Funeral directors: use class and town centre frontage

7 min readBy PlanScope Editorial Team

The 2020 Use Classes amendment left funeral directors ambiguous. Here is how to settle the class and answer a protected shopping frontage objection.

A funeral home change of use planning application turns on two questions, and the first one is unsettled. Before September 2020 the Use Classes Order expressly included premises used "for the direction of funerals" within Class A1. That wording did not carry across into Class E when the Order was amended, so whether a funeral director's premises now falls within Class E as a service provided principally to visiting members of the public, or sits outside the classes altogether, is a question councils answer differently.

The second question is easier to predict. In a protected shopping frontage, the objection will be that a funeral director's window is a dead frontage, and that argument has to be met with design and with evidence.

The use class question, honestly stated

Class E includes the provision of financial services, professional services other than health or medical services, and any other services which it is appropriate to provide in a commercial, business or service locality, in each case principally to visiting members of the public. A funeral director's reception and arrangement rooms fit that description comfortably.

The complication is the back of house. Where the premises include a mortuary with refrigerated body storage and a preparation room, some authorities treat the composite use as falling outside Class E, so that a change from a shop or an office requires planning permission as a sui generis use. Others treat the whole as Class E and take the view that no permission is needed for the change itself, while still requiring permission for the plant, the extraction and any external alterations.

Do not guess. Three practical routes exist:

  1. Ask the local planning authority through its pre-application service, in writing, and keep the answer.
  2. Apply for a certificate of lawfulness of proposed use or development under section 192 of the Town and Country Planning Act 1990, which gives a formal answer on whether permission is needed for the proposal described.
  3. Apply for planning permission for the change of use in any event, which costs more and takes longer, but removes the risk entirely and allows the frontage and plant issues to be resolved in one decision.

Where the unit is in a conservation area or the building is listed, or an Article 4 direction has removed permitted change rights, the analysis changes again, so check those first. The lawful use of the unit also matters: an office in Class E(g) and a shop in Class E(a) are in the same class now, but the planning history may record conditions restricting the use, and a condition survives the reclassification.

Town centre frontage policy and active uses

Most adopted local plans designate primary shopping frontages or primary shopping areas, with policies resisting uses that harm the vitality and viability of the centre or that create inactive frontages. Funeral directors attract that objection because the window is usually screened, the premises are closed in the evening and there is no passing trade.

The answer is partly design and partly evidence. On design, keep a glazed shopfront with an internal display or a lit, dressed window rather than vinyl film or a blind, keep the entrance on the street, light the frontage at night, and keep the fascia proportionate to the original shopfront. On evidence, set out the position of the unit within the frontage, the number of vacant units nearby, the proportion of the frontage already in non-retail use and how long the unit has been vacant with marketing evidence.

Two further arguments carry weight. A funeral director is a service the local community uses, often the only one within walking distance for an ageing population, which engages the social role of the planning system. And the premises generate daytime footfall from arrangement appointments, which is more than a vacant unit does.

A Planning Statement should carry all of this, with the frontage policy quoted and answered point by point rather than summarised.

Mortuary facilities, refrigeration and drainage

This is the part of the application most applicants under-describe, and under-description invites conditions you do not want.

Set out the layout: the arrangement room, the chapel of rest, the preparation room, the refrigerated store with its capacity, the vehicle access for removals, and the storage of coffins. Then deal with the services. Refrigeration plant needs a location, a condenser position and an acoustic specification. The preparation room needs mechanical ventilation with a discharge point, and a specification for the drainage of the preparation room, including any trapped and screened gullies.

Trade effluent is a separate consent. A discharge from a preparation room requires consent from the sewerage undertaker under section 118 of the Water Industry Act 1991, and the undertaker's requirements on pre-treatment and on disinfectants will shape the room specification. Clinical and hazardous waste is controlled under the duty of care in the Environmental Protection Act 1990 and the hazardous waste regime, so name the storage arrangement and the licensed carrier in the application.

A Ventilation and Extraction Statement covering the preparation room extract and the refrigeration plant together is the document the environmental health officer will want, with the discharge point shown on an elevation rather than described in text.

Noise from plant and from vehicle movements

Refrigeration runs continuously, which makes it a night time noise source assessed under BS 4142:2014+A1:2019 against the measured background at the nearest residential facade, with corrections for tonality. On a high street with flats above and behind, that background can be low after midnight, so the plant specification often has to be better than the catalogue default.

Expect to propose an acoustic enclosure or housing, anti-vibration mounts, attenuators on ductwork, siting away from windows and a maintenance regime. A Noise Impact Assessment should model the plant as operating at night, because an assessment that only considers daytime operation will be returned.

Vehicle movements are the other half, and they are unusual. Removals happen at any hour, including the small hours, because deaths do not keep business hours. Be explicit about that in the application rather than hoping it will not be noticed, and explain the arrangements that limit disturbance: a quiet approach, no reversing alarms in the yard at night, the removal vehicle garaged or screened, and staff instructions on door closing and voices.

Parking, hearse access and servicing

A cortege needs somewhere to form up. The application should show where the hearse and limousines stand, how they enter and leave without reversing onto the footway, and where mourners' vehicles go on the day of a funeral. On a town centre site the honest answer is often that mourners park in the public car park and the cortege forms on the street for a short period, which a highway officer can accept if it is described and if the duration is short.

Show the swept path for the longest vehicle at the access and inside any yard, the coffin delivery arrangement, and the waste storage with its collection point. Where the fleet is garaged on site, say how many vehicles and whether any are washed on site, since vehicle washing has a drainage consequence.

Flats above and the hours conditions to seek

Residential occupiers above a funeral director's premises raise plant noise, night movements and ventilation discharge. Each is answerable, and the application is stronger for addressing them before they are raised, with the discharge point taken above the eaves, the plant enclosed and located away from bedroom windows, and the night time removals route kept away from the shared entrance.

On conditions, the public facing hours can be conditioned without difficulty. What must not be conditioned is the removal of deceased persons, which cannot be restricted to office hours, so ask for a condition that distinguishes between public opening hours and operational access. Officers accept the distinction when it is explained in the application. They rarely draft it unprompted, and varying it afterwards by section 73 is slower than getting it right.

The Design and Access Statement should carry the shopfront drawings, the plant locations and the servicing arrangement in one place, so the officer is not assembling the picture from three documents.

PlanScope can draft the planning, noise, extraction and waste documents for a change of use of this kind from your site details and the answers in the guided flow, with the address checked against conservation area and listed building records as you go. Acoustic measurement and the drainage and ventilation design need suitably qualified professionals.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Are funeral directors Class E or sui generis?

It is not settled. The pre-2020 Order expressly placed premises for the direction of funerals in Class A1, and that wording did not carry into Class E. Reception and arrangement rooms fit Class E as a service to visiting members of the public, while a mortuary and preparation room lead some authorities to treat the composite use as outside the classes.

How can I get certainty on whether permission is needed?

Ask the authority in writing through pre-application advice and keep the reply, or apply for a certificate of lawfulness of proposed use under section 192 of the Town and Country Planning Act 1990 for a formal answer. Applying for planning permission in any event costs more but removes the risk and settles frontage and plant issues in one decision.

How do I answer a dead frontage objection?

With design and evidence. Keep a glazed shopfront with a lit, dressed display rather than film or a blind, keep the entrance on the street and light the frontage at night. Then set out the unit's position in the frontage, nearby vacancy, the proportion already in non-retail use, and the marketing history of the unit.

What consents does a preparation room need?

Beyond planning, a trade effluent consent from the sewerage undertaker under section 118 of the Water Industry Act 1991 for the discharge, and compliance with the duty of care and hazardous waste rules under the Environmental Protection Act 1990 for clinical waste. Mechanical ventilation with a discharge point above the eaves is normally expected too.

Can the council condition hours so removals cannot happen at night?

It should not, and the application should pre-empt it. Deaths happen at all hours, so ask for a condition that separates public opening hours from operational access for removals, and set out the measures limiting disturbance: a quiet approach, no reversing alarms at night, a screened or garaged vehicle and staff instructions.

Sources and further reading

funeral directorschange of useclass etown centrenoisecommercial occupiers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Project Type Guides

View all →
Project Type Guides7 min read

Building on a serviced plot from the self-build register

A self-build register plot usually arrives with outline permission and a design code. What is left for you is the application, the condition discharges and the exemptions.

Read article →
Project Type Guides7 min read

Converting a former school building into flats

Class F1 schools carry no prior approval route to residential. The two tests that decide a school conversion are the loss of community floorspace and what happens to the playground.

Read article →
Project Type Guides7 min read

Developing a backland plot behind existing houses

The house on a backland plot is rarely the problem. The drive to it is. Access width, fire service reach, bin carry distance and disturbance decide these applications.

Read article →
Project Type Guides7 min read

Rebuilding a dwelling destroyed by fire

Losing the house does not automatically lose the right to live there. The planning question is whether the residential use has been abandoned, and the evidence to answer it starts the day after the fire.

Read article →
Project Type Guides7 min read

Replacing a house with a larger dwelling

Most replacement dwelling refusals come down to two things: the volume comparison and whether the existing house still counts as a dwelling at all. Settle both before you design.

Read article →
Project Type Guides7 min read

Building a second house in a large garden

Gardens are not previously developed land, so an infill plot has to earn its permission on layout. Here is what decides it, in the order councils actually assess it.

Read article →