

The document pack and who writes it

For a major student or co-living scheme, the energy and overheating evidence normally comprises an energy statement following the Be Lean, Be Clean, Be Green, Be Seen hierarchy where the borough requires it, a TM59 overheating assessment, a sustainability statement, and a whole life carbon assessment on larger schemes.

An Energy Statement sets the regulated emissions case and the hierarchy. An Overheating Risk Assessment covers the TM59 modelling, including the corridor criterion. A Sustainability Statement pulls the wider policy compliance together. Councils normally expect a suitably qualified author for the modelling, and professional review is strongly advised.

Where PlanScope helps is the narrative and the policy structure. It drafts the statement against the adopted local plan and the current National Planning Policy Framework in minutes, flags where site-specific facts are missing, and leaves the modelling outputs to the engineer who ran them. On a scheme where the fabric specification is still moving, the discipline of writing the policy case early is useful in itself, much as it is when setting the U-values officers look for.

Enter your postcode on PlanScope to see which of the 66 report types a student or co-living scheme is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Are student rooms assessed with SAP or SBEM?

Rooms for residential purposes in purpose-built student accommodation are normally assessed as non-domestic under Part L using SBEM or dynamic simulation rather than SAP. An energy statement presenting SAP outputs for a student block will be queried, and in London the Greater London Authority will raise it as well as the borough.

Why does TM59 treat student bedrooms differently?

Because a student room is a bedroom, study and living room in one. CIBSE TM59 guidance on student accommodation assesses the room on the basis that it may be occupied throughout the 24 hours, rather than using a residential profile that assumes the occupant is out during the day. That raises the modelled internal gains.

What is the corridor criterion in TM59?

TM59 includes a separate criterion for communal corridors in buildings with communal heating or hot water, limiting the hours for which operative temperature exceeds 28 degrees. It matters because pipework and heat interface units in unventilated corridors drive the temperature, so riser positions and ceiling zones shown on planning drawings can be affected.

Can the overheating strategy rely on opening windows?

Only if the acoustic position allows it. Part O limits reliance on openable windows where external noise is an issue, so a facade onto a road or railway forces attenuated background ventilators, a second opening on a quieter elevation, or mechanical ventilation. The two assessments have to be resolved together at design stage.

What metering obligations come with communal heating?

The Heat Network (Metering and Billing) Regulations 2014 set requirements for heat meters and billing information for final customers. For student accommodation and co-living with inclusive rents this needs working through early, and the planning condition on the energy strategy will usually require evidence at completion.

Sources and further reading

student accommodationco-livingoverheatingtm59energy statementpart o

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Energy, Sustainability and Carbon

View all →
Energy, Sustainability and Carbon6 min read

How officers weigh carbon in a committee report

Greenhouse gas emissions are capable of being material, and the weight they carry depends almost entirely on whether the adopted plan contains a numerical policy. Quantified claims get engagement, adjectives do not.

Read article →
Energy, Sustainability and Carbon6 min read

Green roof specification: substrate, biodiversity and energy

Substrate depth, not the product name, is what separates a biodiverse roof from a sedum mat. Specifying depth ranges, seed mixes and maintenance access is what gets a green roof condition discharged.

Read article →
Energy, Sustainability and Carbon6 min read

Standby generators and the air quality assessment

Generators are assessed on the test regime: how often, how long, how many units at once. Describe it in the application or environmental health will ask.

Read article →
Energy, Sustainability and Carbon6 min read

Rooftop heat pumps on blocks of flats and plant noise

Rooftop plant on residential blocks is assessed against a bedroom window a few metres away, not a site boundary. That changes the background measurement and the screening.

Read article →
Energy, Sustainability and Carbon6 min read

Electrifying a commercial kitchen: supply and extraction

Induction and electric ovens still produce grease and odour, so the extract train stays. The supply upgrade and the extra plant are what change the planning case.

Read article →
Energy, Sustainability and Carbon7 min read

Solar farms and continued grazing: the land quality test

A solar scheme that keeps sheep on the land still has to answer the best and most versatile land question. The evidence that works starts with a site-specific soil survey, not a provisional map.

Read article →