Expert witness duties at a planning inquiry

6 min readBy PlanScope Editorial Team

The duty runs to the inquiry, not the client. What that means for your proof of evidence, what you concede under cross-examination, and where costs awards come from.

An expert witness at a planning inquiry owes their primary duty to the inquiry, not to the party paying the fee. That single rule governs everything else: what goes in the proof of evidence, what you concede in cross-examination, whether you can act at all where you designed the scheme, and how you handle a client who wants a conclusion your data will not support. Inspectors are practised at spotting a witness who has forgotten it, and the consequences run from evidence given no weight to an award of costs against the party who called you.

Where the duty comes from

Planning inquiries are not courts, and witnesses are not normally on oath. The obligation is nonetheless well settled. It comes from the general law on expert evidence, from the Planning Inspectorate's own procedural guidance, and from the codes of the professional institutes.

The Royal Institution of Chartered Surveyors operates a mandatory practice statement for members acting as expert witnesses, which sets out the duty to the tribunal, the required declarations and the treatment of conflicts. The Royal Town Planning Institute's code of professional conduct requires members to act with competence, honesty and integrity, and not to make statements they know to be misleading. Ecologists bound by CIEEM, acousticians by the Institute of Acoustics and fire engineers by the Institution of Fire Engineers work to equivalent obligations.

The practical effect is the same across all of them. You give the opinion your evidence supports, you say where it is uncertain, and you say so in writing before anyone asks you in the room.

The documents you will produce

An inquiry generates a sequence of documents, and each has a different job.

The statement of case sets out the full particulars of the case a party intends to put, and it is filed early. The proof of evidence is your own signed evidence on your own subject area. Where a proof runs to more than 1,500 words, a summary is required, and the summary is what you will read out. Appendices carry the survey data, the modelling outputs and the policy extracts. Rebuttal proofs answer the other side's evidence and are permitted on a tight timetable, usually only with the inspector's agreement.

Proofs of evidence and their summaries are normally due no later than four weeks before the inquiry opens. The Procedural Guide for planning appeals in England sets the current timetable and should be read at the start of every instruction, because the arrangements have been revised repeatedly since the Rosewell review reshaped inquiry procedure.

What belongs in a proof, and what does not

A proof states your qualifications and experience, the instructions you received, the facts you relied on, the method you applied, the results, your opinion and the reasons for it. It ends with a declaration that the opinions expressed are your true and professional opinions.

Three things do not belong in it.

The first is advocacy. Arguing the planning balance is the advocate's job, and a witness who does it invites the inspector to treat the whole proof as partisan. The second is evidence outside your field, however tempting: an acoustician commenting on heritage significance is easy to dismantle. The third is a conclusion that your data does not reach. If the survey shows a moderate adverse effect, the proof says moderate adverse, whatever the client would prefer.

Say what you were not asked to do as well. A proof that records the limitations of the survey, the assumptions in the model and the areas where further work would reduce uncertainty is stronger, not weaker, in the room.

Statements of common ground

The statement of common ground is agreed between the parties and filed before the inquiry. Its purpose is to strip out the matters nobody disputes so that inquiry time goes on the real disagreement.

Take it seriously. A well-drafted statement of common ground on your subject can remove your appearance entirely, which saves the client several days of fees. Where agreement is partial, record precisely what is agreed and what is not, in numbered paragraphs, rather than producing a bland document that leaves the inspector to work out where the fight is.

Do not agree a fact you have not checked because agreement feels cooperative. You will be cross-examined on it.

Under cross-examination

The advocate's aim is to narrow your evidence until it no longer supports the case that relies on it. The counter is simple to describe and hard to do.

Answer the question that was asked. Concede the point that must be conceded, immediately and without qualification, then explain why it does not change your conclusion. Do not speculate outside your expertise, and say so when a question crosses that line. Keep your answers short, because long answers invite follow-up questions in territory you did not choose.

When you are shown a document you have not seen, ask for time to read it. Inspectors expect that and advocates dislike it, which is a reasonable indication that it is the right move.

Conflicts, fees and prior involvement

Prior involvement in the scheme is not an automatic bar, but it has to be declared and it changes how your evidence is read. A consultant who designed the drainage strategy and then gives expert evidence on flood risk is giving evidence about their own work, and the proof should say so plainly at the front.

Conditional or success-related fees are not acceptable for expert evidence. An expert whose payment depends on the outcome cannot give independent opinion, and confirming that no such arrangement exists is a standard part of the declaration.

The same discipline applies to reviewing and signing off documents you did not write. Where a professional reviews an AI-assisted draft through the PlanScope professional directory or any other route, the sign-off is a professional act carrying the reviewer's own liability, and it should be preceded by the same checks you would apply to a junior colleague's work: the data, the method, the site visit and the conclusions.

Costs risk and what triggers it

Either party can apply for an award of costs against the other for unreasonable behaviour, and the Planning Practice Guidance on appeals sets out what counts. Evidence is squarely within scope.

Producing expert evidence that is not supported by the underlying data, failing to substantiate a reason for refusal at inquiry, introducing new material late, or withdrawing a case at the last moment can all attract an award. A local planning authority that defends a refusal on ecology grounds with no ecological evidence is at risk. So is an appellant whose noise witness relies on measurements taken in the wrong conditions.

That risk is the reason to be careful at the instruction stage rather than the inquiry stage. Where the evidence will not support the case, the useful thing an expert does is say so in the first week, while the client can still choose a different route. A Planning Statement and the supporting technical documents assembled properly at application stage prevent a good many inquiries from happening at all, and it is worth checking which of the 66 report types should have been in the original submission.

This is general guidance rather than legal advice. Check the current procedural rules and your institute's requirements before accepting an instruction as an expert witness.

Enter a postcode on PlanScope to see which reports a site is likely to need before an application is made. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Do I need a summary with my proof of evidence?

Yes, where the proof runs to more than 1,500 words. The summary is the document you read at the inquiry, so it should carry your conclusions and the reasoning behind them rather than acting as a contents list. Check the Planning Inspectorate's Procedural Guide for the current deadlines, normally four weeks before the inquiry opens.

Can I act as an expert witness on a scheme I designed?

Prior involvement is not an automatic bar, but it must be declared clearly at the front of your proof, because you are giving evidence about your own work. The inspector will weigh the evidence knowing that. Where the conflict is severe, the better course is to instruct a second professional to give the expert evidence.

Are conditional fees allowed for expert evidence?

No. A fee that depends on the outcome is incompatible with the duty to give independent opinion to the inquiry, and confirming that no such arrangement exists is a standard part of the expert's declaration. Fees should be on a time or fixed basis agreed before the work starts.

What behaviour attracts an award of costs at an inquiry?

The Planning Practice Guidance on appeals covers unreasonable behaviour. Producing expert evidence unsupported by the data, failing to substantiate a reason for refusal, introducing material late and withdrawing at the last moment can all attract an award. Authorities defending refusals without technical evidence and appellants relying on flawed surveys are both exposed.

How much can a statement of common ground save?

A well-drafted statement of common ground on a technical topic can remove the need for that witness to appear at all, which saves the client several days of fees and shortens the inquiry. Record precisely what is agreed and what is not, in numbered paragraphs, rather than producing a general document that leaves the disagreement unclear.

Sources and further reading

expert witnessplanning inquiryplanning appealprofessional standardsproof of evidence

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications7 min read

Energy assessor competence for an energy statement

An accredited energy assessor produces the modelling for an energy statement. Reading the local policy and staging the hierarchy is a separate skill, and the gap between the two is where statements fail.

Read article →
Professionals and Qualifications7 min read

Who carries out a TM59 overheating assessment

TM59 overheating assessments are not reserved to any registered profession. What separates a usable report from a decorative one is the weather file, the openable area assumed and which units were tested.

Read article →
Professionals and Qualifications7 min read

Who may sign a biodiversity gain plan

A biodiversity gain plan is submitted by the developer and approved by the local planning authority. The competence question sits one level down, on the statutory metric and the condition assessment behind it.

Read article →
Professionals and Qualifications7 min read

What to ask a consultant before you appoint them

Ask who writes the report, what the fee excludes, how many revision rounds are included and what insurance the firm carries. Get all four answers in writing.

Read article →
Professionals and Qualifications7 min read

Independent audit of a technical report and who pays

An independent audit is commissioned by the authority, carried out by its appointed consultant and paid for by you. Here is how the process and the costs work.

Read article →
Professionals and Qualifications7 min read

Competence for a site waste management plan

Site waste management plans stopped being statutory in 2013, so the competence test is practical: waste hierarchy, duty of care and real contractor input.

Read article →