Use Classes and Change of Use

Hot food takeaway or restaurant: where the line falls

6 min readBy PlanScope Editorial Team

The test is whether consumption is mostly on the premises. Get it wrong and a unit loses Class E flexibility permanently and becomes sui generis.

The takeaway vs restaurant use class question has a single legal test: whether food and drink are sold principally for consumption on the premises. If they are, the unit sits in Class E(b) of the Use Classes Order and can change to most other Class E activities without permission. If hot food is sold principally to take away, the use is sui generis, sits outside every class, and needs express planning permission every time it changes.

That line was redrawn in September 2020, when the old A3, A4 and A5 classes were swept away. Restaurants and cafes went into Class E. Hot food takeaways, pubs and drinking establishments were left outside it as sui generis uses. A great many units are now trading on the wrong side of a line their occupiers have never read.

The wording, and what "principally" means

Class E(b) covers the sale of food and drink principally to visiting members of the public where consumption is mostly undertaken on the premises. Two qualifiers do the work: principally, and mostly.

Neither is defined numerically. There is no statutory percentage, and any officer who tells you the threshold is a specific figure is describing local practice rather than law. What "mostly" requires is that the predominant character of the business is on-premises consumption, judged on the facts as they are, over a period rather than on one afternoon.

A cafe with 30 covers that also sells a few takeaway coffees is plainly E(b). A unit with two stools in the window and a stack of delivery bags by the door is plainly not. The difficult cases sit between them, and they are decided on evidence rather than on the sign above the door.

How councils assess the balance of trade

Officers and enforcement teams look at a consistent set of indicators. None is decisive alone.

  • The proportion of the floor area given to seating against counter, preparation and waiting space.
  • The number of covers and whether they are in genuine use.
  • Till records showing the split between eat-in and takeaway transactions.
  • The presence and volume of third-party delivery orders.
  • Hours of trading, particularly late evening trade after nearby restaurants have closed.
  • Servicing patterns, including moped and cycle activity outside the unit.
  • Waste volumes and the type of packaging in the bins.

Where the position is contested, till data over a representative period is the strongest evidence either side can produce. It is also the evidence most operators cannot produce retrospectively, which is why keeping it matters before anyone asks.

Why the distinction is worth money

Sui generis status removes flexibility permanently. A Class E(b) unit can become a shop, an office, a gym, a nursery or a clinic without permission. A hot food takeaway can become none of those without an application, and if it has been trading unlawfully as a takeaway from an E(b) unit, the lawful use it can fall back on is the restaurant use, not the takeaway.

Planning policy also treats the two differently. Many authorities operate policies restricting hot food takeaways within a defined distance of secondary schools, adopted on public health grounds, and some restrict concentrations of takeaways in shopping frontages. Those policies do not apply to a restaurant. An application to regularise a takeaway use in such an area can fail on policy grounds alone, regardless of how the unit is run.

Where an application is needed, the Planning Statement has to address the use class position squarely rather than describing the business generically, and the wider evidence pack for a change of use application sets out what else goes with it.

Delivery-led operations and the shift since 2020

Third-party delivery platforms have pushed many restaurants towards a trade mix their permission does not cover. A restaurant that takes half its turnover through delivery is not obviously a place where consumption is mostly on the premises, and the character of the operation, with riders waiting outside and a steady flow of collections, is what neighbours notice.

A unit operating entirely for delivery, with no public access at all, is a different animal again and has no settled class, as the note on delivery-only kitchens and which use class applies explains.

The practical advice for an operator adding delivery to a restaurant is to keep the on-premises trade real. Keep the covers, keep them usable, keep the records, and manage rider waiting so it does not become the defining feature of the frontage.

Conditions restricting the proportion of takeaway trade

Councils granting permission for a mixed operation often impose a condition to hold the balance. Typical forms include a limit on the percentage of floorspace given over to takeaway sales, a requirement that a minimum number of covers is retained and available, restrictions on the hours during which takeaway sales may occur, and a limit on the number of delivery riders waiting on the street.

Conditions of this kind have to meet the six tests in the planning practice guidance, and the ones that fail are usually those that cannot be monitored. A condition requiring that no more than a stated share of turnover comes from takeaway is difficult to enforce without access to accounts. A condition requiring a set number of covers to be retained is easy to check on a site visit, and is the one most likely to be imposed and upheld. Guidance on conditions restricting use class or occupier is worth reading before offering wording.

Offer the condition yourself, in terms you can live with. It is far better than accepting wording drafted by an officer who has not seen how the unit actually operates.

Evidence to support an application

For an application to change from E(b) to a hot food takeaway, or to regularise an existing operation, the pack normally includes:

  1. Existing and proposed floor plans showing the seating layout and the counter area.
  2. A schedule of covers, opening hours and expected trade split.
  3. An extraction scheme with a duct route, filtration specification and discharge point, supported by a Ventilation and Extraction Statement.
  4. A plant noise assessment where fans or refrigeration are proposed near homes.
  5. A servicing and delivery management plan covering rider waiting and parking.
  6. A litter and waste management commitment.

Odour is the issue that refuses most takeaway applications outside school proximity policies, and it is an engineering problem. Get the extraction designed before the application rather than offering it by condition.

Enforcement where the balance shifts

A material change of use from restaurant to hot food takeaway is a breach of planning control, and the council can serve an enforcement notice requiring the use to cease. The time limits for taking enforcement action against a change of use have been extended by the Levelling-up and Regeneration Act 2023, and which limits are in force should be checked rather than assumed.

Two things reduce the risk. Keep contemporaneous records of the trade split from the day you open, because reconstructing them later is close to impossible. And where the business model has really moved, apply rather than waiting for a complaint, because an application made voluntarily is assessed on its merits, whereas one made after a notice is negotiating from behind.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and confirm the lawful use of the unit from the planning history rather than from the previous occupier's trading style.

PlanScope can draft the planning statement, the extraction statement and the servicing plan from your unit details. Browse the report types and start a draft. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is a takeaway in the same use class as a restaurant?

No. Since the September 2020 changes, restaurants and cafes sit in Class E(b) where consumption is mostly on the premises, whereas the sale of hot food principally to take away is sui generis and outside every class. That means a takeaway needs express planning permission for any change of use.

What percentage of sales makes a unit a takeaway?

There is no statutory figure. The Order uses the words principally and mostly, and the question is decided on the facts of how the business operates over a period. Councils look at floor area given to seating, the number of covers in use, till records, delivery volumes, hours and servicing activity outside the unit.

Can a restaurant offer delivery without changing use class?

Yes, provided consumption remains mostly on the premises. Difficulty arises where delivery becomes the dominant part of the trade, because the character of the operation then looks like a takeaway. Keep the covers usable, keep records of the trade split, and manage rider waiting so it does not define the frontage.

Why do councils restrict takeaways near schools?

Many authorities have adopted local plan policies limiting new hot food takeaways within a defined distance of secondary schools on public health grounds, and some restrict concentrations within shopping frontages. These policies apply to sui generis hot food uses and not to restaurants, so the use class question decides whether the policy engages at all.

What happens if a restaurant has been operating as a takeaway?

That is a material change of use and a breach of planning control, and the council can serve an enforcement notice. Time limits for enforcement against a change of use were extended by the Levelling-up and Regeneration Act 2023, so check which limits are in force. Applying voluntarily is generally a stronger position than responding to a notice.

Sources and further reading

use classestakeawayclass esui generischange of usecommercial

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use6 min read

Film and television studios and the use class question

Film and television production is not named in the Use Classes Order, so a studio consent turns on how the primary use is described and how the planning unit is drawn. Sound stages, set workshops and production offices can each fall differently.

Read article →
Use Classes and Change of Use7 min read

Data centres: which use class applies

Classifying a data centre is a matter of fact and degree, and the answer rarely decides the scheme. Grid capacity and plant noise do.

Read article →
Use Classes and Change of Use7 min read

Repurposing a former bank branch within Class E

Former banks moved from Class A2 into Class E in 2020, so many changes need no permission. The traps are old conditions, the vault and the upper floors.

Read article →
Use Classes and Change of Use7 min read

Pharmacies: Class E(a) or Class E(e)?

Both limbs of Class E can fit a pharmacy. The primary use decides it, and the answer changes what you can do with the unit later.

Read article →
Use Classes and Change of Use7 min read

Laboratories and Class E(g)(ii) research and development

Research and development sits in Class E(g)(ii), so office to laboratory conversion often needs no change of use. The amenity test in limb (g), and the rooftop plant, are where applications are decided.

Read article →
Use Classes and Change of Use7 min read

Serviced offices and flexible workspace in Class E(g)

Co-working and managed workspace fall within Class E(g)(i) alongside conventional offices, so most changes need no application. Subdivision, a change of character and conditions restricting Class E flexibility are the exceptions.

Read article →