Finding the local validation checklist for an authority
Every English authority publishes a local list of information requirements alongside the national list in the Development Management Procedure Order. Here is where to find it, how to date it and how to argue with it.
The local validation checklist is the document that decides whether your application is registered on the day it arrives or three weeks later. Every authority in England publishes one, most call it the local list or local information requirements, and it sits alongside the national list set by the Town and Country Planning (Development Management Procedure) (England) Order 2015. Find it, date it, and read the triggers rather than the document titles.
Most invalidations come down to something the applicant could have predicted from that one PDF.
What the national list requires
Article 7 of the Development Management Procedure Order sets the national requirements. In outline these are the completed application form, the correct certificate of ownership and any agricultural holdings certificate, a location plan and site plan identifying the land, the ownership and notice particulars, the fee, and a Design and Access Statement where the development is of a type that needs one.
These apply everywhere. An authority cannot waive them, and it cannot add to them except through a published local list. If a validation officer asks for something and cannot point you to either the Order or a published local requirement, the request has no footing.
What a local list may add
The Order allows an authority to require other particulars or evidence, provided the requirement is published, and provided it is reasonable having regard to the nature and scale of the proposed development and relates to a matter that is a material planning consideration.
Those two qualifications carry real weight. A requirement for a full Transport Assessment on a single dwelling is not reasonable having regard to scale. A requirement for a document about a matter the authority cannot take into account in its decision is not a material consideration. Both are arguable, and validation teams generally back down when the argument is made in writing with the wording of the Order quoted.
Typical local list items are an ecology or preliminary ecological appraisal where habitat is present, a Flood Risk Assessment in the higher flood zones or above a site area threshold, a Heritage Statement where designated assets are affected, a tree survey where trees fall within influencing distance, a contaminated land screening on former industrial land, parking and cycle storage details, refuse strategy, drainage details, a biodiversity net gain statement and metric output, and an air quality assessment inside a management area.
Where the local list is published
Start on the authority's own website. Search for the authority name with the words local validation list or local information requirements. It is almost always a PDF under the planning applications section, sometimes under a heading about making a valid application.
If that fails, three fallbacks work. The Planning Portal holds local requirements for each authority alongside the national ones as part of the submission process. Many authorities attach the local list to their pre-application response, so ask for it by name when you book pre-application advice. And a handful publish it inside a supplementary planning document on development management procedure rather than as a standalone file, which is why a site search on the council domain beats the navigation menu.
For the datasets that sit behind several of the triggers, the national planning data service is the quicker route to the underlying designations, and it will tell you whether your site touches a conservation area, an Article 4 direction area or a flood zone before you open the checklist.
The two year rule and why it matters
A local requirement does not bind an application if it was published more than two years before the date of the application. That is a statutory limit on how stale a local list can be, and it is the most useful sentence in the whole of the Order for an agent under time pressure.
So check the publication date on the front of the document, and check whether the authority has since adopted a revised version. If the only published list is three years old, a requirement that appears solely on that list is not enforceable, and a short covering note saying so usually resolves it. Do not overplay it. The national list still applies, and an authority that has let its list lapse can still refuse permission for want of information later.
Reading the triggers rather than the titles
A local list is a table of documents against circumstances. The document title tells you almost nothing; the trigger column tells you everything. Work down the trigger column with your site constraints in one hand.
| Trigger to check | What it usually pulls in |
|---|---|
| Site area at or above a stated threshold | Flood risk assessment, drainage details, ecology survey |
| Any part of the site in Flood Zone 2 or 3 | Flood risk assessment and, where applicable, a sequential test |
| Development affecting a listed building or in a conservation area | Heritage statement, existing and proposed elevations at a stated scale |
| Trees on or adjacent to the site | Tree survey and arboricultural method statement to BS 5837:2012 |
| Former industrial or landfill use | Phase 1 desk study, with Phase 2 where the desk study recommends it |
| Residential development above a unit threshold | Affordable housing statement, open space contribution details |
| Any development subject to the biodiversity gain condition | Statutory metric output and a pre-development habitat plan |
Note: several triggers depend on data the authority holds rather than data you can see on site, such as the extent of an archaeological priority area or a critical drainage area. Ask the validation team for a constraints search on the site address before you commission anything.
Disputing a requirement without losing the programme
Push back in writing, on the day, and keep applying pressure rather than waiting. Set out the requirement, quote the Order's reasonableness test, state the nature and scale of the development, and say why the requirement does not meet the test. Attach the published local list page you are relying on, with its date.
If the authority holds its position, you have a commercial decision rather than a legal one. Producing a short document you think is unnecessary usually costs less than a three week standstill. Reserve the argument for requirements that would cost thousands or that depend on a survey season you cannot reach, because those are the ones where standing your ground actually pays.
Illustrative example: an authority asked for a full ecological appraisal on a garden infill plot with no habitat beyond amenity grassland and a fence line. The agent sent a dated photograph schedule, a preliminary walkover note from a qualified ecologist running to two pages, and the reasonableness argument. The application was validated four days later without the full appraisal.
Building validation into the submission programme
Work backwards from the target validation date. Identify every local list item that depends on a season or a third party, because those set the critical path. Bat emergence surveys run between May and September. Statutory undertaker records take weeks, and our note on ordering sewer records through a pre-development enquiry explains the lead time. The biodiversity metric has version control implications that catch out schemes drafted across a release, covered in downloading the biodiversity metric and version control.
Then record what you worked to. Save the local list PDF into the project file with its publication date in the filename, note the date you downloaded it, and keep the constraints search. If the authority changes its list mid-project, you can show which version applied when you submitted, and if a validation dispute arises months later the file answers it in one email.
Enter your postcode on PlanScope to see which supporting documents a site's constraints are likely to trigger before you open the local list.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
How long does a local validation list stay valid?
A local requirement does not apply to an application if it was published more than two years before the date of that application. Check the publication date on the front of the document and look for a revised version. Where the only published list has lapsed, a requirement appearing solely on that list is not enforceable against your submission.
Can an authority refuse to validate an application over a local list item?
It can, provided the requirement is published, reasonable having regard to the nature and scale of the development, and relates to a material planning consideration. If any of those three fails, say so in writing and quote the Development Management Procedure Order. Validation teams often reconsider once the test is set out explicitly.
What is on the national list?
The completed form, the correct ownership certificate and any agricultural holdings certificate, a location plan and site plan identifying the land, the notice particulars, the fee, and a Design and Access Statement where the development type requires one. These apply in every authority and cannot be waived or added to except through a published local list.
Where do councils publish their local list?
Usually as a PDF under the planning applications section of their website, titled local validation list or local information requirements. The Planning Portal also carries local requirements per authority during submission, and many councils attach the list to a pre-application response. A site search on the council domain beats the navigation menu.
Should I argue or just produce the document?
Produce it when it is quick and inexpensive, because a three week standstill usually costs more than a short report. Argue when the requirement would cost thousands, or when it depends on a survey season you cannot reach within the programme. Put the argument in writing on the day rather than waiting for a validation decision.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.