Permitted Development

Flats and permitted development: what is and is not available

6 min readBy PlanScope Editorial Team

The Order defines a dwellinghouse so as to exclude flats, which removes every Part 1 householder right. A few other classes still apply, and leasehold consent runs on its own track.

Flats permitted development rights are far narrower than most owners expect, and the reason is a single definition. The General Permitted Development Order 2015 defines a dwellinghouse so that it does not include a building containing one or more flats, or a flat contained within such a building. Schedule 2 Part 1, which carries all the familiar householder rights for extensions, outbuildings, roof alterations and porches, applies only to dwellinghouses. So none of it is available to a flat or to the building that contains it.

That is the whole answer to most questions on this subject. What is left is working out which other parts of the Order still apply, and what to do where none does.

Why Part 1 does not apply

Part 1 is headed development within the curtilage of a dwellinghouse. Every class in it, from Class A rear and side extensions through to Class H satellite dishes, is drafted around that word. The 4 m and 3 m rear extension depths, the 50 per cent curtilage rule for outbuildings, the roof volume allowances: all of them are dwellinghouse rights.

A ground floor flat with its own front door, its own garden and no shared parts is still a flat, because the building contains more than one dwelling. Ownership makes no difference. Freehold ownership of a converted flat does not convert it into a dwellinghouse for the purposes of the Order.

Where the curtilage question arises for a house rather than a flat, the 50 per cent curtilage rule for garden outbuildings sets out how that allowance is measured.

The definition in the Order, read carefully

The interpretation provision excludes a building containing one or more flats and a flat within such a building. It does not exclude a building that merely has a flat somewhere nearby, and it does not exclude a house with an annexe that remains part of the same planning unit.

Two practical consequences follow. A house that has been divided into two self-contained flats loses Part 1 rights for both units from the moment the division is lawfully made. And a house with a lawful self-contained annexe may or may not have lost them, depending on whether the annexe is a separate dwelling or remains ancillary, which is a question of fact and degree rather than of labels.

A lawful development certificate is the only formal way to confirm that works or a use are lawful, and on this particular question it is money well spent before anyone starts building.

Maisonettes and converted houses

Maisonettes are flats. The arrangement over two floors, with its own street door and its own stair, feels like a house and is not one, because the building contains more than one dwelling.

Converted Victorian and Edwardian houses are where most disputes arise. An upper flat owner who wants a rear dormer, a lower flat owner who wants a conservatory, and a freeholder who owns the structure all discover the same thing at once. Each of those works needs planning permission, and each also needs the agreement of whoever owns the relevant part of the building.

What rights do apply

Part and class What it allows Applies to flats
Part 2 Class A Gates, fences, walls and other means of enclosure within height limits Yes, subject to the usual limits
Part 2 Class C Painting the exterior of a building Yes, other than as an advertisement
Part 14 Class A and B Solar equipment on or within the curtilage of a block of flats Yes, expressly
Part 14 Class G Air source heat pumps at a block of flats Yes, within the stated limits
Part 20 Class A Additional storeys on a detached block of flats, by prior approval Yes, with detailed conditions
Part 3 Class MA Commercial premises to dwellings, by prior approval Creates flats rather than applying to them

Each of those classes has its own limitations, conditions and exclusions, including on designated land, and several require prior approval rather than being automatic. Read the class text rather than a summary, including the conditions at the end of each class, which is where most of the traps sit.

The commercial to residential route is the one landlords ask about most, and the vacancy and continuous use conditions under Class MA are the gateway test for it.

Communal areas, ownership and who may apply

Anyone may apply for planning permission on land they do not own. What they must do is serve notice on the owner and complete the correct ownership certificate with the application under the Development Management Procedure Order 2015.

For a flat that means identifying who owns the roof, the external walls, the forecourt and the rear garden. In a converted house the lease often demises the rear garden to the ground floor flat and leaves the roof with the freeholder. Get the title plans before drafting the certificate, because an incorrect certificate can invalidate a permission.

A Planning Statement should set out the ownership position plainly where the works affect communal parts, since the case officer will otherwise raise it as a validation query.

Planning permission does not override the lease. Most residential leases require the landlord's written consent for alterations, and many prohibit structural alterations outright. Consent for improvements is subject to statutory controls on unreasonable refusal in some circumstances, but the starting point is the lease itself.

Treat the two tracks as parallel. Obtaining permission for a loft conversion in a converted house, and only then discovering that the roof space is not demised to the flat, is a common and expensive sequence.

Rooflights, windows and cladding

Works affecting only the interior of a building, or which do not materially affect its external appearance, are not development at all under the 1990 Act. A like-for-like window replacement in matching materials usually falls within that, and an internal reconfiguration almost always does.

A new rooflight, a new window opening, a change of window material that reads differently from the street, external cladding or insulation, and a replacement front door of a different design all materially affect external appearance and so need permission. In a conservation area the threshold for what reads as material is lower, and Article 4 directions may remove rights that would otherwise exist.

Routes where no right exists

Three options, in order of cost. A prior approval application where the works fall within Part 20 or Part 3 and the conditions are met. A full planning application, which for a single flat extension is a householder-scale exercise in all but name and fee. Or a lawful development certificate where you believe the works are not development at all.

Support a full application with drawings that show the whole building rather than just your flat, a Design and Access Statement where the authority's validation list requires one, and evidence that neighbouring flats have been considered on daylight and overlooking. And start the leasehold consent conversation on the same day you start the planning one, because that is the track that usually runs longest.

To see which documents your application needs, enter your postcode on PlanScope.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can a ground floor flat with its own garden use permitted development?

No. The General Permitted Development Order 2015 defines a dwellinghouse so as to exclude a building containing one or more flats and any flat within such a building, and Schedule 2 Part 1 applies only to dwellinghouses. Having a private garden, a separate front door and no shared parts makes no difference to that definition.

Are maisonettes treated as houses?

No. A maisonette is a flat, even where it occupies two floors and has its own street door and internal stair, because the building it sits in contains more than one dwelling. The Part 1 rights for extensions, outbuildings, roof alterations and porches are unavailable, and any external works need planning permission.

Which permitted development rights do apply to a block of flats?

Means of enclosure and exterior painting under Part 2, solar equipment and air source heat pumps under Part 14, and additional storeys on a detached block under Part 20 by prior approval. Each has its own limits, conditions and exclusions on designated land, so read the class text in full rather than relying on a summary.

Do I need the freeholder's permission as well as planning permission?

Usually yes, and they are separate. Planning permission does not override the lease, and most residential leases require written landlord consent for alterations with some prohibiting structural work entirely. You must also serve notice on the owner and complete the correct ownership certificate with the planning application itself.

Does replacing windows in a flat need permission?

A like-for-like replacement in matching materials usually does not, because works that do not materially affect external appearance are not development. A different material, a changed opening pattern or a new opening does need permission, and in a conservation area the threshold for what counts as material is lower.

Sources and further reading

flatspermitted developmentgpdomaisonetteleaseholdprior approval

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development6 min read

The three year deadline on a prior approval

A planning permission must be begun within three years. A Part 3 prior approval must be completed within three years of the prior approval date, and the condition sits in the Order where nobody can vary it.

Read article →
Permitted Development7 min read

Class M: betting shops and takeaways to homes

Class M turns a small shop, betting office or hot food takeaway into a dwellinghouse through prior approval. The 150 m2 floorspace cap and the 20 March 2013 qualifying use date decide most cases before design begins.

Read article →
Permitted Development8 min read

Class L and moving between C3 and C4 use

Class L permits a dwellinghouse to become a small house in multiple occupation and back again, with no application. The limits are the household test, the six-resident ceiling and the Article 4 directions that withdraw the right.

Read article →
Permitted Development8 min read

Industrial and warehouse extensions under Part 7

Part 7 Class H lets an occupier extend an industrial building or warehouse without an application, within limits that are tighter than they look. This covers the allowance, the boundary condition and the new process restriction.

Read article →
Permitted Development7 min read

Bat roosts and roof works under permitted development

A re-roof or loft conversion needs no planning application, so nothing prompts an ecology check. This sets out when to commission a roost assessment, the survey seasons that control the programme, and who is liable.

Read article →
Permitted Development7 min read

Protected trees and permitted development on the same site

Permitted development grants planning permission for the building work, not consent to touch a protected tree. This covers the consent routes, the root protection trap in foundation design, and how to sequence the two.

Read article →