Fire service access and water supply in a fire statement

8 min readBy PlanScope Editorial Team

Appliance routes, standing positions and hydrants set hard dimensions at planning stage. Leaving them to the fire engineer after submission usually means moving a building.

Fire service access and water supply are the two parts of a Planning Gateway One fire statement that change the drawings. Most of the statement describes design intent that will be worked up later. These two sections set hard dimensions: a road wide enough and strong enough for an appliance, a hardstanding close enough to the dry riser inlet, and hydrants within reach of the entry points. Architects who leave them to the fire engineer after planning submission usually end up moving a building.

Gateway One applies to relevant buildings, broadly those of 18 metres or more in height or seven or more storeys containing two or more dwellings or educational accommodation, through Article 9A of the Development Management Procedure Order 2015.

Why access and water supply appear at planning stage

The point of Gateway One is to put fire safety into the planning decision rather than discovering it at building control. The statement is submitted on the form published by the Secretary of State, and the Building Safety Regulator within the Health and Safety Executive is a statutory consultee on the application.

Access and water supply are in scope because they are planning matters in substance. An appliance route is a road, a hardstanding is a surfaced area, and a hydrant is a piece of infrastructure in the public highway or on the site. All three compete with landscape, parking, servicing, drainage and the position of the building, and none of them can be resolved by a later technical submission if the layout has already been fixed.

A Fire Statement is a report type where a professional with the necessary fire engineering competence is required rather than merely advisable. The drafting can be structured in advance, and the content has to come from that professional.

Appliance access routes and hardstanding

Approved Document B sets out access and facilities for the fire service, and the numbers that drive layout are the vehicle dimensions and the loading.

The figures most often quoted from the Approved Document for a pumping appliance are a minimum road width between kerbs of 3.7 metres, a minimum gateway width of 3.1 metres, a minimum clearance height of 3.7 metres, and a minimum carrying capacity of 12.5 tonnes. A high reach appliance needs a greater clearance height, a much larger turning circle and a higher carrying capacity. Take the current figures from the current edition of the Approved Document, because they are the ones the regulator and building control will apply.

Design element What the layout has to provide
Access road Width, clearance height and turning provision for the relevant appliance
Structural capacity Carrying capacity for the appliance over any podium, basement or vaulted structure
Hardstanding A standing position for the appliance within the required distance of the inlet or entry point
Gateways and bollards Clear width maintained, with any gate openable by the fire service
Turning A turning head or a through route, sized for the appliance rather than for a refuse vehicle

The carrying capacity requirement is the one that catches schemes out. A courtyard over a basement car park, a podium deck or a landscaped area over a vaulted service route has to be designed for appliance loading if an appliance has to stand there. That is a structural decision with a cost, and it has to be made at the same time as the layout rather than afterwards.

Turning provision is the second trap. A turning head designed for the local authority refuse vehicle will not necessarily take a high reach appliance, and the two vehicles have different turning circles. Draw both.

Distances to entry points and dry riser inlets

Two distance rules do most of the work, and which one applies depends on whether the building has fire mains.

Where the building is fitted with fire mains, the appliance standing position has to be close to each inlet connection, with the Approved Document setting a maximum distance measured from the appliance to the inlet, and the inlet should be visible from the standing position. Where the building has no fire mains, access is required to within a stated distance of all points inside each dwelling, measured along a route the firefighters would take.

Buildings with a floor more than 18 metres above fire service access level need rising mains, which become wet rather than dry above a greater height. Firefighting shafts are required where the top storey exceeds the stated height above access level, or where a basement is deeper than the stated depth, and a shaft takes floor area from every storey it passes through.

That last point is the one to resolve before the planning layout is fixed. A firefighting shaft containing a firefighting lift, a protected stair and a lobby is a substantial core element, and discovering at Gateway Two that one is needed in a position the planning drawings do not allow for is an expensive conversation.

So locate the inlets early, mark the appliance standing position on the site plan, and dimension the distance between them on the drawing rather than asserting compliance in text.

Hydrant provision and who confirms it

Water supply for firefighting is a separate question from the building's internal systems.

The Approved Document addresses hydrant provision for buildings above a stated floor area, with hydrants required within a given distance of an entry point to the building and spaced no further than a stated distance apart. Where the mains supply cannot deliver the required flow, the alternative is a dedicated static supply, and the Approved Document gives a minimum capacity for a charged static water tank.

Three parties are involved and each has a different role.

The water undertaker holds the information about main sizes, pressures and available flow, and installs hydrants. The fire and rescue authority requires hydrants under its own statutory powers and will say what it needs. The developer pays for the installation and for any reinforcement of the main.

Ask the water company for a flow and pressure test or a hydraulic assessment early, because the answer sometimes requires a main to be upsized along a length of road, which is a programme and cost item with its own highway consents. A Utilities Assessment is the place to record the supply position alongside the other services, and where a new main is needed the adoption and maintenance questions arise in the same way as they do for maintenance and adoption in a drainage strategy.

Where the site has no adequate mains and a static supply is proposed, that tank has to go somewhere accessible to an appliance, and it is not a small object.

What the access requirement does to the site layout

Five consequences recur across schemes, and recognising them early saves redesign.

  1. The appliance route usually has to run along a facade rather than stopping at an entrance, which conflicts with planting, SuDS features and cycle stores.
  2. Tree planting cannot overhang the route below the clearance height, which pushes street trees away from the building and changes the landscape proposals.
  3. Gated or bollarded access needs a fire service opening arrangement, which affects the public character of a courtyard that was designed to feel enclosed.
  4. The standing position needs a surface finish that takes appliance loading, so a decorative paved courtyard becomes a structural element.
  5. Where a single access serves a long block, the distances to each inlet may require a second access point, which can mean losing a plot or a car parking area.

Draw the appliance route and the standing positions on the planning layout, with dimensions. An application that shows them is easier to support than one that promises them, and a committee report can reproduce a dimensioned plan.

Evidence to include and who prepares it

The submission should contain the fire statement on the published form, a fire service access plan, and enough supporting detail for the regulator to see the strategy.

What makes the package work:

  • A site plan showing appliance routes, standing positions, gateway widths, turning provision and the distances to inlets and entry points
  • A statement of the appliance types assumed, with the dimensions and loadings used
  • The structural loading position over any podium, basement or vault on the route
  • The water supply position, with the mains capacity, hydrant locations and any static supply
  • The rising main and firefighting shaft arrangement, where applicable
  • A statement of the author's fire engineering competence

The competence statement is not a formality. Gateway One is built on the premise that the fire strategy has been prepared by someone qualified to prepare it, and a statement completed by a design team member without fire engineering competence is the single most common reason the regulator asks for more. A Fire Safety Strategy under BS 9991 or BS 9999 is a fire engineering document in its own right, and the two documents should be consistent with each other.

Where a draft has been produced in-house, the professional directory is the route for a fire engineer to review and sign it before submission.

Where the regulator raises an objection

Responses from the Building Safety Regulator tend to focus on gaps rather than on disagreement with a strategy.

The recurring points are an absent or inadequate access plan, distances asserted but not dimensioned, no information on structural capacity where an appliance has to stand over a structure, no water supply information, and a statement that does not demonstrate who prepared it and on what basis.

Each of those is fixable before submission at a fraction of the cost of fixing it afterwards. Fire service access is a layout constraint, so treat it as one from the first sketch and commission the fire engineer at the same time as the structural engineer.

Browse the PlanScope report types to see which fire and structural documents a relevant building needs at planning stage.

For specialist technical reports, qualified professional input may be required. A fire statement at Planning Gateway One must be prepared by someone with the necessary fire engineering competence. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Which buildings need a fire statement at planning stage?

Relevant buildings under Article 9A of the Development Management Procedure Order 2015, broadly those 18 metres or more in height or of seven or more storeys containing two or more dwellings or educational accommodation. The statement goes in on the form published by the Secretary of State, and the Building Safety Regulator is a statutory consultee.

What road width does a fire appliance need?

Approved Document B sets the dimensions, and the figures commonly applied for a pumping appliance are a minimum road width between kerbs of 3.7 metres, a gateway width of 3.1 metres, a clearance height of 3.7 metres and a carrying capacity of 12.5 tonnes. A high reach appliance needs greater height, turning circle and capacity. Use the current edition.

Does a courtyard over a basement need structural design for appliances?

Yes, where an appliance has to stand on it. A podium deck, a landscaped courtyard over a car park or a vaulted service route on the access route has to carry the appliance loading. That is a structural decision with a cost, and it has to be taken at the same time as the layout rather than afterwards.

Who provides fire hydrants?

Three parties are involved. The water undertaker holds the information on main sizes, pressures and available flow and installs the hydrants. The fire and rescue authority requires them under its own statutory powers and states what it needs. The developer pays for installation and for any reinforcement of the main.

What if the mains cannot deliver enough water?

Approved Document B allows a dedicated static supply, and gives a minimum capacity for a charged static water tank. That tank has to sit somewhere an appliance can reach and it is not a small object. Ask the water company for a flow and pressure assessment early, because upsizing a main has its own cost, programme and highway consents.

Who can prepare the fire statement?

Someone with the necessary fire engineering competence, and the statement should say who prepared it and on what basis. A statement completed by a design team member without that competence is the most common reason the Building Safety Regulator asks for further information at Gateway One.

Sources and further reading

fire statementgateway onebuilding safety actfire service accesshydrantsarchitects

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

The sensitivity and magnitude matrix in an LVIA

GLVIA3 supplies a method, not a matrix. How value and susceptibility combine, what magnitude actually contains, and how to report year 1 and year 15 residual effects defensibly.

Read article →
Report Deep Dives7 min read

The ground gas assessment section of a Phase 2 report

Monitoring in settled weather, flow readings at the resolution limit and a characteristic situation with no source behind it are the three failures reviewers see most. What a defensible ground gas section contains.

Read article →
Report Deep Dives7 min read

The background sound survey in a Noise Impact Assessment

The LA90 background sets everything else in a BS 4142 rating. Measurement positions, representative periods, calibration records and the uncertainty a reviewer will look for.

Read article →
Report Deep Dives7 min read

The scope and modules of a Whole Life Carbon Assessment

Upfront, embodied and whole life carbon are three different figures from different module sets. The scope errors that get assessments rejected, and the assumptions that move the result.

Read article →
Report Deep Dives6 min read

The carbon offset and monitoring sections of an Energy Statement

Offsetting deals with what is left after fabric, plant and renewables. The residual calculation, the obligation drafting, the metering strategy and who reports once units are sold.

Read article →
Report Deep Dives6 min read

The sustainable transport section of a Transport Assessment

Trip generation is arithmetic, accessibility is judgement. Isochrones instead of circles, LTN 1/20 route quality, honest bus evidence and measures that can actually be secured.

Read article →