Use Classes and Change of Use

Hot food takeaway as a sui generis use

7 min readBy PlanScope Editorial Team

Since 2020 a hot food takeaway has been a sui generis use, so no permitted change reaches it. What councils ask for on extraction, noise, hours and parking.

Hot food takeaway planning permission is needed for almost every new takeaway in England, because since the Use Classes Order was amended in 2020 the sale of hot food principally for consumption off the premises has sat outside the use classes altogether. It is sui generis, a use in a class of its own. That means no permitted change gets you into it, and the flexibility that lets a shop become a cafe or an office does nothing for you.

So the application is unavoidable. What decides it is the evidence on extraction, noise, hours and parking, in that order of how often each one causes a refusal.

Why takeaways sit outside Class E

Class E gathers together shops, financial and professional services, cafes and restaurants, indoor sport, medical uses and offices, and a business can move freely between those uses without applying. Restaurants and cafes sit in that class where food and drink is mostly consumed on the premises.

Hot food takeaways were removed from that structure in September 2020 and left as a sui generis use, alongside drinking establishments, cinemas, live music venues and petrol stations.

The practical consequences follow directly:

  • A change from any Class E use to a hot food takeaway needs planning permission.
  • A takeaway cannot rely on the internal flexibility of Class E to add or drop parts of its offer.
  • Where a restaurant already has permission, increasing the takeaway element to the point where hot food is principally consumed off the premises is a material change of use. Our note on intensification of an existing use covers how officers judge that.
  • The planning unit matters. A single shop unit that is subdivided, or a takeaway operating from part of a larger premises, raises the question of what is being assessed, which our note on the planning unit works through.

Some changes out of a takeaway into Class E are permitted by Part 3 of the General Permitted Development Order, and the classes were renumbered when the Use Classes Order changed, so read the current text rather than an older summary before assuming a right exists.

The evidence a council asks for

For a unit in a parade, the pack that gets validated and determined without repeated requests usually contains:

  1. Existing and proposed floor plans showing the kitchen layout, customer area and any seating.
  2. An elevation showing the shopfront, signage and, on the rear elevation, the flue.
  3. A ventilation and extraction scheme with the odour control measures identified.
  4. An acoustic assessment of the extract fan and any external condensers.
  5. A statement of opening hours and delivery arrangements.
  6. A refuse and recycling strategy, with bin storage located on a plan.
  7. Where parking is contentious, a survey of on street capacity.

Seating is worth thinking about before submission. A takeaway with six covers is still principally an off premises operation, and adding a large seating area invites an argument that the use is really a restaurant, which changes the class and the policy tests.

Extraction, odour and noise from plant

Odour is the issue most likely to sink an application in a mixed use street, and the standard reference point for English authorities is the joint guidance on the control of odour and noise from commercial kitchen exhaust systems.

What environmental health officers look for is a scheme rather than a product list. A grease filter, then odour abatement matched to the risk, then a duct route and a discharge point taken to a height where dispersion is effective, generally at or above ridge level and away from openable windows. Where the flue has to run up a rear elevation of a listed building or through a conservation area frontage, the heritage and amenity questions collide, and that is where schemes stall.

Fan noise is assessed separately. A rating level derived under the British Standard for industrial and commercial sound, compared with the background sound level measured at the nearest noise sensitive facade, is what a Noise Impact Assessment provides. Late evening background levels matter most, because the plant runs when the street is quiet.

Put both in one document where you can. A Ventilation and Extraction Statement that describes the system, the abatement, the discharge point and the predicted noise level gives the officer everything needed for a condition rather than a refusal.

Opening hours and late night refreshment

Hours are the currency of negotiation on takeaway applications. Councils restrict them to protect residential amenity, and the restriction bites hardest between 23:00 and 05:00, which is the period the Licensing Act 2003 treats as late night refreshment.

The licensing permission and the planning permission are separate. A premises licence for late night refreshment does not authorise you to open, and a planning condition limiting hours to 23:00 cannot be overridden by a licence running to 01:00. Applications that assume one carries the other create an unusable business.

Ask for the hours you need and justify them with the operating model. Hours conditions can be varied later under section 73, and a modest trial period agreed at the start is easier to extend than a refusal is to overturn.

Parking, servicing and highway objections

Highway authorities ask three things. Where do customers stop, where do delivery riders wait, and where do supply vehicles load.

Short stay customer parking is the difficult one, because takeaway trade arrives in brief peaks. Where the parade has no lay by and the frontage is on a bus route or a set of double yellow lines, expect an objection unless you can show existing capacity. An on street survey counting available spaces through the evening peak, on a weekday and a weekend, is the evidence that answers it, and a Transport Statement is the right home for it on a small scheme.

Delivery riders have become a material consideration in their own right. A management plan covering where riders wait, how engines and radios are controlled, and who is responsible for enforcing it, addresses a concern that residents raise more often than traffic.

Health policies restricting takeaways near schools

Many local plans now include a policy restricting new hot food takeaways within a walking distance of a school, sixth form or youth facility, and some also apply a threshold based on the concentration of existing takeaways in a frontage.

The distance and the method of measuring it are set locally, so read the adopted policy rather than assuming a figure. Where a policy applies, the application has to engage with it directly. Arguments that carry weight tend to be about the operating model, opening hours that avoid the school day, or the character of the frontage as an evening destination rather than a lunchtime one.

Where the policy also applies a concentration test, count the existing units yourself against the policy definition. Officers do.

Conditions typically imposed

Expect a permission with real restrictions attached. Common conditions cover hours of opening, installation of the approved extraction and odour control scheme before the use starts, a limit on the rating level of noise from plant, approval of the flue design and materials, provision of refuse storage before first use, and in some cases a restriction on delivery vehicle movements.

Read the extraction condition closely. Where it requires the scheme to be installed and then verified as operating in accordance with the approved details, somebody has to commission the system and produce evidence, and that is a cost to programme in.

Reverting to a Class E use later

A sui generis permission does not sit dormant. If the takeaway closes and the unit stands empty, the lawful use remains the takeaway use until it is abandoned or replaced, which our note on proving a use has been abandoned explains.

For a landlord, that cuts both ways. The permission has value, because a future operator inherits it. But it also means the unit is marketed as a takeaway, and a subsequent change back into Class E may need an application depending on which rights are current.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I change a cafe into a takeaway without permission?

No. Cafes and restaurants sit within Class E while hot food takeaways are sui generis, so the change falls outside the flexibility that Class E offers. You need a full planning application, supported by extraction, odour and noise information, because those are the matters that decide most takeaway decisions.

How much seating can a takeaway have?

There is no fixed figure. The test is whether hot food is sold principally for consumption off the premises. A handful of covers is normally consistent with a takeaway use, while a substantial seating area suggests a restaurant, which sits in Class E and is assessed against different policies. Describe the split honestly on the application form.

Does a late night refreshment licence let me open later than my planning condition?

No. Licensing and planning run in parallel and neither overrides the other. If your planning permission limits opening to 23:00 and your premises licence runs to 01:00, you can only trade until 23:00. Apply to vary the planning condition under section 73 if you need longer hours.

What does the council want in an extraction scheme?

A described system rather than a product name. Grease filtration, odour abatement matched to the assessed risk, a duct route and a discharge point high enough for effective dispersion, usually at or above ridge level and away from openable windows. Fan noise is assessed separately against the measured background sound level.

Do policies restricting takeaways near schools apply everywhere?

No. They are local plan policies, so both the distance and the method of measuring it vary by authority, and some add a test based on the concentration of takeaways in a frontage. Read the adopted policy, count existing units against its own definition, and address the policy directly in your supporting statement.

Sources and further reading

use classeschange of usetakeawaysui generisenvironmental health

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Co-living schemes and what use class they fall into

Large-scale purpose-built shared living fits no class in the Use Classes Order, so it is sui generis. That shapes room sizes, affordable housing contributions and the conditions on any consent.

Read article →
Use Classes and Change of Use7 min read

Trampoline parks and indoor leisure capacity

Indoor trampoline parks usually sit in Class E(d), so the planning risk moves to restrictive conditions, structure-borne impact noise and the occupancy figure the fire strategy allows.

Read article →
Use Classes and Change of Use7 min read

Crematoria and burial grounds: use class and consents

Neither a crematorium nor a burial ground falls within any use class, so both need planning permission. A crematorium also carries statutory separation distances and an emissions permit, and a burial ground needs a groundwater risk assessment.

Read article →
Use Classes and Change of Use6 min read

Sports and social clubs: Class F2 or sui generis?

A sports and social club can sit in Class F2 as a local community facility, or outside the use classes entirely if the bar becomes the main event. The distinction decides what you can change without permission.

Read article →
Use Classes and Change of Use6 min read

Film and television studios and the use class question

Film and television production is not named in the Use Classes Order, so a studio consent turns on how the primary use is described and how the planning unit is drawn. Sound stages, set workshops and production offices can each fall differently.

Read article →
Use Classes and Change of Use7 min read

Data centres: which use class applies

Classifying a data centre is a matter of fact and degree, and the answer rarely decides the scheme. Grid capacity and plant noise do.

Read article →