Planning Law Updates

Environmental Outcomes Reports: the proposed EIA replacement

6 min readBy PlanScope Editorial Team

Environmental outcomes reports are enabling powers, not law in force. Scope to the 2017 EIA Regulations, and build an evidence base that reports against outcomes too.

Environmental outcomes reports are the framework set out in Part 6 of the Levelling-up and Regeneration Act 2023 to replace environmental impact assessment and strategic environmental assessment in England with an assessment measured against government-set outcomes. As at 15 September 2026 the framework remains a set of enabling powers. The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 still govern EIA development, and any scheme being scoped now should be scoped to those Regulations.

Treat this as a watching brief with one design consequence: build an evidence base that can be reported against outcomes as well as against effects.

What the 2023 Act provides for

Part 6 of the Levelling-up and Regeneration Act 2023 gives the Secretary of State power to make regulations requiring an environmental outcomes report for specified consents and plans. The outcomes themselves would be set in regulations, with reports assessing the extent to which a proposal delivers or works against them, and with a duty on the decision-maker to have regard to the report.

The Act also provides powers on monitoring, on remedies where outcomes are not delivered, and on a non-regression principle intended to stop the new regime weakening environmental protection compared with the arrangements it replaces.

None of this bites until regulations are made. Powers in the 2023 Act have been switched on in stages through separate regulations, so the position has to be checked rather than assumed. The relevant government consultation, Environmental Outcomes Reports: a new approach to environmental assessment, was published in 2023 and covered the principles, the outcomes approach and the proposed scope.

How an outcomes based system would differ from EIA

EIA asks what the likely significant effects of a project on the environment are, describes them, and requires mitigation of the harmful ones. An outcomes based system asks whether the proposal delivers against stated outcomes, and by how much.

The practical differences would show up in four places.

Feature EIA under the 2017 Regulations Environmental outcomes reports as proposed
Test Likely effects on the environment and their significance Extent of delivery against set outcomes
Structure Topic chapters with effect significance ratings Reporting against each relevant outcome
Threshold Schedules 1 and 2 with screening To be set in regulations
After consent Monitoring where required Monitoring and remedies powers in the Act

Two things would probably survive in recognisable form. The underlying technical work, the ecology surveys, the air quality modelling, the noise measurements, the traffic counts, would still be needed, because outcomes cannot be measured without data. And the requirement for competent experts would remain, because a report on habitat condition is only as good as the ecologist who produced it.

What the 2017 Regulations still require today

Nothing in the 2023 Act changes the current duty. Schedule 1 development requires EIA in every case. Schedule 2 development requires screening where it exceeds the applicable threshold or falls within a sensitive area, with the selection criteria in Schedule 3 applied to the decision.

Where EIA is required, the Environmental Statement must be prepared by competent experts and must include the information specified in the Regulations, including reasonable alternatives studied and the main reasons for the option chosen. An Environmental Impact Assessment draft is a starting point for that expert team and never a substitute for it. The determination period for EIA development is 16 weeks rather than 13.

Screening and scoping opinions remain worth requesting in writing. A screening opinion that says EIA is not required is a document a third party may later challenge, and the reasoning matters.

A scoping opinion does more work than people expect. It fixes the topics, the study areas and the assessment methods with the authority and its consultees, so the argument at determination is about findings rather than about method. Where the opinion omits a topic an objector later raises, the record of what was agreed is the defence. Ask for the opinion early enough that the survey programme can follow it, because a topic added at scoping in October may need a survey window that opens in April.

Transitional arrangements and what is unclear

The Act contemplates transitional provision, and the shape of it is one of the open questions. The issues practitioners will want answered when regulations appear are these: whether a scheme with an accepted scoping opinion under the 2017 Regulations may continue under them, whether a screening direction survives the switch, how the new outcomes map onto the topics an existing environmental statement already covers, and whether plan-making and project consent move at the same time.

None of that can be stated now. Anyone who tells you the transitional rules with confidence is guessing, and the honest position is that the detail lives in regulations that have not been made.

What this means for scoping a major scheme now

Scope to the 2017 Regulations, because they are the law. Then make three adjustments that cost little and pay off either way.

Record baseline data in a form that can be reported as a quantity rather than only as a judgement. Habitat units under the statutory metric, tonnes of carbon, dwellings within a stated distance of a bus stop, and percentage tree canopy cover are all quantities. Effect significance ratings are not.

Keep the monitoring proposals real. The 2023 Act's monitoring and remedies powers point towards a system that checks whether what was promised happened, and a scheme with a credible monitoring plan is better placed under either regime. That thinking already runs through mandatory biodiversity net gain, where a Biodiversity Net Gain Assessment has to be followed by a 30 year management and monitoring commitment.

And separate the data from the interpretation in the document structure, so a chapter can be re-presented against outcomes without redoing the survey work.

Where the reform sits against other changes

Environmental outcomes reports are one strand in a wider programme that includes National Development Management Policies, plan-making reform and the changes to habitats regulations assessment that sit behind nutrient neutrality. Those strands move at different speeds, and a scheme in a nutrient catchment is affected today by rules explained in the guidance on where the nutrient neutrality requirement comes from.

Watching what is brought into force, rather than what is announced, is the discipline. A written ministerial statement signals intent; a statutory instrument changes the law. The planning law updates timeline is where PlanScope tracks reform news, and the authoritative record of what has been brought into force is on legislation.gov.uk.

Future proofing an evidence base

Five habits make an evidence base portable between regimes.

  1. Quantify the baseline wherever a recognised metric exists, and name the metric and its version.
  2. State the survey date, method and standard for every dataset, so it can be re-used or refreshed without ambiguity.
  3. Hold the raw data as well as the figures reproduced in the chapter.
  4. Write mitigation as commitments with a responsible party and a date, rather than as intentions.
  5. Set out monitoring with a trigger and a remedy, because that is the direction of travel in the Act.

An evidence base built that way answers the 2017 Regulations today and would need re-presenting rather than rebuilding if the outcomes regime arrives.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Have environmental outcomes reports replaced EIA?

No. As at 15 September 2026 the Levelling-up and Regeneration Act 2023 contains enabling powers, and the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 continue to apply. Check on legislation.gov.uk what has been brought into force before relying on any statement about timing, because sections of that Act have been switched on in stages.

Would an outcomes report remove the need for surveys?

No. Outcomes have to be measured, and measurement needs data. Ecology surveys, air quality modelling, noise monitoring and traffic counts would still be required, and the Act's non-regression principle is intended to prevent the new regime weakening protection. Expect the same technical work, presented against outcomes rather than effect significance.

What is the non-regression principle?

It is the safeguard in the 2023 Act intended to prevent regulations made under the environmental outcomes powers from reducing the overall level of environmental protection compared with the arrangements they replace. How it is applied in practice will depend on the regulations themselves and on any guidance published alongside them.

Should a current major scheme wait for the new regime?

No. Scope to the 2017 Regulations, request a screening opinion in writing and proceed. There is no published start date to plan around, and a scheme held back for a regime that is not yet in force loses survey seasons. Build the evidence base so that quantified baselines and monitoring commitments are available if the regime changes.

Where can I check what has actually come into force?

Legislation.gov.uk records which sections of the Levelling-up and Regeneration Act 2023 have been brought into force and which regulations did it. Written ministerial statements and consultations signal intent, but only a statutory instrument changes the law. Check the legislation record rather than press coverage.

Sources and further reading

eiaenvironmental outcomes reportsplanning reformlevelling-up actmajor development

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates6 min read

Local validation lists: what authorities may require

A local list item only bites if it was published within two years and is reasonable for your scheme. How to check, and what to do when validation disagrees.

Read article →
Planning Law Updates8 min read

Temporary stop notices and how long they last

A temporary stop notice halts an activity on display, with no right of appeal, and now lasts up to 56 days in England. Here is what it can and cannot prohibit.

Read article →
Planning Law Updates7 min read

Appeal procedures compared: written, hearing and inquiry

You state a preference and the Inspectorate decides. Here is how the three appeal procedures are allocated, what each demands, and how to argue for the one you want.

Read article →
Planning Law Updates8 min read

Prior approval procedure and the deemed grant trap

The 56 day deemed grant under paragraph W runs from receipt, permits only what was submitted, and waives none of the class conditions. How to use it safely.

Read article →
Planning Law Updates7 min read

Permitted development conditions and the effect of a breach

A breached condition in the General Permitted Development Order leaves the whole extension unauthorised, not just the non-compliant part. What follows and how to fix it.

Read article →
Planning Law Updates7 min read

The standard method for local housing need explained

Local housing need now starts from existing stock rather than household projections. The result is a minimum for plan making, not a target, a ceiling or a test for any single application.

Read article →