Liability notice and demand notice under the levy

7 min readBy PlanScope Editorial Team

A levy liability notice sets the chargeable amount and a demand notice sets the payment dates. Here is what to check on each, how instalment policies work, and where the review and appeal routes lead.

A liability notice tells you how much Community Infrastructure Levy a permission attracts. A demand notice tells you when to pay it. They arrive at different points, they carry different rights of challenge, and on a phased scheme you will see several of each. Developers lose money on the levy through timing far more often than through the rate itself, so the two notices deserve the same attention as a drawdown schedule.

What each notice does and when it arrives

The collecting authority issues a liability notice as soon as practicable after planning permission is granted, under regulation 65 of the Community Infrastructure Levy Regulations 2010. It sets out the chargeable amount, how that figure was reached, the payment procedure and the consequences of not paying.

The demand notice comes later. It follows the start of development, once the authority knows the date from the commencement notice, and it states the sums payable, the dates they fall due and the instalments if the authority has an instalment policy.

Notice When it is issued What it fixes Main challenge route
Liability notice As soon as practicable after permission is granted The chargeable amount and how it was calculated Request a review by the collecting authority, then appeal to the Valuation Office Agency
Demand notice After development starts The sums due, the due dates and instalments Factual correction with the authority, and appeals against surcharges to the Planning Inspectorate
Revised liability notice After an amendment or recalculation A replacement chargeable amount Fresh review and appeal rights run from the revised notice

Both notices are registered as a local land charge, which is why they surface on searches and why an unpaid levy follows the land.

Checking a liability notice for errors

Read the calculation, not the total. The chargeable amount is the charging schedule rate for the relevant use, applied to the net chargeable floor area, indexed in accordance with the regulations.

Four things go wrong often enough to be worth a standing check:

  • The gross internal area of the proposed development, measured from the drawings rather than the application form
  • The deduction for existing floorspace, which depends on the building having been in lawful use for a continuous period that the regulations define, so demolition dates and occupation evidence matter
  • The use attributed to each part of the scheme, where a mixed scheme straddles two rates in the charging schedule
  • The indexation figure and the year applied to it

If the authority has applied relief you claimed, check it appears on the notice. If it has not, raise it in writing immediately rather than waiting for the demand, because the review deadline runs from the liability notice.

Instalment policies and payment windows

Without an instalment policy, the whole charge falls due in a single payment a set number of days after development starts. With one, the authority publishes the thresholds, the number of instalments and the timing, usually scaled by the size of the charge.

Instalment policies vary considerably between authorities and are changed from time to time, so download the current policy rather than relying on the version you used on the last site. A policy is only available if the start of development has been properly notified, and a missed commencement notice commonly removes the right to pay by instalments altogether. That is one of the sharpest cash flow consequences in the whole regime.

An illustrative example. A scheme with a £420,000 charge under a policy offering three instalments might pay a proportion at 60 days after the start, the next at 180 days and the balance at 360 days. Lose the instalment right through a missed notice and the full sum falls due on the first date, mid-groundworks. The figures are illustrative, and the real thresholds come from the authority's published policy.

Surcharges, interest and enforcement

The regulations attach surcharges to specific failures rather than to lateness generally. Failing to assume liability, failing to notify the start of development, failing to respond to an information notice and failing to pay on time each carry their own consequence, and they can stack.

Late payment also attracts interest at a rate set in the regulations by reference to the Bank of England base rate. Beyond that, the authority can serve a levy stop notice preventing further development until payment is made, recover the debt through the courts and, in the last resort, pursue the statutory enforcement routes the regulations provide. A stop notice on a site with a funded programme is a serious event, which is why the levy belongs on the risk register alongside the section 106 obligations.

Those obligations are a separate matter from the levy, and where a scheme changes the right route may be a deed of variation under section 106A rather than anything to do with these notices.

Requesting a review or appealing

The sequence is review first, appeal second. A request for a review of the chargeable amount goes to the collecting authority within the short period stated in the notice, commonly 28 days from the date of the liability notice. The authority reviews the calculation and issues a decision.

If the figure is still wrong, the appeal on the chargeable amount goes to the Valuation Office Agency, again within a short statutory window. Appeals about apportionment between landowners also go there. Appeals against surcharges, against a deemed start date determined by the authority and against a levy stop notice go to the Planning Inspectorate.

Two practical points. The deadlines are measured in days and are stated on the notice itself, so diarise them on receipt. And an appeal on the chargeable amount is about arithmetic and the application of the schedule, not about whether the charge is fair, so an appeal that argues the rate is too high will fail.

Revised notices after an amendment

A section 73 permission is a fresh planning permission, so it brings a fresh levy calculation and a revised liability notice, with credit for the earlier permission under the regulations. A section 96A non-material amendment does not create a new permission, though a change in floor area can still prompt a recalculation.

Relief decisions can also change the picture. Where a disqualifying event occurs, such as a self-build dwelling being sold within the clawback period, the authority issues a revised notice and the levy becomes payable.

When a revised notice arrives, treat it as a new document. Review and appeal rights run from it, and the figures should be checked against the drawings as approved rather than against the original submission. For anyone building their own home, the sequencing in the self-build exemption from the levy determines whether a revised notice ever appears at all.

Cash flow planning around the levy

Treat the levy as a programmed cost with two trigger dates: the date you notify the start of works and the date each instalment falls due.

  1. Model the charge from the charging schedule before you submit, using measured gross internal areas and the existing floorspace deduction you can actually evidence.
  2. Check the authority's instalment policy and build the dates into the development appraisal.
  3. Serve the assumption of liability notice and any relief claim before anything happens on site.
  4. Serve the commencement notice and keep proof of service, because the instalment right depends on it.
  5. Reconcile the demand notice against your own model within days of receiving it.

And keep the evidence of lawful existing use. On a conversion or redevelopment, the deduction for existing floorspace is frequently the largest single variable in the calculation, and the authority will ask for proof of continuous lawful use rather than taking the applicant's word for it.

You can see which reports your scheme is likely to need and draft the supporting statements for your own review before submission.

This is general guidance, not legal advice. Check the position with your collecting authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the difference between a liability notice and a demand notice?

The liability notice is issued after planning permission is granted and states the chargeable amount and how it was calculated. The demand notice comes after development starts and states the sums payable and their due dates, including instalments. Review and appeal rights on the calculation run from the liability notice, so it is the one to check first.

How do I challenge the chargeable amount?

Request a review by the collecting authority within the period stated on the liability notice, commonly 28 days from its date. If the figure remains wrong, appeal to the Valuation Office Agency within the statutory window. The appeal is about the calculation and the application of the charging schedule, not about whether the rate itself is reasonable.

Can I pay the levy in instalments?

Only if the charging authority has adopted an instalment policy and you have properly notified the start of development. Policies set their own thresholds, number of instalments and timing, and they change, so download the current version. A missed commencement notice commonly removes the instalment right and makes the whole sum fall due at once.

Does a section 73 permission trigger a new levy charge?

Yes. A section 73 permission is a fresh planning permission for levy purposes, so the authority recalculates and issues a revised liability notice, with credit for the earlier permission as the regulations provide. A section 96A non-material amendment does not create a new permission, although a change in floor area can still prompt a recalculation.

What happens if the levy is not paid?

Surcharges and interest apply, calculated under the regulations by reference to the Bank of England base rate for interest. The authority can also serve a levy stop notice halting further development until payment, and recover the debt through the courts. The charge is registered as a local land charge, so it follows the land and shows up on searches.

Sources and further reading

community infrastructure levycilliability noticedemand noticedeveloper contributionscash flow

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary7 min read

Competent person: who the law accepts for which report

Six planning report types carry a statutory competence requirement. Many more only expect a suitably qualified author. The difference changes who can sign and what happens if they cannot.

Read article →
Glossary7 min read

Betterment in highway terms: what a section 278 delivers

A section 278 agreement lets a developer pay a highway authority to improve the existing highway, but only where the authority is satisfied the public benefits. Here is how it is secured and programmed.

Read article →
Glossary6 min read

Exceedance route: where water goes when the system fills

Every drainage system has a capacity, and water above it has to go somewhere. An exceedance route is the designed overland path, and it is a levels exercise before it is a pipe exercise.

Read article →
Glossary6 min read

Receptor: who and what an assessment protects

Receptor is the third term in the source-pathway-receptor chain, and every discipline defines it slightly differently. Getting the list right is what makes the rest of an assessment defensible.

Read article →
Glossary7 min read

Reasonable worst case: what it means in assessment

An outline or parameter-based scheme still has to be assessed against something definite. Reasonable worst case is how that is done, and the parameters you fix decide whether the assessment holds.

Read article →
Glossary7 min read

Severance: when one permission cannot be built in parts

A planning permission is normally a permission for the whole development, not a set of independent parts. Here is what severance means, where the rule comes from, and how to check the position for a part-built site.

Read article →