Geotechnical reporting and Eurocode 7 responsibilities

8 min readBy PlanScope Editorial Team

Eurocode 7 splits ground work into an investigation report and a design report with different authors. Knowing which you bought is what prevents a gap at building control.

Who signs a geotechnical report depends on which report you mean, because Eurocode 7 splits the work into two documents with different authors and different liabilities. The ground investigation report presents and evaluates what was found. The geotechnical design report states the design values, the assumptions and the supervision required on site. One person can write both, and on many projects one person does, but the duties are separate and a developer who does not know which they have bought will find out at building control stage.

That split is also the answer to most arguments about scope. If nobody has been appointed to produce the design report, nobody has taken responsibility for the design values, and the numbers in the investigation report are evaluations rather than instructions.

Geotechnical categories and the effort each implies

Eurocode 7 sorts structures into three geotechnical categories, and the category governs how much investigation and design effort is appropriate.

Category 1 covers small and comparatively simple structures where the risks are negligible, the ground conditions are known from comparable experience, and there is no excavation below the water table in difficult ground. Qualitative work based on experience can be enough.

Category 2 covers conventional structures and foundations with no exceptional risk or unusual ground conditions. Most housing, most commercial buildings and most retaining structures sit here. Quantitative geotechnical data and calculation are required.

Category 3 covers very large or unusual structures, structures in highly seismic or unstable ground, abnormal risks, and conditions outside the scope of the standard provisions. It calls for additional investigation, specialist analysis and, frequently, independent review.

Two practical uses for the category. It tells you whether a proposal from a ground investigation contractor is proportionate, because a category 2 site quoted as if it were category 3 is being over-investigated and a category 3 site quoted as category 2 is being under-investigated. And it tells you whether you need someone to do design at all, or only to evaluate.

The category is provisional at the outset and is meant to be reviewed once the ground is known. A site assumed to be category 2 that turns out to contain deep uncontrolled fill is category 3, and the investigation should be extended rather than the finding minimised.

Investigation, interpretation and design as separate duties

Three activities, and confusion between them causes most of the disputes.

Investigation is the physical work: boreholes, trial pits, in situ testing, sampling, laboratory testing, carried out to the relevant parts of the standards on ground investigation and site investigation practice. The output is factual data.

Interpretation is the evaluation of that data: ground model, stratigraphy, groundwater regime, derived parameter values, identification of hazards. The output is the ground investigation report.

Design is the selection of design values, the calculations for the limit states, the specification of the foundation or retaining solution, and the statement of what must be checked during construction. The output is the geotechnical design report.

Duty Output Usual author
Investigation Factual data, logs, test results Ground investigation contractor
Interpretation Ground investigation report with derived values Geotechnical engineer or engineering geologist
Design Geotechnical design report, design values, monitoring Geotechnical designer, coordinating with the structural engineer

The gap that opens most often is between the second and third rows. A developer commissions an investigation, receives a well written interpretative report, and assumes the foundation design is covered. It is not. The interpretative report gives parameters. Someone still has to choose the design values, apply the partial factors and specify the solution.

Who signs which part of the report

Factual data is signed by the contractor who produced it, and the accreditation of the testing laboratory matters. Ask which tests were carried out under an accredited schedule and which were not, because that distinction affects how much weight the results carry.

The interpretative report is signed by the engineer or geologist who prepared it, and it should state clearly what it is and what it is not. Good practice is an explicit statement that the report does not constitute a geotechnical design and that design values require the designer's own verification.

The design report is signed by the geotechnical designer. Where the structural engineer takes the design responsibility, the designer is that engineer, working from the interpretative report. Where a specialist takes it, the interface with the structural design has to be defined in writing, including who owns the foundation loads, the settlement limits and the construction sequence assumptions.

Ask for the signature page on all three. It is a quick way to discover that a document you thought was a design has no designer.

Chartered geologist and chartered engineer routes

Competence in this field is evidenced in a few recognised ways, and the right one depends on the task.

Chartered engineer status through the civil or structural institutions is the usual route for someone taking geotechnical design responsibility. Chartered geologist status is the usual route for ground modelling, engineering geology and interpretation. A register of ground engineering professionals administered by the civil engineering institution recognises three levels of ground engineering competence and is the clearest single indicator for a category 3 project or for an independent reviewer.

What matters practically is the match between the person and the duty. A chartered geologist is well placed to produce the ground model and less well placed to sign a retaining wall design. A chartered structural engineer may be well placed to sign the design and reliant on the geologist for the parameters. Neither is a criticism of either.

For a basement or a deep excavation the competence bar rises, and our note on basement impact assessment author competence sets out what councils in constrained urban areas expect. Where you are procuring several specialisms at once, writing a specialist survey brief covers how to scope them in one instruction.

Interfaces with the contaminated land work

Geotechnical and contamination investigation share fieldwork and diverge in everything else.

The overlap is the exploratory holes, the sampling and, to a degree, the laboratory schedule. Commissioning both from one contractor under one brief avoids paying twice for the same holes, and it produces a single set of logs that both reports refer to.

The divergence is in interpretation. A geotechnical engineer assesses strength, compressibility and groundwater. A contaminated land specialist assesses source, pathway and receptor linkages against human health and controlled waters criteria. Land contamination reporting must be carried out by suitably qualified and experienced persons working to the relevant British Standard, and that is a separate competence from geotechnical design.

Three interfaces need managing explicitly. Piling through a low permeability layer can create a pathway to groundwater, which is a contamination issue arising from a geotechnical decision. Ground gas protection measures interact with floor slab design. And any material to be reused as engineering fill has to satisfy both geotechnical suitability and the relevant waste and contamination controls. Raise all three at the brief stage, not after the Contaminated Land Assessment has been issued.

What a building control body expects

Building control looks for justification of the structural design, and for foundations that means evidence of the ground conditions and of how the design accounts for them. In practice they will want the investigation data, the derived parameters and the design calculations, and on a site with unusual conditions they may ask for the designer's credentials.

Two points to plan for. Where design responsibility is split between a specialist and the structural engineer, building control will want to see that the interfaces are covered, so a written record of who owns what saves time. And where the design relies on construction stage verification, for example inspection of formation level or of pile records, the verification regime has to be stated in the design report and then actually carried out with records kept.

Planning and building control are separate processes with separate requirements. A Geotechnical Assessment submitted to support a planning application addresses the planning issues, such as stability, land instability and the deliverability of the proposal. It does not discharge the building control duty.

Scoping an investigation that will not need repeating

Repeat investigations are common and almost always avoidable. Four things prevent them.

  1. Write the brief from a desk study, so the holes target identified uncertainties rather than a standard grid.
  2. Include the contamination scope in the same brief, with the same exploratory holes.
  3. Specify depths against the likely foundation solutions, including the piled option, rather than to a nominal depth.
  4. Install and retain monitoring wells where groundwater or ground gas could govern, because returning to the site to install them later costs more than leaving them in.

Also state in the brief who will produce the interpretative report and who will produce the design report. If the answer is that nobody has been appointed for the second, you have found the gap before it costs you.

Note that Eurocode 7 and its supporting standards are periodically revised, so confirm the current published versions and the UK National Annex before writing a specification.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

PlanScope can draft the planning documents that accompany ground investigation evidence, and reviewers who can check and sign off a draft are listed in the professional directory. For specialist technical reports, qualified professional input may be required.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the difference between a ground investigation report and a geotechnical design report?

The ground investigation report presents and evaluates the factual data, giving a ground model, groundwater regime and derived parameter values. The geotechnical design report states the design values selected, the limit state calculations, the specified solution and what must be verified during construction. An interpretative report alone does not constitute a foundation design.

What are the Eurocode 7 geotechnical categories?

Category 1 covers small, simple structures with negligible risk in known ground. Category 2 covers conventional structures with no exceptional risk, which is most housing and commercial development, and requires quantitative data and calculation. Category 3 covers very large or unusual structures, abnormal risks and unusual ground, and calls for additional investigation and often independent review.

Who is qualified to take geotechnical design responsibility?

Usually a chartered engineer through the civil or structural institutions, working from an interpretative report. Chartered geologist status is the usual route for ground modelling and engineering geology. For unusual or higher risk sites, the ground engineering professional register administered by the civil engineering institution is the clearest indicator of competence at the level required.

Can one investigation cover geotechnical and contamination needs?

Yes for the fieldwork, and it saves money to brief both together using the same exploratory holes and one set of logs. Interpretation is separate: geotechnical work assesses strength, compressibility and groundwater, while contamination work assesses source, pathway and receptor linkages, and must be carried out by suitably qualified and experienced persons.

Does a geotechnical report for planning satisfy building control?

No. A geotechnical assessment submitted with a planning application addresses planning matters such as stability, land instability and deliverability. Building control separately requires justification of the structural design, meaning the investigation data, derived parameters and calculations, plus records of any construction stage verification the design relies on.

Sources and further reading

geotechnicaleurocode 7ground investigationcompetencefoundations

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications6 min read

Whole life carbon assessment competence and scope

The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →
Professionals and Qualifications6 min read

What MRTPI tells you about a planning agent

Chartered membership of the Royal Town Planning Institute signals assessed competence and a binding code of conduct. It is not a financial remedy, and planning consultancy has no protected title at all.

Read article →