Report Deep Dives

Fire Statement or Fire Safety Strategy: which one you need

7 min readBy PlanScope Editorial Team

One is a planning form, the other a fire engineering document, and they sit at different gateways. Here is the Article 9A trigger, what each document contains, and the validation failures to avoid.

A Fire Statement is a planning document. A Fire Safety Strategy is a fire engineering document. They arrive at different points in the consent sequence, they are read by different regulators, and submitting one where the other is required is a validation failure rather than a helpful extra.

The short version: if your scheme is a relevant building, you need a Fire Statement on the published form with the planning application. The fire safety strategy comes later, for the building control route, unless the council has asked for one as supporting information.

Where each document sits in the sequence

Planning Gateway One is the first of the three gateways introduced under the building safety framework. It sits at the planning application stage and its purpose is to make sure fire safety has shaped the design before the layout is fixed, rather than being resolved afterwards by adding sprinklers and hoping.

Article 9A of the Town and Country Planning (Development Management Procedure) (England) Order 2015 is the provision that requires the Fire Statement, and it took effect on 1 August 2021. The Health and Safety Executive, acting as the Building Safety Regulator, is a statutory consultee on those applications and comments on the fire statement.

Gateway Two comes before construction begins and is where the Building Safety Regulator approves the detailed design for higher-risk buildings. Gateway Three is at completion. A fire safety strategy prepared to the relevant British Standard is the document that carries the technical case through those later stages and supports compliance with the fire requirements of the Building Regulations.

So the two documents are sequential, not alternatives. One informs the planning decision. The other informs the construction approval.

Relevant buildings and the Article 9A trigger

The requirement bites on a relevant building, which in broad terms means a building containing two or more dwellings, or educational accommodation, and which either contains seven or more storeys or is 18 metres or more in height.

Two points catch architects out.

Height and storey count are alternatives, not cumulative. A building of seven storeys that measures under 18 metres is caught. So is a five-storey building that reaches 18 metres because of tall floor-to-floor dimensions or a sloping site.

And the trigger applies to development of a relevant building, which includes works to an existing building that would create or alter one, not only new construction. A rooftop extension taking an existing block from six storeys to seven brings the scheme into scope.

Where the scheme sits just under a threshold, say so explicitly in the planning statement with the measured height and the storey count, and state the datum used. Validation officers check this, and an application that is silent on it invites a query.

What the Fire Statement asks for

The Fire Statement is completed on the form published by the Secretary of State, and it is a planning-level document about the matters planning can influence. It asks about the principles of the fire safety design as they affect the layout and the site, including:

  • the siting of the building and its relationship to neighbouring structures
  • access and hardstanding for fire service vehicles, including turning and setting-down
  • water supplies for firefighting and their location
  • means of escape strategy in outline, including the evacuation approach
  • the principles of external wall construction and any features affecting fire spread
  • the arrangement of any car parking, refuse and plant that could affect fire spread or access
  • how the design responds to the site constraints, such as a narrow frontage or a restricted access route

It also asks who prepared it and on what basis of competence. That question is not decorative.

What the form does not ask for is compartmentation detail, smoke control calculations, sprinkler design or fire resistance periods. Those belong in the strategy, and stuffing them into the planning submission does not improve it.

What a fire safety strategy contains instead

A strategy prepared to the residential or the general British Standard sets out the fire engineering case for the building. It covers the fire strategy diagram floor by floor, compartmentation and fire resistance periods, means of escape with travel distances and stair capacity, the evacuation strategy, smoke control, detection and alarm, suppression, firefighting shafts and facilities, external fire spread and facade design, and the management assumptions on which all of it depends.

It is a live document. It develops from concept through detailed design, and it is the reference point for the Building Safety Regulator, the building control body and, eventually, the responsible person under the fire safety regime once the building is occupied.

Illustrative example: a seven-storey residential block

Take a proposed block of 34 flats over seven storeys, measured at 17.4 metres to the top storey floor level. This example is illustrative.

The height is under 18 metres, but the storey count is seven, so it is a relevant building and Article 9A applies. A Fire Statement on the published form goes in with the application, the Health and Safety Executive is consulted, and the planning submission has to demonstrate that fire service access, water supplies and the escape principle work on this constrained site.

The design consequences show up early. If the only vehicular access is a 3.5 metre wide route with a tight turn, the layout may need reworking before the planning drawings are fixed. If the scheme relies on a single stair, the escape strategy has to be explained at the planning stage rather than deferred.

The strategy document then develops that outline into the technical case for Gateway Two, and it will be a substantially longer document dealing with matters the planning authority never sees.

Competence: who may author each

Both documents require fire engineering competence, and neither is a form-filling exercise.

The Fire Statement asks the author to state their competence, and the expectation is someone with fire engineering knowledge appropriate to the building, not the project architect completing a form. A strategy to the relevant British Standard is unambiguously a fire engineering document and should be authored by a suitably qualified fire engineer.

This matters legally as well as practically. A Fire Statement is a report type where a competent professional is required rather than merely advisable, under the building safety framework and Article 9A. PlanScope can draft the structure, the policy framing and the planning-level content, and flags where information is missing rather than inventing it, but the document is a starting point for the fire engineer who signs it, not a substitute for one. For specialist technical reports, qualified professional input may be required.

Validation failures caused by the wrong document

Four recur.

Submitting a fire strategy instead of the Fire Statement. The strategy may be excellent and the application will still be invalid, because Article 9A requires the specified form.

Using an old version of the form, or a consultant's own template that reproduces the headings. Download the current published form.

Leaving the competence declaration blank or naming a practice rather than a person.

Failing to address the site-level questions at all, because the author has written a building-level document. Fire service access, water supplies and siting are the planning questions, and an answer that says these will be addressed at Gateway Two misses the point of Gateway One.

Where the scheme is close to a threshold or the building type is unusual, ask the council at pre-application stage whether a statement is required and put the answer in writing. Alongside it, the design and access statement should explain how the fire strategy shaped the layout, since that is the evidence that Gateway One has done its job.

This is general guidance, not legal advice. Check the position with your local planning authority, the Building Safety Regulator or a qualified professional before relying on it.

Browse the 66 PlanScope report types to see how the fire documents sit alongside the rest of a major application pack. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is a relevant building for the Article 9A fire statement?

In broad terms, a building containing two or more dwellings or educational accommodation, which either contains seven or more storeys or is 18 metres or more in height. Height and storey count are alternatives rather than cumulative, so a seven-storey building under 18 metres is caught, as is a five-storey building reaching 18 metres.

What does the Fire Statement form cover?

Planning-level matters: the siting of the building relative to neighbours, fire service vehicle access and hardstanding, water supplies for firefighting, the outline means of escape and evacuation approach, the principles of external wall construction, and the arrangement of parking, refuse and plant. It also asks who prepared it and on what basis of competence.

Is a fire safety strategy the same as a fire statement?

No. A strategy prepared to the relevant British Standard is a fire engineering document covering compartmentation, fire resistance periods, travel distances, stair capacity, smoke control, detection, suppression and firefighting facilities. It supports Gateway Two and building control, and it cannot be substituted for the Article 9A form at planning stage.

Who consults the Building Safety Regulator on a planning application?

The local planning authority does. The Health and Safety Executive, acting as the Building Safety Regulator, is a statutory consultee on applications for relevant buildings and comments on the Fire Statement. That consultation is Planning Gateway One, the first of three gateways in the building safety framework.

Who is competent to write a fire statement?

Someone with fire engineering knowledge appropriate to the building. The form requires the author to state their competence, and naming a practice rather than a person is a common validation failure. A strategy to the relevant British Standard should be authored by a suitably qualified fire engineer.

Sources and further reading

fire statementgateway onebuilding safetyfire safety strategyreport deep dives

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

The sensitivity and magnitude matrix in an LVIA

GLVIA3 supplies a method, not a matrix. How value and susceptibility combine, what magnitude actually contains, and how to report year 1 and year 15 residual effects defensibly.

Read article →
Report Deep Dives7 min read

The ground gas assessment section of a Phase 2 report

Monitoring in settled weather, flow readings at the resolution limit and a characteristic situation with no source behind it are the three failures reviewers see most. What a defensible ground gas section contains.

Read article →
Report Deep Dives7 min read

The background sound survey in a Noise Impact Assessment

The LA90 background sets everything else in a BS 4142 rating. Measurement positions, representative periods, calibration records and the uncertainty a reviewer will look for.

Read article →
Report Deep Dives7 min read

The scope and modules of a Whole Life Carbon Assessment

Upfront, embodied and whole life carbon are three different figures from different module sets. The scope errors that get assessments rejected, and the assumptions that move the result.

Read article →
Report Deep Dives6 min read

The carbon offset and monitoring sections of an Energy Statement

Offsetting deals with what is left after fabric, plant and renewables. The residual calculation, the obligation drafting, the metering strategy and who reports once units are sold.

Read article →
Report Deep Dives6 min read

The sustainable transport section of a Transport Assessment

Trip generation is arithmetic, accessibility is judgement. Isochrones instead of circles, LTN 1/20 route quality, honest bus evidence and measures that can actually be secured.

Read article →