Energy assessor competence for an energy statement

7 min readBy PlanScope Editorial Team

An accredited energy assessor produces the modelling for an energy statement. Reading the local policy and staging the hierarchy is a separate skill, and the gap between the two is where statements fail.

Ask who writes an energy statement and you get two answers that are both incomplete. An accredited energy assessor produces the calculations. Somebody who understands the local policy writes the document. On most schemes those are different people, and the gap between them is where energy statements fail at validation.

An accreditation to produce a compliance calculation for a dwelling is not an accreditation to write a planning document. That distinction is worth holding onto when a fee proposal lands.

What an energy statement has to demonstrate

At planning stage the statement has to show how the development meets the carbon reduction policy in the adopted local plan, which usually means a percentage improvement on the building regulations baseline, demonstrated through a staged hierarchy rather than by a single number.

In London the hierarchy is set out explicitly as be lean, be clean, be green and be seen, and the London Plan requires carbon savings at each stage with a shortfall against the target made up by a payment into the borough's carbon offset fund. Outside London the wording varies but the structure is similar: reduce demand through design first, then supply heat efficiently, then generate renewable energy, then prove it.

The document also has to address matters the calculation does not cover. Heat network connection feasibility where a network exists or is planned. Overheating risk, often cross-referenced to a separate assessment. Water efficiency where local policy sets a target. And the practicality of the measures, since an officer will notice if the photovoltaic array covers a roof the drawings show as a terrace.

Accreditation schemes and what each covers

Energy assessor accreditation is tiered, and the tiers matter because they limit which software and which buildings an assessor may work on.

Role Covers Typical use
On construction domestic energy assessor New and converted dwellings using the government's standard assessment procedure Dwelling emission rates, energy performance certificates
Non-domestic energy assessor, lower levels Simpler non-domestic buildings using the simplified building energy model Small commercial units, shells
Non-domestic energy assessor, higher level Dynamic simulation modelling of complex buildings Mixed use schemes, buildings with atria or complex servicing
Low carbon consultant and similar registers Design-stage advice and modelling competence Energy strategy, hierarchy staging
Chartered building services engineer Design of the systems themselves Heat networks, heat pumps, ventilation strategy

Accreditation is held through government-approved schemes, which maintain registers, audit lodged assessments and require continuing professional development. Ask for the assessor's scheme and accreditation number, and ask which level it covers, because a lower-level non-domestic accreditation cannot produce the dynamic model a complex building needs.

None of these registers is a planning qualification. The policy reading, the hierarchy argument and the response to the authority's energy guidance come from experience with that authority's requirements.

Modelling the stages of the hierarchy

The staged calculation is the part that goes wrong most often, because each stage has to be modelled as a discrete case and reported as a separate emission figure.

The baseline is the regulations notional building for the relevant edition of the fuel and power approved document. The first stage models the proposal with its fabric, form, glazing ratio, air tightness and passive measures but with the baseline services. The second stage adds the heating and cooling strategy, including any communal or network connection. The third stage adds on-site renewable generation. The fourth, where local policy requires it, commits to monitoring and reporting actual performance after occupation.

Common errors in that sequence:

  • claiming fabric savings in the first stage that are really the result of a heat pump, which belongs in a later stage
  • modelling an air source heat pump without the space for the external units shown on the drawings
  • taking photovoltaic output from a roof area that includes plant, access zones and shaded strips
  • reporting only the final figure, so the authority cannot see which stage delivered the saving

Where one party produces the modelling and another submits the application, settle the scope and the responsibility in writing, as you would whenever one party writes and another submits.

Carbon factors and stating the version used

Every energy statement should say which calculation version and which carbon factor set it uses, on the first page.

The reason is arithmetical. The carbon intensity of grid electricity has fallen a long way as generation has decarbonised, and the factors embedded in successive versions of the calculation methodology reflect that. A strategy modelled on older factors can show gas heating outperforming a heat pump, while the same building on current factors shows the opposite. Officers who have seen both are alert to it.

So state the version, state the factor source and date, and note any local guidance that specifies which to use. Where the authority's own energy guidance names a methodology, follow it even if a different one is more favourable, because a statement that does not follow the published guidance invites a request for resubmission.

Where the statement meets building regulations

Two separate exercises run on the same model and they are often confused.

The planning energy statement is a design-stage document assessed against local policy. Building regulations compliance is demonstrated to building control through as-designed calculations before work starts and as-built calculations at completion, against the standards in the current fuel and power approved document.

The risk is divergence. The planning statement commits to a fabric specification and a renewable installation, the contractor substitutes an equivalent, and the as-built calculation still passes the regulations while missing the planning commitment. Nobody checks the planning condition until an occupier asks why the solar array is half the size.

Running both exercises through the same assessor, with the planning model carried forward rather than rebuilt, removes most of that risk and costs less than two separate commissions.

Securing the measures by condition

Authorities secure energy commitments by condition, and the wording of the condition decides whether the commitment survives value engineering.

Conditions that work name the measure and the performance: the fabric values by element, the installed capacity and location of the renewable technology, the heating system type, and a requirement to submit as-built calculations demonstrating the approved saving. Conditions that do not work simply require development to be carried out in accordance with the energy statement, because the statement is usually a narrative rather than a specification.

Where connection to a future heat network is relevant, the usual device is a condition requiring the building to be designed to allow connection, with pipework routes and plant space reserved, rather than a commitment to connect to something that does not yet exist.

Verification after construction

The direction of travel in policy is towards proving performance rather than predicting it. London's reporting requirement asks developments to monitor and report actual energy use after occupation, and other authorities are adopting similar conditions.

What that means practically is metering strategy at design stage, a commitment to report at defined intervals, and someone responsible for doing it after the developer has moved on. Build the obligation into the management company documents, not just the planning condition.

Independent review of the statement before submission is worth the fee where the policy target is met by a narrow margin, and the argument for a professional sign-off on an AI-assisted draft is the same argument: somebody accountable has checked the numbers.

Appointing and briefing the assessor

Appoint at the end of concept design, which is late enough for the form to be settled and early enough for glazing ratios and orientation to change.

The brief should name the local policy target and the authority's energy guidance, require the staged hierarchy with separate emission figures and a clear statement of the version and carbon factors, require the measures to be shown on the architectural drawings rather than described, and require a proposed condition wording for the measures relied on.

Reviewers in PlanScope's professional directory can review and sign off AI-drafted documents, and PlanScope's report types include the energy statement as a drafted starting point for the accredited assessor who produces the modelling. For specialist technical reports, qualified professional input may be required.

Enter your postcode on PlanScope to see which reports your scheme is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Can a domestic energy assessor write my energy statement?

They can produce the dwelling calculations, which is part of it. The statement itself also has to read the local carbon reduction policy, stage the hierarchy with separate emission figures, address heat network feasibility and overheating, and show the measures on the drawings. That is experience with the authority's requirements rather than an accreditation.

What accreditation level is needed for a complex building?

Dynamic simulation modelling requires the higher level of non-domestic energy assessor accreditation. A lower level accreditation covers the simplified building energy model and simpler buildings only. Ask for the scheme, the accreditation number and the level, because the level limits which software the assessor may use.

Why do carbon factors matter in an energy statement?

Because the carbon intensity of grid electricity has fallen substantially as generation decarbonised, and successive versions of the calculation methodology reflect that. A strategy modelled on older factors can show gas heating outperforming a heat pump, while current factors show the opposite. State the version and factor source on the first page.

Does the planning energy statement satisfy building regulations?

No. The statement is a design-stage document assessed against local policy, while regulations compliance is demonstrated to building control through as-designed and as-built calculations. Running both through the same assessor, carrying the planning model forward, avoids the divergence that leaves a planning commitment unmet.

How should energy measures be secured by condition?

By naming the measure and its performance: fabric values by element, the installed capacity and location of any renewable technology, the heating system type, and a requirement to submit as-built calculations. A condition that simply requires development in accordance with the energy statement is weak, because the statement is usually narrative.

Sources and further reading

energy statementcompetencecarbonpart laccreditation

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications6 min read

Whole life carbon assessment competence and scope

The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →
Professionals and Qualifications6 min read

What MRTPI tells you about a planning agent

Chartered membership of the Royal Town Planning Institute signals assessed competence and a binding code of conduct. It is not a financial remedy, and planning consultancy has no protected title at all.

Read article →