Trees and Arboriculture

Hedgerows and trees in the statutory biodiversity metric

7 min readBy PlanScope Editorial Team

Hedgerow units sit in their own module and cannot be met with area habitat. That single rule decides more biodiversity net gain outcomes on small sites than anything else.

The statutory biodiversity metric scores hedgerows in their own module, measured in kilometres rather than hectares, and hedgerow units cannot be delivered by creating area habitat. A scheme that removes 300 m of species-rich hedgerow and proposes a wildflower meadow in compensation has not addressed the hedgerow shortfall at all. It has created area units and left the hedgerow deficit exactly where it was.

Understanding which module each feature falls into, before the layout is fixed, is the difference between a gain plan that works and one that needs a redesign.

How hedgerows are scored separately

The metric divides habitat into area modules measured in hectares, hedgerow modules measured in kilometres, and watercourse modules measured in kilometres. Each is calculated separately, and each has to show at least the required percentage gain in its own right.

That separation is the trading rule that matters most on small sites. A field boundary scheme with a modest area baseline and a long hedgerow network will often show a comfortable area gain and a stubborn hedgerow shortfall, because hedgerow length is easy to lose to visibility splays, access points and plot boundaries and hard to replace at the same distinctiveness.

Hedgerow distinctiveness runs from a line of trees at the lower end, through native hedgerows and native hedgerows with trees, to species-rich native hedgerows and species-rich hedgerows with trees at the upper end. Species-rich, in the metric's terms, depends on the number of native woody species present measured along a sample section, and it is determined by survey rather than by impression.

Where individual trees appear

Individual trees are not hedgerow features unless they stand within a hedgerow. Standalone trees are accounted for in the area module, with canopy area converted to hectares and classified as urban tree or rural tree habitat depending on the setting.

Two consequences follow.

The canopy area used is measured, so an accurate crown spread from the Tree Survey prepared under BS 5837:2012 feeds straight into the units. A survey that records a nominal radius rather than four-point spreads will produce the wrong figure, and the assessor has no way to correct it.

And because trees sit in the area module, losing a mature oak and planting hedgerow does not balance, while losing hedgerow and planting trees does not balance either. The modules do not talk to each other.

Trees within a hedgerow raise the hedgerow's distinctiveness band rather than being counted twice, which is why the survey has to record whether each tree stands in the line of the hedge or clear of it.

Condition assessment for hedgerows

Condition is assessed against criteria covering structure and management rather than species alone: height and width, gappiness along the length, the presence of undisturbed ground and a margin at the base, the extent of perennial weed cover, and signs of damage from cutting or stock.

Three practical points.

Gappiness is assessed over the length of each distinct hedgerow parcel, so splitting a long boundary into parcels at genuine breaks, rather than treating it as one run, produces a fairer result and one the ecologist can defend.

A hedge flailed hard every year to a narrow box scores poorly on condition even where the species composition is rich, which means condition can often be improved by changing the management regime rather than by planting anything. That is one of the few low cost ways to gain units on a farm boundary.

And the margin matters. A hedge with a metre of undisturbed ground and a herb-rich base scores differently from one ploughed to the stems, so the layout should keep a buffer rather than build to the root zone.

Trading rules within the hedgerow category

Losses of hedgerow must be compensated with hedgerow of the same distinctiveness band or higher. Replacing a species-rich hedgerow with a two-species hawthorn and blackthorn planting does not satisfy the rule, however long it is.

That drives two design responses. Retain first, because retained hedgerow carries no creation discount. Where loss is unavoidable, plant species-rich mixes with local provenance stock rather than the standard hedging mix, and record the species list in the planting specification so the assessor can band it correctly.

Enhancement of existing hedgerow is often the most efficient route. Gapping up, allowing an increase in height and width, establishing a margin and moving to rotational cutting can lift a hedgerow from poor to moderate or good condition across a long length, and those gains accrue on habitat you already control without a single whip being planted.

Retaining hedgerows to avoid a shortfall

Layout decisions that preserve hedgerow units, roughly in order of value:

  1. Take the access through the lowest distinctiveness section, or through an existing gap, rather than through the best stretch.
  2. Keep hedgerows on the outside of plot boundaries and in public open space rather than inside private gardens, where future management cannot be secured.
  3. Provide visibility splays by lowering rather than removing where the highway authority will accept it, since a reduced hedge retains more units than a removed one.
  4. Set development back far enough to allow a margin at the base.
  5. Where a hedge must be crossed by a service run, agree a single crossing point rather than several.

Protection during construction needs the same discipline as trees. A hedgerow shown as retained and then used as a materials store has been lost in practice, and the condition assessment at monitoring will say so. The approach in long term tree management secured by planning agreement applies equally to hedgerow, and securing the management for 30 years is a requirement of the gain plan rather than an optional extra.

Planting as a source of units and its time lag

Newly planted hedgerow does not deliver its units on day one. The metric applies a discount reflecting the years required to reach target condition, and hedgerow takes long enough that a scheme relying on new planting to close a large gap will find the discounted figure disappointing.

Difficulty of creation applies as well. Planting a native hedgerow is achievable, and establishing a species-rich hedgerow in good condition is harder and is treated accordingly.

Practical implications: plant early, ideally in advance of development where the land is available, because the clock for time to target condition runs from creation rather than from occupation. Specify whips at appropriate density in a double staggered row, with guards, mulch and a watering commitment through establishment. And budget for replacement of failures, since a hedge with 30 per cent losses in year three will not reach the condition assumed in the Biodiversity Net Gain Assessment.

What the assessor needs from the tree survey

Give the ecologist a survey that answers the metric's questions as well as the arboricultural ones.

For each hedgerow: a mapped line with a length, the woody species present with an indication of frequency, height and width, gappiness, the ground condition at the base, and whether trees stand within the line. For each individual tree: species, measured crown spread in four directions, condition, and whether the setting is urban or rural.

Where the same survey has to serve BS 5837 purposes, root protection areas and category grading, say so at instruction stage so the fieldwork is done once. Councils increasingly cross-check the tree survey against the metric entries, and a mismatch between the two documents is a straightforward reason to return the submission. The distinction between the metric and the separate hedgerow removal regime is worth keeping clear as well, since clearing a site before you apply can breach the hedgerow rules and destroy your baseline at the same time.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required. Enter your postcode on PlanScope to see which ecology documents your scheme is likely to need.

Frequently asked questions

Can I offset hedgerow loss with new grassland?

No. The metric keeps area, hedgerow and watercourse modules separate, and each has to show the required gain on its own. Creating wildflower grassland generates area units and leaves a hedgerow shortfall untouched, so hedgerow loss has to be met with hedgerow retention, enhancement or creation.

How are individual trees counted in the metric?

Standalone trees fall in the area module, with measured canopy area converted to hectares and classified as urban tree or rural tree habitat. Trees standing within a hedgerow are not counted separately, and instead raise the distinctiveness band of that hedgerow, so the survey must record which applies.

What makes a hedgerow species-rich in the metric?

The number of native woody species recorded along a sampled section, determined by survey rather than by appearance. Species-rich hedgerows sit in a higher distinctiveness band, which means their loss creates a larger shortfall and their replacement must be at the same band or higher under the trading rules.

Can I improve hedgerow units without planting anything?

Often, yes. Condition assessment covers height, width, gappiness, the base margin and management, so moving from annual tight flailing to rotational cutting, allowing growth in height and width and establishing an undisturbed margin can lift condition along a long length of hedgerow you already control.

How long does new hedgerow take to count fully?

The metric discounts created habitat for the years needed to reach target condition, and hedgerow takes long enough that new planting rarely closes a large shortfall on its own. Planting in advance of development helps, because the time to target condition runs from creation rather than from occupation.

Sources and further reading

hedgerow unitsbiodiversity metricbngtreestrading rulestree survey

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Trees and Arboriculture

View all →
Trees and Arboriculture7 min read

Woodland and area Tree Preservation Orders compared

The difference between an area and a woodland designation is time. One is a snapshot of what stood there; the other covers everything that grows afterwards.

Read article →
Trees and Arboriculture7 min read

Trees protected by a planning condition, not an Order

Felling a tree under a Tree Preservation Order is an offence. Felling one a condition required you to keep is a breach that can put the whole development outside its permission.

Read article →
Trees and Arboriculture8 min read

Development under a canopy and future pressure to fell

The future pressure to fell argument refuses layouts where dwellings sit too close to retained trees. What the shading evidence has to show and how separation is designed in.

Read article →
Trees and Arboriculture7 min read

Tree-lined streets and what new layouts must show

Drawing green circles on a layout does not create rooting volume. What a tree-lined street needs in section, and which constraints delete trees after permission.

Read article →
Trees and Arboriculture6 min read

Who consents works to a street tree

A tree in adopted highway land is the highway authority's to prune or fell. Where Tree Preservation Orders, conservation area notices and the consultation duty fit around that.

Read article →
Trees and Arboriculture7 min read

Hedgerow translocation and reinstatement

Translocation moves hedge stock rather than habitat. What the method statement needs, how to reinstate around a new access, and why hedgerow units cannot be traded for other habitat.

Read article →