Professionals and Qualifications

Heritage consultant competence for a statement of significance

7 min readBy PlanScope Editorial Team

No statute reserves a statement of significance to one profession. These are the registrations, research skills and review checks that separate a usable statement from a paraphrased list entry.

Heritage consultant competence is not a licensing question. No statute reserves the writing of a statement of significance to a particular profession, unlike a bat survey or a biodiversity metric. What decides whether the document works is whether its author can read a building, use an archive and separate significance from impact, and whether a conservation officer will accept their judgement.

That makes selection harder rather than easier, because the marketplace includes people with a weekend's familiarity with the National Heritage List and people who have spent twenty years on Grade I fabric. The test set out below is the one to apply before you commission.

What the statement has to establish

The National Planning Policy Framework requires an applicant to describe the significance of any heritage assets affected, including any contribution made by their setting, with the level of detail proportionate to the asset's importance and no more than is sufficient to understand the potential impact. That single sentence does most of the work, and it contains the two things weak statements get wrong.

First, significance has to be described before impact is assessed. A document that leaps to saying the proposal causes less than substantial harm, without first setting out what is significant about the building and why, gives the decision-maker nothing to weigh. Second, the assessment has to cover setting, which is a separate exercise from the asset itself.

Behind the Framework sit statutory duties. Sections 16 and 66 of the Planning (Listed Buildings and Conservation Areas) Act 1990 require special regard to the desirability of preserving a listed building, its setting and any features of special architectural or historic interest it possesses. Section 72 applies a parallel duty to the character and appearance of conservation areas. Those duties bind the authority, and the statement is what allows the authority to discharge them.

Qualifications and memberships worth asking about

There is no single badge, but there are recognised markers. Full membership of the Institute of Historic Building Conservation is the closest thing to a general conservation competence standard, awarded against defined areas of competence. On the architectural side, the RIBA conservation register distinguishes Specialist Conservation Architects, Conservation Architects and Conservation Registrants, and the Architects Accredited in Building Conservation register performs a similar function. RICS maintains building conservation accreditation for surveyors. Chartered membership of the RTPI with demonstrable heritage casework is common among heritage consultants who work mainly on planning applications rather than on fabric.

For archaeology the position is different and more formal. Membership of the Chartered Institute for Archaeologists at Practitioner, Associate or Member grade, and registration of the organisation, are what councils expect for archaeological work, and the CIfA standards and guidance documents are the benchmark against which the work is judged.

A caution about the word accredited. Several perfectly good heritage consultants hold none of these registrations and are respected by the conservation officers they deal with. Use the registrations as a filter, then look at the work.

Experience with the asset type

This is the discriminator that matters most and the one clients rarely test. Reading a medieval parish church, a 1930s cinema, a Georgian terrace, a textile mill and a post-war concrete civic building are different skills, drawing on different literature and different construction histories.

Ask for three previous Heritage Statement examples on the same asset type and grade, with the application references, so you can read the officer's report and see how the assessment was received. Ask whether any of the three went to appeal and what the inspector said about the heritage evidence. Ask who will actually write your statement, because the person who wins the work is not always the person who does it.

Grade matters too. Grade I and Grade II* proposals normally involve Historic England as a statutory consultee, and an author who has not corresponded with Historic England before will struggle with the register of that conversation.

Archive and documentary research skills

The single most common weakness in a heritage statement is that its historical section is a paraphrase of the list entry. The National Heritage List for England description exists to identify the asset, not to explain its significance, and it is frequently brief, occasionally wrong and never exhaustive. A statement built on it alone tells the officer nothing they did not already have.

Real research uses the Historic Environment Record held by the county or unitary authority, the county record office, successive editions of Ordnance Survey mapping, tithe and enclosure maps, sale particulars, deeds, trade directories, census returns and the Historic England Archive. On a building of any complexity it also uses the fabric itself: phasing observed on site, blocked openings, changes in brick bond, roof carpentry, and paint and plaster evidence.

Historic England's Advice Note 12 sets out how to analyse significance using the heritage values from its Conservation Principles, covering evidential, historical, aesthetic and communal value. A competent author will attribute values explicitly and say what evidence supports each attribution. Ask to see a sample where they have done that, rather than a sample where the values are listed as headings and filled with adjectives.

Where an archaeologist is needed instead

Three situations call for a different specialist.

  1. Below-ground archaeology. Where the site sits in an Archaeological Priority Area, near a scheduled monument or on land with recorded finds, the council will ask for an Archaeological Desk-Based Assessment prepared to CIfA standards, and that is a job for an archaeologist rather than a buildings specialist.
  2. Recording as mitigation. Where permission will be granted on condition that the building is recorded before alteration or demolition, Historic Building Recording to Historic England Levels 1 to 4 is specified, and the level determines the drawing, photographic and documentary output required. Buildings archaeologists do this work.
  3. Scheduled monument consent. That is a separate consent from the Secretary of State, outside the planning system, and it needs someone who has handled the process.

Plenty of practices cover both buildings and archaeology. The point is to check which discipline is doing which part, and to see that split reflected in the fee proposal.

Reviewing the significance assessment

When the draft arrives, work through it with a fixed checklist rather than reading for tone.

What to check What a sound statement shows
Asset identification All designated and non-designated assets, with list entry numbers and grades
Setting A staged assessment of setting following Historic England advice, with viewpoints
Significance Values attributed to specific fabric and features, with the evidence for each
Impact Impact assessed element by element against the significance already established
Harm Harm characterised as substantial or less than substantial, with reasoning
Justification Public benefits identified and weighed, or the proposal shown to be neutral

Two failure patterns recur. A statement that describes significance beautifully and then says almost nothing about impact, which leaves the officer to do the assessment. And a statement that concludes no harm arises when the drawings clearly show the loss of historic fabric, which destroys the author's credibility on everything else in the document. Where you are unsure whether the author's qualifications match the task, the general test of what competent person means in planning legislation is a useful frame.

Briefing for a listed building application

Write the brief before the fee is agreed. It should name the assets, state the grade, list the consents sought including listed building consent, and set the deliverables: the statement itself, a phasing plan, a schedule of works cross-referenced to the drawings, and any photographic record. Say who attends the pre-application meeting and who corresponds with the conservation officer, because divided responsibility there produces contradictory positions on the file.

Give the consultant the drawings early and in a form they can mark up. A heritage author who sees the scheme only when it is fixed can do nothing except describe harm, and the value of good heritage advice lies in changing the design while change still costs little. PlanScope can draft a heritage statement structured to policy for the author to develop and verify, and reviewers who can check and sign off a draft are listed in the professional directory.

Enter your postcode on PlanScope to see which heritage documents your site is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Does a heritage statement have to be written by an accredited consultant?

No statute reserves the work to a particular profession, unlike a protected species survey. Councils do expect a suitably experienced author, and registrations such as full membership of the Institute of Historic Building Conservation, the RIBA conservation register or RICS building conservation accreditation are the usual markers. Experience with the asset type matters more than any single badge.

Can I use the list entry as the history section?

No. The National Heritage List for England description exists to identify the asset, not to explain its significance. It is often brief and never exhaustive. A statement built on the list entry alone tells the officer nothing new, so proper research uses the Historic Environment Record, the county record office, historic mapping and the fabric of the building itself.

What are the four heritage values?

Historic England's Conservation Principles identify evidential, historical, aesthetic and communal value, and Advice Note 12 explains how to use them when analysing significance. A competent author attributes each value to specific fabric or features and states the evidence supporting the attribution, rather than listing the four as headings and filling them with adjectives.

When do I need an archaeologist rather than a heritage consultant?

For below-ground archaeology, where a desk-based assessment prepared to Chartered Institute for Archaeologists standards is expected; for recording as mitigation, where Historic England Levels 1 to 4 apply and a buildings archaeologist is needed; and for scheduled monument consent, which is a separate consent outside the planning system.

What statutory duties does a heritage statement help discharge?

Sections 16 and 66 of the Planning (Listed Buildings and Conservation Areas) Act 1990 require special regard to the desirability of preserving a listed building, its setting and features of special architectural or historic interest. Section 72 applies a parallel duty to conservation areas. The statement gives the authority the evidence it needs to discharge those duties.

Sources and further reading

heritagelisted buildingsstatement of significancecompetenceconservationarchaeology

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Who signs a Design and Access Statement

There is no signature block and no prescribed author for a Design and Access Statement. Article 9 of the DMPO 2015 says when one is needed and what it must explain.

Read article →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications6 min read

Whole life carbon assessment competence and scope

The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →