Entry level exception sites and how they qualify

6 min readBy PlanScope Editorial Team

Entry level exception sites allow small unallocated sites next to a settlement to come forward for homes aimed at first time buyers. Here are the size and location limits and how the route differs from a rural exception site.

An entry level exception site is a small, unallocated site adjoining an existing settlement, brought forward for homes suitable for first time buyers and others in similar circumstances. The route exists in the National Planning Policy Framework rather than in statute, which means it carries weight as policy and has to be argued against the development plan under section 38(6) of the Planning and Compulsory Purchase Act 2004. Four tests decide whether a site qualifies: it must be unallocated, it must adjoin a settlement, it must be small in relation to that settlement, and the homes must be affordable housing as the Framework defines it.

Landowners hear exception and assume the policy sets aside the plan. It does not. It creates a narrow route through a plan that would otherwise refuse the site.

What the policy allows

The policy supports the development of entry level homes on land that the development plan has not allocated for housing, where that land sits next to an existing settlement. The homes are aimed at households who would otherwise struggle to buy or rent locally, and the site is expected to be proportionate rather than a standalone extension to the village.

The logic is simple enough. Small sites on the edge of settlements are usually resisted because they lie outside a settlement boundary. Where the whole point of the scheme is affordable entry level housing, the Framework allows that benefit to outweigh the location objection, subject to the limits below.

Where it sits in national policy

The Framework was re-issued on 17 August 2026 with policy-coded chapters in place of the paragraph numbering used in earlier editions, so quote the current edition by its policy code rather than a paragraph number from an older copy. Since the policy was introduced the Framework has capped these sites at no larger than one hectare, or 5 per cent of the size of the existing settlement, whichever is the smaller. Confirm the current wording and figures on gov.uk before you rely on them.

The policy also steers these sites away from the most sensitive designations. Development within National Parks, National Landscapes and the Broads is treated differently, and an exception site argument carries much less force in those areas. Green Belt is a separate question again, where the exception site policy does not displace Green Belt policy.

Size and location limits

Three measurements decide most cases, and all three need drawing rather than asserting.

Test What has to be shown
Allocation status The site is not allocated for housing in the adopted plan or in an emerging plan at an advanced stage
Adjoining a settlement The site shares a boundary with the built-up edge, not with an isolated group of buildings
Scale Site area within the Framework cap, measured against the settlement footprint

The settlement footprint calculation is where applications fall apart. Take the built-up area from the adopted plan's settlement boundary where one exists, measure it, and show the arithmetic on a plan with both areas labelled. Choosing a generous definition of the settlement to make a larger site fit is the first thing an officer will test, and it is the first thing an inspector will take apart on appeal.

Which products qualify

Entry level means affordable housing within the Framework's own definition rather than homes that happen to be inexpensive. In practice that covers affordable housing for rent, shared ownership and other intermediate products, and First Homes where the authority's policy supports them. Open market housing at a modest price is not an entry level product.

The tenure mix has to be fixed by a planning obligation under section 106 of the Town and Country Planning Act 1990, with the discount, eligibility and the mechanism for keeping the homes affordable in perpetuity all set out. An Affordable Housing Statement is the document that sets the mix against the adopted policy and the evidence of local need, and it is worth preparing before you approach the council rather than after.

A related but separate route exists for First Homes specifically, with its own tests and its own guidance, and our note on First Homes exception sites and their tests explains how the two differ.

An illustrative edge of settlement example

Illustrative example. A village of roughly 400 dwellings has a settlement boundary drawn in the adopted plan. A paddock of 0.6 hectares sits immediately behind the last pair of cottages, with frontage to the lane and a mains sewer in the carriageway.

The arithmetic works: 0.6 hectares is under the one hectare cap, and measured against the village footprint it falls under the proportionate limit. The site adjoins the built edge rather than standing apart from it. The scheme is 12 homes, all affordable, with a tenure split agreed with the housing officer and secured by a section 106 agreement.

What decides it is not the policy test. It is highway visibility at the field gate, the capacity of the sewer, whether the paddock is a valued local green space, and whether the parish council accepts the location. The exception site policy gets the application past the settlement boundary objection, and then the ordinary planning judgements apply. Where the authority cannot demonstrate a five year housing land supply, the balance shifts further, and our explanation of the housing trajectory and the five year buffer sets out how that works.

How it differs from a rural exception site

The two routes get used interchangeably and they are not the same thing.

A rural exception site delivers affordable housing to meet local needs in a rural area, usually in or adjoining a village, and local connection criteria are normally attached so that the homes go to people with a link to the parish. Market housing can sometimes be included to cross-subsidise the affordable element where that is necessary to make the scheme deliverable.

An entry level exception site is aimed at first time buyers and renters more generally, is not limited to rural areas, and carries the explicit size cap described above. The two policies can overlap on the same village edge, and which one you argue changes the evidence: a rural exception site needs a local housing needs survey, while an entry level site needs the proportionality arithmetic and the product definition.

Testing whether a site qualifies

Work through it in this order before spending money on design.

  1. Confirm the site is not allocated, and check the emerging plan's stage and allocations.
  2. Establish whether the site adjoins the built-up edge, with a plan showing the shared boundary.
  3. Measure the site and the settlement, and calculate the proportion.
  4. Check designations: National Park, National Landscape, Green Belt, local green space, conservation area, flood zone.
  5. Agree a tenure mix and a delivery route with a registered provider, in writing.
  6. Test highways, drainage and ecology at a high level, because these refuse more exception sites than policy does.
  7. Take pre-application advice and ask specifically whether the officer accepts the proportionality calculation.

Set the whole case out in a Planning Statement that deals with the policy test and the ordinary development plan policies separately, because committees treat them as separate questions. Browse the full list of report types by category to see what else a site of this kind usually needs.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How big can an entry level exception site be?

The Framework has capped these sites at no larger than one hectare, or 5 per cent of the size of the existing settlement, whichever is the smaller. The settlement measurement has to be shown on a plan with both areas labelled. Confirm the current wording on gov.uk, because the Framework was re-issued on 17 August 2026 with policy-coded chapters.

Can an entry level exception site be in the Green Belt?

The exception site policy does not displace Green Belt policy, so a site in the Green Belt still has to deal with inappropriate development and very special circumstances. Affordable housing need can form part of a very special circumstances case, but it is argued under Green Belt policy rather than as an exception site, and the bar is much higher.

What is the difference from a rural exception site?

A rural exception site meets local affordable need in a rural area and normally carries local connection criteria, with market housing allowed where it is needed to cross-subsidise delivery. An entry level exception site targets first time buyers and renters generally, is not limited to rural areas, and carries an explicit size cap measured against the settlement.

Does open market housing count as entry level?

No. The homes have to be affordable housing within the Framework's definition, which covers affordable rent, shared ownership and other intermediate products, along with First Homes where local policy supports them. Market homes at a modest asking price do not qualify, and the tenure has to be secured by a section 106 planning obligation.

Who secures the affordability in the long term?

A planning obligation under section 106 of the Town and Country Planning Act 1990, usually with a registered provider as a party. The agreement fixes tenure, discount levels, eligibility criteria and the mechanism that keeps the homes affordable on resale or reletting. Councils will not grant permission on the policy without that obligation in place.

Sources and further reading

entry level exception siteaffordable housingfirst homesrural exception siteplanning glossary

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary7 min read

Disaggregation of a use: when splitting a unit needs consent

Subdividing a shop, office or house into separately occupied units can amount to development even where the use class does not change. The test turns on the planning unit, not the activity.

Read article →
Glossary7 min read

Blue line land and what it signifies

The red line defines the permission. The blue line defines nothing, but it tells the officer how much land you hold and invites questions worth anticipating.

Read article →
Glossary7 min read

Severability of a planning permission

English law treats a planning permission as authorising one development, not a menu. Hillside confirmed the position, and it shapes how phased sites and drop-in permissions should be handled.

Read article →
Glossary7 min read

Revocation and modification orders explained

A council can revoke or modify a permission it has already granted, but the compensation liability under section 107 is why it almost never does.

Read article →
Glossary7 min read

Imperative reasons of overriding public interest

IROPI is the last-resort route to consent a scheme that will harm a habitats site. It only opens once alternatives are ruled out and compensation is secured.

Read article →
Glossary6 min read

Salami slicing and cumulative effects in EIA

Dividing a scheme into sub-threshold applications does not remove the assessment duty. How officers test for a single project and how cumulative effects are scoped.

Read article →