Energy, Sustainability and Carbon

Gas boilers in an energy statement and where policy stands

6 min readBy PlanScope Editorial Team

Part L still permits a gas boiler in a new dwelling while local plan carbon and heat network policies often rule it out. What the energy statement has to show either way.

Gas boiler planning policy is now the awkward part of most energy statements, because the national building standard and a growing number of local plans pull in different directions. Building Regulations still permit a gas boiler in a new dwelling. Adopted local plan policies in many authorities effectively do not, either by setting a carbon reduction target that gas cannot reach or by requiring connection to a heat network or a heat pump solution. The energy strategy has to reconcile the two, and it is the local policy that decides the application.

Where the national position sits

The Part L uplift that took effect in June 2022 tightened the target emission rate for new dwellings and changed the notional building against which compliance is measured. A gas boiler scheme can still comply, though it has to work harder on fabric, ventilation and low-carbon supplementary measures to do so.

The Future Homes Standard has been consulted on with the stated intention of moving new homes away from fossil fuel heating, and the commencement date and final content have moved more than once. Treat it as announced and not yet in force, check the current position on gov.uk before you write, and state in the energy statement which edition of Part L the calculations were run against. Transitional arrangements matter here: a scheme with a commencement date inside a transition window may be assessed against the earlier edition, and that should be stated rather than assumed.

Nothing in the national position requires an applicant to justify a gas connection. Local policy frequently does.

Local plan policies that restrict new gas

Section 1 of the Planning and Energy Act 2008 lets a local plan include policies requiring a proportion of the energy used in development to come from renewable sources on site and setting energy efficiency requirements. That is the statutory hook most authorities cite.

The policies fall into recognisable families.

  • A percentage carbon reduction beyond the Building Regulations target, which a gas boiler scheme will usually miss without an unreasonable amount of photovoltaic array.
  • A requirement to follow an energy hierarchy, with the London Plan's be lean, be clean, be green and be seen sequence the widest-known version, and policy SI 2 the relevant policy for major development in London. Where the on-site target is not met, a carbon offset payment secured by obligation makes up the shortfall. Check the current Greater London Authority energy assessment guidance for the baseline and the offset price, because both are revised.
  • A heat network requirement, obliging connection where the site falls inside a designated heat network priority area, or safeguarding a future connection point where a network is planned.
  • An explicit prohibition on new fossil fuel heating systems, which a handful of authorities have adopted and more have proposed through plan review.

Read the policy wording rather than the supporting text. A policy that says development should achieve a target is weaker in practice than one that says development will only be permitted where it does.

Hybrid systems and how they are assessed

Hybrid arrangements pairing a heat pump with a gas boiler for peak demand are offered as a compromise and are assessed sceptically, for a defensible reason: the modelled split between the two heat sources is an assumption, and occupant behaviour and control settings decide the real one.

If you propose a hybrid, model the split explicitly, say what proportion of annual heat demand each source carries, and show the calculation. Then explain the control strategy that delivers it. An officer reading a hybrid case wants to know what stops the boiler doing most of the work on a cold week in January.

Where the reason for the hybrid is peak electrical capacity rather than carbon, say that plainly and evidence it. That is a stronger argument than an efficiency claim.

Electrical capacity and why it drives the answer

The practical constraint on all-electric heating is often the connection, not the plant. A scheme moving from gas boilers to heat pumps raises the diversified electrical load per dwelling substantially, which can turn a simple service connection into a new substation, a reinforcement contribution and a programme risk.

Get the distribution network operator's budget estimate early, because the answer changes the layout: a substation needs a site, access and a lease. Record the position in the Energy Statement and, where a substation is proposed, in the Utilities Assessment as well, so the two documents agree.

Heat pumps also change the overheating picture, because the fabric and glazing strategy that suits a low-temperature system interacts with Part O. An Overheating Risk Assessment run on the final glazing specification, rather than an early one, avoids a late redesign.

Existing buildings and replacement plant

Replacing a boiler in an existing house is not usually development at all, so planning policy does not reach it. The exceptions are worth knowing.

A flue on a listed building affects the character of the building and may need listed building consent. External plant in a conservation area can need permission where it is on a principal elevation fronting a highway. An air source heat pump on a dwelling is permitted development under Class G of Part 14 of Schedule 2 to the General Permitted Development Order 2015, subject to conditions on siting, scale and compliance with the relevant planning standards, and those conditions have been amended, so read the current text rather than a summary.

Commercial conversions are a different problem, because the existing heat source is often a dated gas system and the conversion triggers an energy assessment against current policy. The cost of the change sits in the viability case.

Evidencing a case for gas where it is still proposed

Sometimes gas remains the proposal. The evidence that makes that arguable, in rough order of weight:

  1. A written distribution network operator response showing the electrical capacity is not available within the development programme, with the reinforcement cost and timescale.
  2. A carbon comparison over the plant's expected life, using the published grid carbon factors, that shows what the gas option actually costs in emissions against the alternatives assessed.
  3. A safeguarding commitment: pipework, plant space, riser provision and electrical capacity designed so the building can convert to low-carbon heat later without opening up the structure.
  4. Where the site sits in a heat network priority area, a network operator's written position on connection timing.

An assertion that heat pumps were considered and found unsuitable, with no supporting figures, is what gets conditions imposed instead. And a carbon comparison that stops at the day of completion misses the point of the policy.

Conditions restricting a future connection

Authorities increasingly attach conditions about heat supply, and they have to meet the six tests in the Planning Practice Guidance on conditions. Those most often seen require a scheme for connection to a future heat network, require the plant specified in the approved energy statement and no other, or require submission of an as-built report against the modelled performance.

The be-seen style monitoring condition is the one to read carefully. It commits the developer to reporting actual performance after occupation, and the reporting obligation can outlast the developer's interest in the site. Agree who holds it before the decision notice is issued.

Draft your Energy Statement in minutes and then send it for professional review, or read the all-electric new homes decision for a worked comparison. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance rather than legal advice, so check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Can a new home still be built with a gas boiler?

Under Building Regulations, yes, if the scheme meets the target emission rate in the current edition of Part L, which usually means working harder on fabric and adding photovoltaics. Local plan policy is the tighter constraint. Many adopted policies set a carbon reduction target or a heat network requirement that a gas boiler scheme cannot satisfy.

Has the Future Homes Standard come into force?

It has been consulted on with the intention of moving new homes away from fossil fuel heating, and its commencement date and final content have shifted more than once. Check the current position on gov.uk before writing an energy statement, state the edition of Part L your calculations used, and note any transitional arrangements that apply to the scheme.

What is the statutory basis for a local policy restricting gas?

Section 1 of the Planning and Energy Act 2008 allows a local plan to require a proportion of energy used in development to come from renewable sources on site and to set energy efficiency requirements. That is the provision authorities cite. Whether a particular policy bites depends on its wording, so read the policy itself rather than the supporting text.

Do I need planning permission to fit an air source heat pump?

Usually not on a dwelling, because Class G of Part 14 of the General Permitted Development Order 2015 permits one subject to conditions on siting, scale and the applicable planning standards. Those conditions have been amended, so read the current text. Listed buildings and some conservation area locations fall outside the permission and need consent.

How do I justify gas where the electrical connection is the problem?

With a written response from the distribution network operator setting out the capacity available, the reinforcement required, its cost and its timescale against the development programme. Pair that with a safeguarding commitment: plant space, risers and electrical provision designed so the building can convert to low-carbon heat later without structural work.

Sources and further reading

energy statementgas boilersheat pumpspart lcarbon

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Energy, Sustainability and Carbon

View all →
Energy, Sustainability and Carbon8 min read

Heat pumps in an energy strategy: what officers check

A heat pump energy strategy is judged on three things: the seasonal performance figure against the design flow temperature, the external unit's location, and the noise assessment positions.

Read article →
Energy, Sustainability and Carbon7 min read

Future Homes Standard transitional rules for consented sites

A planning permission does not fix which edition of the energy requirements applies. The transitional mechanism works plot by plot, so the evidence of a start on each individual dwelling is what matters.

Read article →
Energy, Sustainability and Carbon6 min read

Embodied carbon of foundations and ground works

On brownfield sites the substructure can carry more embodied carbon than the frame above. How piling, rafts, ground improvement and mix design compare, and how to report substructure so the saving is reviewable.

Read article →
Energy, Sustainability and Carbon7 min read

Green roofs: what counts and what the drawings must show

A thin sedum blanket satisfies almost no current policy. What separates extensive, biodiverse and intensive roofs, how much attenuation credit to expect, and the drawings that discharge the condition.

Read article →
Energy, Sustainability and Carbon6 min read

Water efficiency standards and how to hit 110 litres

The tighter 110 litre standard applies only where a plan policy adopts it and a condition imposes it. How the water efficiency calculation works and which fittings decide the result.

Read article →
Energy, Sustainability and Carbon7 min read

Energy and carbon conditions: what gets discharged when

Energy and carbon conditions bite at different points in the programme. The triggers, the as-built evidence councils accept, and what to do when design changes break one.

Read article →