Getting consent for extra care and later living housing
Classification decides everything else. Describe the care model precisely, evidence the minimum package per resident, and design the building around it rather than the other way round.
The classification question decides an extra care application before anything else is argued. If the scheme is Class C2, residential institution, affordable housing policy usually does not apply to it and the obligation is drafted around care. If it is Class C3, self-contained dwellings, the full affordable housing requirement bites, the housing mix policies apply, and the scheme has to compete on ordinary residential terms. Councils and applicants disagree about this constantly, and the answer is a matter of fact and degree rather than a label you can choose. So the application has to be built around the care model and evidenced from it.
Classifying extra care between C2 and C3
The distinction rests on the level of care provided, how integral it is to the occupation, and whether the accommodation is self-contained. National guidance on housing for older and disabled people accepts that schemes span a spectrum from sheltered housing through extra care to registered care homes, and that the use class depends on the facts.
The features that push a scheme towards C2 are a substantial care package provided to every resident as a condition of occupation, care staff on site around the clock, a registered care provider delivering personal care, eligibility based on assessed care need rather than age alone, and communal dining or other services that residents are expected to use.
The features that push it towards C3 are self-contained flats with their own front doors, kitchens and bathrooms, care available but optional, and occupation on ordinary leases with no assessed need.
Most later living schemes sit somewhere in between, and the honest approach is to describe the care model precisely and argue the classification from it. Set out the minimum care package per resident per week, the staffing rota, the registration status of the care provider, the eligibility criteria and the communal offer. Then state your position on the class and why, in the Planning Statement, rather than leaving the officer to guess.
Affordable housing and the viability argument
If the classification lands on C3, affordable housing policy applies and the delivery mechanism has to be worked out. Affordable extra care is not straightforward, because a registered provider taking units has to take on the service charge and the care obligations with them.
Three routes appear in practice. Units transferred to a registered provider operating the same care model, which needs the provider identified early. A commuted payment where on-site delivery is impractical, which requires the council's policy to permit it. Or a viability case demonstrating that the scheme cannot support policy-compliant provision, which needs a Viability Assessment prepared to the approach in the RICS guidance on financial viability in planning.
The cost structure is the argument. Extra care carries higher build costs per square metre, a large area of communal space that generates no sales revenue, longer sales periods, and management and care set-up costs before the scheme reaches occupancy. Those are real and evidenced by the scheme's own cost plan, and they are also the standard arguments councils see from every applicant, so the appraisal has to be transparent about inputs rather than assertive about conclusions.
Where the council is sceptical, offer a review mechanism. A late-stage review of viability tied to actual sales values, secured in the obligation, is often what settles the negotiation.
Care hours evidence and the registered provider
This is the evidence that decides the classification, so treat it as the core of the submission.
- The minimum care package each resident receives, stated in hours per week, and how that minimum is guaranteed.
- The staffing establishment by role and shift, including overnight cover.
- The care provider, its registration status with the regulator, and the contractual route by which care is delivered.
- Eligibility criteria: age threshold, assessed care need, and how assessment is carried out on entry.
- What happens if a resident's needs increase beyond what the scheme can provide.
- The communal facilities and the services provided through the service charge.
Where the operator is not yet appointed, describe the model to be procured and offer an obligation requiring an operator meeting stated criteria. Officers accept that. What they do not accept is a scheme described as extra care with no care specification, which reads as retirement flats seeking to escape affordable housing policy, and is usually treated accordingly.
Communal facilities and internal space standards
Extra care schemes need more than a lounge. The facilities officers expect to see, and which support the C2 argument, include a restaurant or dining room with a commercial kitchen, communal lounges on each floor, a treatment or consulting room, an assisted bathroom, a laundry, a mobility scooter store with charging, a guest suite, staff facilities including a sleep-in room, and a buggy-accessible circulation layout.
Space standards need care. The nationally described space standard applies to self-contained dwellings, and extra care units usually exceed it because of wheelchair circulation. Design a proportion of units to the wheelchair user dwelling standard in the building regulations guidance, state the proportion, and show the turning circles on the plans rather than claiming compliance in text.
Corridor widths, door leaf widths, lift car sizes able to take a stretcher, level thresholds and handrail provision are the details that an access consultant will pick up and that a Design and Access Statement should show drawing by drawing.
Parking, ambulance access and staff travel
Car ownership among residents of extra care schemes is lower than in general housing, and officers accept reduced provision where it is evidenced rather than asserted. Use the operator's data from comparable schemes, or survey evidence, and state the assumption.
Then provide for the things that are specific to the use. A covered drop-off at the main entrance sized for an ambulance, with a route for a stretcher trolley to the lifts. Parking for staff across shift changes, which peaks at handover rather than at the times general residential parking peaks. Visitor parking, which is heavier than in general housing. Mobility scooter charging in a ventilated store. And a service yard that a refuse vehicle and a catering delivery can both use.
Ambulance access is the one that gets forgotten at layout stage and cannot be fixed later.
Section 106 wording tying care to occupation
The obligation is what makes the classification real, and its drafting matters more than its length.
- A definition of the use, including the care model and the facilities to be provided and retained.
- An occupancy restriction: minimum age, assessed care need, and any restriction on younger household members.
- An obligation to provide a minimum care package to every resident, with the minimum stated.
- A requirement that care is delivered by a provider registered with the regulator.
- A requirement to retain the communal facilities in their approved use.
- Any affordable provision, with the mechanism, tenure and transfer arrangements.
- A review mechanism where viability is in issue.
Test the wording against a hard question: what happens if the operator fails. An obligation that is unenforceable when the care provider walks away leaves the council with unrestricted flats, which is exactly what it was trying to prevent, and officers will therefore ask for a step-in or re-provision mechanism.
Building the application around the care model
Sequence the work so the care model comes first and the architecture follows.
Agree the operating model, the care package and the eligibility criteria. Write the care statement. Take it to pre-application discussion and get the officer's view on classification in writing. Then design the building to suit the model, with the communal schedule fixed before the unit count is optimised. Prepare the Affordable Housing Statement and viability material on the basis of the agreed classification. Then submit, with the care statement as the lead supporting document rather than an appendix.
Illustrative example: a 74-unit scheme with a restaurant, two communal lounges, a treatment room and 24-hour on-site care staff, offering every resident a minimum weekly care package and requiring an assessed care need on entry. The council accepted a C2 classification, the obligation defined the care model and required a registered provider with a step-in mechanism, and the affordable contribution took the form of a commuted payment.
Enter your postcode on PlanScope to see which documents a later living scheme on your site is likely to need.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Is extra care housing Class C2 or Class C3?
It depends on the facts. Features pointing to C2 include a substantial care package provided to every resident as a condition of occupation, round-the-clock care staff, a registered provider, eligibility based on assessed need, and expected use of communal services. Self-contained flats with optional care on ordinary leases point to C3.
Why does the classification matter so much?
Because affordable housing policy generally applies to C3 dwellings and generally does not apply to C2 residential institutions, and because housing mix policies follow the same split. The classification therefore determines the obligation, the viability position and the weight given to housing land supply arguments.
What care evidence does a council expect?
The minimum care package per resident in hours per week and how it is guaranteed, the staffing establishment by role and shift including overnight cover, the care provider and its registration status, the eligibility criteria and assessment process, and what happens when a resident's needs exceed what the scheme provides.
Can affordable housing be delivered in an extra care scheme?
Yes, but the mechanism needs working out early, because a registered provider taking units also takes on the service charge and care obligations. The routes used are transfer to a provider operating the same model, a commuted payment where policy allows it, or a viability case with a late-stage review secured in the obligation.
What should the section 106 cover?
A definition of the use and the facilities to be retained, an occupancy restriction by age and assessed need, an obligation to provide a stated minimum care package, a requirement that care is delivered by a registered provider, any affordable provision, and a step-in or re-provision mechanism if the operator fails.