Permitted Development

Ground mounted solar arrays in a domestic garden

7 min readBy PlanScope Editorial Team

A garden solar frame can be permitted development, but only one per curtilage, capped at 9 square metres of panel and kept 5 metres from the boundary. Where the limits bite and what to do when your array exceeds them.

A ground-mounted array in your back garden can be permitted development, but the limits are tight enough that many of the arrays people actually want need a planning application. The ground mounted solar garden permitted development right sits in Class B of Part 14 of the Town and Country Planning (General Permitted Development) (England) Order 2015, and it allows one stand-alone installation per curtilage, up to 4 metres high, with a surface area of no more than 9 square metres and no dimension over 3 metres, kept at least 5 metres back from the curtilage boundary.

Nine square metres is roughly four or five panels. If your quote is for a 6 kilowatt array on a frame at the bottom of the garden, you are outside the right and into a householder application.

What the stand-alone domestic class permits

Part 14 splits domestic solar in two. Class A deals with equipment on the dwellinghouse itself or on a building within its curtilage. Class B deals with stand-alone solar for domestic premises, which means panels on their own frame or post rather than fixed to a building.

Class B covers both solar photovoltaic equipment and solar thermal collectors, along with alterations to an existing stand-alone installation. It applies to a dwellinghouse and to a block of flats, which catches communal arrays in the grounds of a converted house as well as single homes.

The right exists for microgeneration, a term the Order borrows from section 82 of the Energy Act 2004. That definition sets a ceiling of 50 kilowatts of electrical capacity or 45 kilowatts thermal. Domestic gardens run out of space long before they run out of capacity, so the capacity ceiling rarely bites.

Height, area and boundary limits

Four numbers decide most cases.

Limit Figure
Maximum height of the installation 4 metres
Maximum surface area of the array 9 square metres
Maximum of any single dimension, including housing 3 metres
Minimum distance from the curtilage boundary 5 metres

The 9 square metre figure is the surface area of the solar equipment, not the footprint of the frame or the fenced compound around it. The 3 metre dimension limit includes any housing, so an inverter cabinet bolted to the frame counts towards the measurement. Height is taken to the highest point of the equipment in its installed position, which on a tilted frame is the top edge of the rear panel row.

The 5 metre boundary standoff is the limit that most often kills a scheme. A typical suburban garden is 8 to 10 metres wide, which leaves a strip in the middle and nothing like the clear southern aspect the installer wanted. Measure it from the curtilage boundary, which is not always the fence line if part of the garden was bought from a neighbour, and say so on the block plan.

The one installation per dwelling restriction

Class B permits only the first stand-alone solar installation within the curtilage. A second array needs planning permission, however small it is and however far it sits from the first.

This catches two situations regularly. One is the household that puts in a modest array, likes the result, and wants to double it two summers later. The other is a property with an existing stand-alone solar thermal collector for hot water, where the owner has forgotten it counts.

Adding panels to an existing frame is the better route when it works, because alteration of an existing stand-alone installation is within Class B as long as the resulting installation still meets every limit. Nine square metres remains nine square metres.

Visibility from the highway and designated land

In a conservation area or a World Heritage Site, the right is lost if any part of the installation would be nearer to a highway bounding the curtilage than the nearest part of the dwellinghouse is to that highway. In plain terms, a front-garden array in a conservation area is out.

Note that the test is about the highway boundary, not about whether the array can be seen. A side garden fronting a lane is a highway frontage even if a hedge screens it today, because hedges get cut down.

A condition also applies everywhere: the equipment must be sited, so far as practicable, to minimise its effect on the external appearance of the building and the amenity of the area. That is a genuine obligation rather than decoration, and it is the hook an enforcement officer uses when an array has been parked against a shared boundary in full view of three neighbours. The same reasoning that decides what counts as incidental to the enjoyment of a dwellinghouse applies to siting judgements of this kind: the question is the real effect on the ground.

An Article 4 direction can remove the right altogether. Councils have used Article 4 over householder rights in some conservation areas, so check the designation before ordering a frame.

Listed buildings and their curtilage

Class B does not apply at all if any part of the equipment would be within the curtilage of a listed building or a scheduled monument. Not reduced, not conditional. Removed.

Curtilage is wider than most owners assume. The garden of a Grade II listed farmhouse is normally within its curtilage, and so is the paddock immediately behind if it has been in the same enjoyment since listing. An array there needs a householder planning application, and if a wall, outbuilding or hardstanding has to be altered to take it, listed building consent may be needed too.

The practical consequence is a longer document set. A Planning Statement explaining the microgeneration purpose, a heritage assessment proportionate to the significance affected, and elevations showing the array against the historic building are the usual minimum. The council's validation list will say what else it wants.

Removal when no longer needed for microgeneration

The second Class B condition requires the equipment to be removed as soon as reasonably practicable when it is no longer needed for microgeneration.

Dead panels left on a frame for a decade are a breach of condition, and the obligation sits with whoever owns the land at the time rather than with the installer. It also means the frame itself has to go, not just the glass.

Keep the commissioning paperwork, the generation meter readings and the inverter warranty in the property file. If an officer or a buyer's solicitor asks whether the installation was lawful, the evidence that it was installed for microgeneration and is still generating is what answers the question. Where the answer needs to be formal, a Lawful Development Certificate under section 192 of the Town and Country Planning Act 1990 is the only route that carries weight.

Comparing a ground array with a roof installation

Roof-mounted equipment under Class A is the more generous right for most houses. There is no 9 square metre cap, which is why a full roof of panels is normally permitted development while four panels on a frame may not be.

Class A has its own limits instead. Equipment must not protrude more than 200 millimetres beyond the roof plane or wall surface, and must not sit above the highest part of the roof, excluding the chimney. On a flat roof the ceiling is 1 metre above the roof surface. On designated land, panels must not go on a wall fronting a highway.

Question Stand-alone array (Class B) Roof mounted (Class A)
Area cap 9 m² of solar surface No area cap
Number permitted First installation only No equivalent numerical cap
Boundary standoff 5 metres Not applicable
Listed building curtilage Right not available Right not available

So the ground array earns its place where the roof cannot take panels: a north-facing or heavily shaded roof, a thatched or slated roof the structural engineer will not load, or a flat roof already full of plant. Shade matters more than orientation in most gardens, and a tree you cannot fell because it carries a Tree Preservation Order will beat any amount of clever mounting. The same practical thinking applies to the drainage condition attached to hard surfaces under Class F when you lay a maintenance path to the array.

Where the array exceeds a Class B limit, treat the application as a straightforward householder one and front-load the case: generation figures from the installer, a shading study, a site section showing the array against the boundary fence, and a short note on glint and glare if a road or railway faces the panels. For the full picture of how the roof-mounted right compares, read the detail on solar panels on a house under Part 14 Class A, and if you want a view on which supporting documents your site is likely to need, enter your postcode on PlanScope.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and remember that a Lawful Development Certificate is the only formal way to confirm that works are lawful. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How many panels fit within the 9 square metre limit?

Around four or five standard domestic panels, depending on the model, since most sit near 1.7 to 2 square metres each. The limit measures the surface area of the solar equipment rather than the frame or any fenced enclosure, so check the panel datasheet rather than the array footprint when you work out whether the right applies.

Can I add a second array later?

Not under Class B, which permits only the first stand-alone installation within the curtilage. A second array needs planning permission whatever its size. Altering the existing installation is a better route where it works, because alteration stays within Class B provided the finished installation still meets the 9 square metre, 4 metre, 3 metre and 5 metre limits.

Does the 5 metre boundary distance apply to every side?

Yes. The right is lost if any part of the installation falls within 5 metres of the boundary of the curtilage, on any side. Measure from the legal curtilage boundary rather than the current fence, which can differ where land has been added to a garden, and show the dimension on the block plan you keep on file.

Can I put a ground array in the garden of a listed building?

Not as permitted development. Class B is unavailable where any part of the equipment would sit within the curtilage of a listed building or a scheduled monument, so a householder planning application is needed. Listed building consent may also be required where walls, outbuildings or historic surfaces are altered to accommodate the array or its cabling.

What does the removal condition actually require?

The equipment must be removed as soon as reasonably practicable once it is no longer needed for microgeneration. That covers the frame and mountings as well as the panels, and the duty falls on whoever owns the land at the time. Keeping commissioning records and generation data is the simplest way to show the installation is still in use.

Sources and further reading

permitted developmentsolargpdohouseholderrenewable energypart 14

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development6 min read

The three year deadline on a prior approval

A planning permission must be begun within three years. A Part 3 prior approval must be completed within three years of the prior approval date, and the condition sits in the Order where nobody can vary it.

Read article →
Permitted Development7 min read

Class M: betting shops and takeaways to homes

Class M turns a small shop, betting office or hot food takeaway into a dwellinghouse through prior approval. The 150 m2 floorspace cap and the 20 March 2013 qualifying use date decide most cases before design begins.

Read article →
Permitted Development8 min read

Class L and moving between C3 and C4 use

Class L permits a dwellinghouse to become a small house in multiple occupation and back again, with no application. The limits are the household test, the six-resident ceiling and the Article 4 directions that withdraw the right.

Read article →
Permitted Development8 min read

Industrial and warehouse extensions under Part 7

Part 7 Class H lets an occupier extend an industrial building or warehouse without an application, within limits that are tighter than they look. This covers the allowance, the boundary condition and the new process restriction.

Read article →
Permitted Development7 min read

Bat roosts and roof works under permitted development

A re-roof or loft conversion needs no planning application, so nothing prompts an ecology check. This sets out when to commission a roost assessment, the survey seasons that control the programme, and who is liable.

Read article →
Permitted Development7 min read

Protected trees and permitted development on the same site

Permitted development grants planning permission for the building work, not consent to touch a protected tree. This covers the consent routes, the root protection trap in foundation design, and how to sequence the two.

Read article →