Templates, Checklists and Examples

Evidencing a vacant building credit claim: a checklist

6 min readBy PlanScope Editorial Team

The vacant building credit can wipe out an affordable housing contribution, but it is won on evidence. Here is the document pack and the chronology a council will expect.

The vacant building credit reduces the affordable housing contribution on a scheme that brings a vacant building back into use or replaces it, by crediting the existing gross floorspace against what would otherwise be sought. It is worth real money on a conversion, and it is refused more often than it is granted, almost always on evidence rather than on principle. The credit turns on two questions the council will ask early: was the building in lawful use, and has that use been abandoned.

Build the evidence pack before you submit. Assembling it after a case officer has queried the claim is slower and weaker, because everything you produce then looks like it was produced to answer the query.

What the credit does to the contribution

National policy offers a developer a financial credit equivalent to the existing gross floorspace of relevant vacant buildings when the local planning authority calculates the affordable housing contribution. In practice the authority works out the contribution for the whole scheme, then discounts it in proportion to the vacant floorspace being reused or replaced.

So a scheme that replaces a vacant building with a new one of the same floorspace can extinguish the contribution. A scheme that doubles the floorspace keeps roughly half of it. The arithmetic is simple. The argument is never about arithmetic.

The credit sits within the wider obligations negotiation, so set it out in the Planning Statement and in any accompanying draft heads of terms, rather than leaving it to be discovered in a viability appendix.

The vacancy test and its wording

Guidance frames the credit around buildings that are vacant and are being brought back into lawful use or demolished and replaced. Two exclusions matter. The credit does not apply to buildings that have been abandoned. And it does not apply where the building has been made vacant for the sole purpose of redevelopment, which councils read as covering a deliberate emptying of a building shortly before an application.

Neither exclusion has a fixed time period attached to it in national guidance, which is why councils apply local thresholds in supplementary planning documents and why claims on similar facts come out differently in different boroughs. Check the adopted local position before you price the credit into a land bid.

Evidence that shows the building was in lawful use

The claim needs a documented lawful use, not just an empty building. Collect the following:

  1. The planning history: the original permission or evidence that the use predates the need for permission, plus any lawful development certificate under section 191 of the Town and Country Planning Act 1990
  2. Rating evidence: business rates records showing the assessment, the description of the hereditament and the dates it was occupied and then emptied
  3. Occupation evidence: leases, licences, rent demands and service charge accounts naming the occupier and the term
  4. Utility and service records: metered consumption showing an operating building, and the dates supply was reduced or disconnected
  5. Marketing evidence: agents' particulars, the asking rent or price, the marketing period and a schedule of enquiries and offers
  6. Physical evidence: dated photographs inside and out, insurance inspections, and any security or maintenance contracts that show the building was kept rather than left

The strongest packs are chronological. A single table running from the last occupation date to the application date, with a document reference against each entry, does more for a claim than a long narrative.

Abandonment and how it defeats a claim

Abandonment is a legal concept, not a synonym for empty. The courts look at the physical condition of the building, the length of time it has been out of use, whether any other use has intervened, and the owner's intentions as shown by conduct. A weatherproof unit marketed continuously for four years is not abandoned. A roofless shell with trees growing through it and no marketing history very likely is.

Intention is where owners damage their own case. Applying for a residential consent while telling the valuation office the building is derelict, or removing services to save standing charges, produces a paper trail that reads as giving up on the lawful use. If the building has to be mothballed, mothball it deliberately and record why.

The related point, and the one that catches conversions of older commercial stock, is that abandonment extinguishes the lawful use entirely, so it affects much more than the credit. Our note on abandonment of use sets out the four-part test and how it is argued.

Deliberate vacancy and the council's response

Where the council suspects the building was emptied to manufacture the credit, it will look for a lease surrender close to the application date, a marketing campaign that was never serious, or an occupier moved to another property in the same ownership.

The counter-evidence is commercial. Show why the occupier left, show the rent that could not be achieved, show the void period across comparable stock in the same location if a local agent will put it in writing. Where the building was empty on purchase, say so plainly and produce the sale documents. A claim that explains an awkward fact survives better than one that leaves it for the officer to find.

Calculating the credit

Work in gross internal or gross external floorspace consistently with the authority's own measurement basis, and state which you have used. Exclude any floorspace that was not part of the vacant building, including later extensions built without permission and structures that are not buildings.

An illustrative case: a vacant former workshop of 900 m² is replaced by 1,800 m² of flats in an authority seeking 30 per cent affordable housing. The credit covers half the new floorspace, so the contribution is calculated on the remaining half, and the policy percentage is applied to that. Numbers are illustrative only, and the authority's own formula and the tenure split in its adopted plan will decide the real figure.

Where the scheme is also relying on a Viability Assessment, keep the two arguments separate. Running them together invites the officer to treat the credit as a viability request, which it is not.

Presenting the claim with the application

Put the credit in its own short statement rather than burying it in the Affordable Housing Statement narrative. Set out the floorspace, the measurement basis, the vacancy chronology, the lawful use evidence, the response to abandonment and the resulting calculation, then append the documents in the order they appear in the chronology.

Raise it at pre-application. A case officer who has seen the chronology before validation will tell you which limb they doubt, and that feedback costs you nothing.

And expect the section 106 drafting to lag the agreement in principle. Ask for the credit to be recorded in the heads of terms with the floorspace figure written into the schedule, because a credit agreed in correspondence and omitted from the deed is a credit you will argue about at completion.

Structuring that evidence into a submission-ready statement is exactly the kind of drafting PlanScope handles: enter your postcode to see which reports your site needs.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the vacant building credit?

It is a national policy mechanism that offers a developer a financial credit equivalent to the existing gross floorspace of relevant vacant buildings when a local planning authority calculates an affordable housing contribution. The authority works out the contribution for the whole scheme, then discounts it in proportion to the vacant floorspace being reused or replaced.

How long does a building have to be vacant to qualify?

National guidance sets no fixed period. Councils fill the gap with local thresholds in supplementary planning documents, so the qualifying period and the evidence expected vary between authorities. Check the adopted local position before pricing the credit into a land bid, and raise the claim at pre-application so the officer can say which limb they doubt.

Does the credit apply to a building that has been abandoned?

No. Abandonment is an exclusion, and it is judged on the physical condition of the building, the length of time out of use, whether another use has intervened and the owner's intentions as shown by conduct. Abandonment also extinguishes the lawful use itself, so it affects the wider scheme as well as the credit calculation.

What evidence best supports a vacancy claim?

A chronological pack beats a narrative. Business rates records, leases and rent demands, metered utility consumption, marketing particulars with the period and enquiries, dated photographs and any maintenance or security contracts. Present them as a single table from the last occupation date to the application date, with a document reference against each entry.

Should the credit be argued alongside a viability case?

Keep them separate. The credit is a policy entitlement based on floorspace, while a viability assessment argues that the policy contribution cannot be afforded. Running them together invites the officer to treat the credit as a viability request. Record the agreed credit and its floorspace figure in the section 106 heads of terms rather than in correspondence alone.

Sources and further reading

vacant building creditaffordable housingsection 106planning obligationsdevelopment viability

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Templates, Checklists and Examples

View all →
Templates, Checklists and Examples7 min read

Checklist for responding to planning objections

An applicant's response to objections is a sorting exercise first. Answer the material points with dimensioned evidence, acknowledge private law issues in one neutral sentence, and offer conditions where you cannot prove a point.

Read article →
Templates, Checklists and Examples6 min read

Checklist for handover of planning documents at completion

The planning file handed over at completion is what a buyer's solicitor asks for years later. Here is the index, and the records that are hardest to recreate.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a tree works application under a TPO

TPO applications are free and decided in eight weeks, but vague descriptions get them refused. Here is the evidence that gets consent granted as proposed.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a demolition prior notification submission

A demolition prior notification is narrow by design. The authority can consider only the method of demolition and the proposed restoration of the site.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a larger home extension prior approval

A single storey rear extension deeper than 3m on a semi, or 4m on a detached house, needs prior approval under Class A. Here are the limits, the information to supply and how the neighbour consultation timetable works.

Read article →
Templates, Checklists and Examples7 min read

Checklist for responding to an invalid application notice

Until an application is validated there is no determination clock. Here is how to sort each item on an invalidity notice, decline requests that are not on the published local list, and protect the validation date.

Read article →