Trees and Arboriculture

High hedges complaints under the 2003 Act

6 min readBy PlanScope Editorial Team

Part 8 of the Anti-social Behaviour Act 2003 covers lines of evergreens over two metres, and nothing else. What the definition excludes, and what a remedial notice can and cannot require.

A high hedge complaint to the council is a last resort, and the council will send it straight back if it is not. Part 8 of the Anti-social Behaviour Act 2003 lets an owner or occupier of domestic property complain about a neighbour's hedge, but only after they have taken all reasonable steps to sort it out themselves, and only where the hedge meets a narrow statutory definition.

The definition catches fewer hedges than people expect. Start there, before spending the fee.

What counts as a high hedge

The Act defines a high hedge as a barrier to light or access formed wholly or predominantly by a line of two or more evergreen or semi-evergreen trees or shrubs, rising more than two metres above ground level.

Take that apart. Two or more, so a single tree is outside the Act however large it is. A line, so a clump or a group planted informally may not qualify. Evergreen or semi-evergreen, so beech and hornbeam are arguable because they hold dead leaves through winter, while a line of oaks is not. And more than two metres, measured from the ground level where the hedge grows, not from the complainant's side if the ground is lower there.

There is a further test. Where gaps in the hedge significantly affect its overall effect as a barrier at heights above two metres, it is not a high hedge for these purposes. A gappy leylandii line with daylight through it may fail that test even at six metres.

What the Act does not cover

Roots are not covered. Nor are overhanging branches as such, nor damage to drains, walls or foundations. Those remain civil matters, and the common law right to cut back growth to the boundary line still applies, along with the convention of offering the cuttings back to the owner.

Bamboo sits outside the Act in the ordinary case, because it is a grass rather than a tree or shrub, which is unhelpful given how much trouble it causes. Fences, walls and other structures are outside it too, since the barrier has to be formed by vegetation.

Loss of a view is not a ground of complaint. The Act is about light and access, and the council will not act on a complaint framed as the hedge spoiling an outlook. Nor does it reach hedges within the boundary of the complainant's own property, since the barrier has to be on land belonging to someone else.

The steps you must take first

The council will ask what you did before complaining, and it will want evidence of it.

Write to the hedge owner, politely, setting out what the problem is and what you would like done. Keep a copy. If there is no reply, write again. Offer to share the cost of the work, which removes the most common objection. Consider mediation, which many councils will point you to and some will part-fund.

Councils reject complaints at this stage routinely. A single conversation over the fence, unrecorded, is not all reasonable steps, and an applicant who has never made a written approach will be told to go back and do it.

Where the hedge belongs to a landlord rather than the occupier, write to both, since the freeholder is the person who can authorise the work and the tenant is the person who sees the letter.

The fee and what happens next

Councils set their own fee for a high hedge complaint, and it can run to several hundred pounds. Some refund it if the complaint succeeds, some refund part, and some do not refund at all, so check the published figure and the policy before you commit.

The council then assesses the complaint. An officer will visit, take measurements of the hedge and of the affected property, look at the orientation and the distance, and give the hedge owner the opportunity to comment. Both parties are usually asked for written representations.

The assessment is not a rubber stamp. Councils reject complaints where the hedge falls outside the definition, where the effect on the complainant's property is not sufficiently adverse, or where the complaint is judged frivolous.

How reasonable enjoyment is assessed

The statutory question is whether the hedge adversely affects the reasonable enjoyment of the complainant's property. Government guidance sets out an approach based on the geometry: the height of the hedge, its distance from the affected windows or garden, the orientation, and the resulting loss of light, measured against what a person could reasonably expect in that setting.

That last part matters. A hedge overshadowing a small north-facing garden in a dense terrace is judged against the light that garden would have had anyway. Reasonable expectation in a suburban street is not the same as in a rural plot.

Councils also weigh the hedge's contribution. Screening a busy road, providing privacy to both properties, supporting wildlife or contributing to the character of the area are all reasons a council may set the required height higher than the complainant wanted.

What a remedial notice can require

If the complaint succeeds, the council issues a remedial notice. It specifies the initial action, meaning the work needed to remedy the problem, and preventative action, meaning the ongoing maintenance needed to stop it recurring. It gives a compliance period, and it takes effect on a stated date.

Two limits apply. A notice cannot require the hedge to be reduced below two metres, and it cannot require the hedge to be removed altogether. A complainant hoping to have a leylandii screen taken out will not get that outcome through this route.

Where the hedge contains trees protected by a tree preservation order or standing in a conservation area, the tree protection legislation still applies, and separate consent is needed for work to those trees. The penalties for damaging a protected tree do not fall away because a remedial notice exists.

Appeals, enforcement and the land charge

Either party can appeal to the Secretary of State, in England through the Planning Inspectorate, within 28 days of the notice being issued. The appeal is normally decided on written representations after a site visit, and an inspector can quash the notice, vary it or uphold it.

Once the notice is operative, failure to comply is a criminal offence and the council can prosecute. It can also enter the land, carry out the work itself and recover the cost from the hedge owner.

The notice is registered as a local land charge, so it binds whoever owns the property next. That is worth knowing on both sides of the fence: a buyer's search will reveal it, and a new owner inherits the ongoing maintenance duty.

Where the dispute is really about trees on or near a boundary rather than an evergreen hedge, the questions are different, and the note on boundary trees and shared ownership covers that ground.

This is general guidance, not legal advice. High hedge procedures, fees and refund policies vary between councils, so check the published position with your own local authority before making a complaint.

Where a hedge forms part of a development proposal rather than a neighbour dispute, the tree survey and landscape strategy are the documents that deal with it, and you can draft both in minutes at PlanScope.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What counts as a high hedge?

A barrier to light or access formed wholly or predominantly by a line of two or more evergreen or semi-evergreen trees or shrubs, rising more than two metres above the ground where it grows. A single tree does not qualify however large. Nor does a hedge with gaps that significantly reduce its barrier effect above two metres.

Can I complain about hedge roots or overhanging branches?

Not under this Act, which deals only with loss of light and access caused by the hedge as a barrier. Roots, overhanging growth and damage to drains or walls remain civil matters. The common law right to cut back growth to the boundary line still applies, with the cuttings offered back to the owner.

What do I have to do before complaining to the council?

Take all reasonable steps to resolve it yourself and keep the evidence. Write to the hedge owner setting out the problem and what you want done, write again if there is no reply, offer to share the cost of the work, and consider mediation. Councils routinely reject complaints where no written approach was made.

How much does a high hedge complaint cost?

Councils set their own fee and it can run to several hundred pounds. Refund policies differ: some refund in full if the complaint succeeds, some refund part and some do not refund at all. Check the published fee and the refund policy for your own authority before submitting.

Can the council make my neighbour remove the hedge?

No. A remedial notice can require initial work to remedy the problem and ongoing preventative maintenance, but it cannot require the hedge to be reduced below two metres and it cannot require removal. Where protected trees are involved, separate consent under tree preservation law is still needed.

Sources and further reading

high hedgesneighbour disputehedgesremedial noticecommunity

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Trees and Arboriculture

View all →
Trees and Arboriculture6 min read

Woodland creation on a development site and its upkeep

New woodland is easy to draw and hard to keep alive. The planting design, the establishment regime and the legal mechanism all have to agree with each other.

Read article →
Trees and Arboriculture7 min read

Tree officer site visits and what they inspect

The officer looks at the fence line first. Here is the full checklist, the consequences of an incursion, and the site record that protects you.

Read article →
Trees and Arboriculture7 min read

The five year maintenance condition on new planting

Planting that dies within five years must be replaced in the next planting season. The obligation runs with the land and survives the sale of the house.

Read article →
Trees and Arboriculture7 min read

Tree pits, structural soils and street tree establishment

Street trees fail on soil volume, not species choice. Work backwards from the mature canopy, put the volume on the drawing, and resolve the service corridor first.

Read article →
Trees and Arboriculture7 min read

Tree roots and proximity to a public sewer or drain

Most undertakers control building and planting within around 3m of a public sewer. Resolving that against retained trees is a layout decision, not a condition to discharge later.

Read article →
Trees and Arboriculture8 min read

Ash dieback and what it changes in a tree survey

Infected ash is not automatically a category U tree. How to record crown decline and basal lesions, categorise honestly, and handle protected ash under the 2012 exemption.

Read article →