Wales, Scotland and Northern Ireland

Local place plans in Scotland and what they change

7 min readBy PlanScope Editorial Team

The Planning (Scotland) Act 2019 gave communities a statutory route to set out proposals for land in their area. Registration matters, and so does the timetable.

A local place plan in Scotland is a proposal by a community body about the development and use of land in its area, prepared by the community itself and registered with the planning authority. The right was created by the Planning (Scotland) Act 2019, which inserted the local place plan provisions into the Town and Country Planning (Scotland) Act 1997, with the detailed requirements set in regulations that took effect in January 2022. Nothing quite like it exists elsewhere in the UK.

What it changes is real but narrower than most community groups expect when they start. Understanding the limit before you spend two years on one is the point of this article.

This article covers Scotland only.

What a local place plan is and who can prepare one

A local place plan sets out what a community thinks should happen to land in its area: where new housing might go, which buildings should be reused, where open space should be protected, what the high street needs.

Two kinds of body may prepare one. A community council for the area, or a community-controlled body as defined in Scottish legislation of 2015 on community rights and asset transfer, which covers most constituted community trusts and development companies.

The plan itself has to do four things. Identify the land it covers, on a map. Set out proposals for the development or use of that land. Have regard to the local development plan and to the National Planning Framework. And show that the community has been involved in preparing it.

That last requirement is substantive rather than a formality. A plan produced by six people in a committee room, with no evidence of wider engagement, is at risk at registration and carries little weight afterwards even if registered.

The registration process and its requirements

You submit the plan to the planning authority, which registers it if the statutory requirements are met. Registration is the step that gives the document its status.

The requirements to watch:

  • Consultation with the community councils whose areas the plan covers, and with the councillors for the relevant wards, before submission.
  • Evidence of community engagement, which most authorities expect to see summarised in the plan itself.
  • A map that is legible, correctly referenced and covers a defined area rather than a vague neighbourhood.
  • Regard to the local development plan and the National Planning Framework, shown by reference rather than asserted.

The authority can decline to register a plan that does not meet the requirements. Where it does, ask for the reasons in writing and fix the defect, because most refusals are procedural rather than about the content.

Timing is the constraint people miss. A local place plan influences the next local development plan, so it needs to land before the authority is drafting it. Authorities publish an invitation and a timetable for local place plans as part of their development plan scheme. Check that timetable at the start and work backwards from it.

How a registered plan feeds into the local development plan

Once registered, the plan goes on a register the authority keeps and publishes, and the authority must take it into account in preparing the local development plan.

Take into account is not the same as adopt. The authority weighs the plan against its evidence base, national policy, the housing land requirement and everything else it must consider, and it may conclude that a proposal in the local place plan cannot be carried into the development plan. It should explain why.

Where a local place plan proposal is carried into the local development plan, it acquires real force, because the local development plan is part of the statutory development plan alongside National Planning Framework 4. That is the prize, and it is why the timetable matters more than the length of the document.

An example of how another Scottish policy area works in practice, showing the weight a plan policy carries once adopted, is set out in our note on flood risk under NPF4 and the avoidance principle.

Weight in decisions on applications

This is where expectations and reality diverge most sharply.

A registered local place plan is not part of the statutory development plan. Section 24 of the 1997 Act defines the development plan as the National Planning Framework and the local development plan, and a local place plan is neither.

It can be a material consideration. A planning authority determining an application may have regard to a registered local place plan, and reporters on appeal have been willing to consider them. The weight given will depend on how recent it is, how well evidenced, how widely the community was involved, and how closely it addresses the particular site.

So a registered plan is useful in an objection, and it is not a trump card. Cite it as a material consideration, say when it was registered, point to the specific proposal or policy it contains that bears on the application, and explain the evidence behind that proposal. A general reference to the existence of the plan achieves very little.

Document Status in a Scottish decision
National Planning Framework 4 Part of the statutory development plan
Local development plan Part of the statutory development plan
Registered local place plan Material consideration, weight depends on the circumstances
Unregistered community plan Material consideration at most, and weaker

Support available to community bodies

Preparing a plan needs mapping, writing, engagement and a certain amount of persistence. Scottish Government funding has been made available at various points to support community bodies through the process, and planning authorities publish their own guidance on what they expect.

Start by asking the authority's planning policy team three questions. What is the timetable for local place plans feeding into the next local development plan. What format and mapping do they want. And is there a template or checklist they would prefer you to use.

Authorities generally welcome the contact. A plan prepared in conversation with the policy team is more likely to be registered and more likely to be carried forward than one that arrives unannounced.

Common difficulties in preparation

Five recur.

  1. Scope creep. A plan that tries to cover transport, health services and school provision alongside land use loses focus, and the parts outside planning cannot be carried into a local development plan at all.
  2. Weak engagement evidence. Record everything: leaflet drops, drop-in sessions, survey responses, the numbers who attended and what they said.
  3. Mapping. Communities underestimate the work of producing a clear map with a defined boundary, and authorities have been known to send plans back over it.
  4. Proposals with no evidence behind them. Identifying a site for housing without any consideration of access, flooding, services or ownership invites the authority to set it aside.
  5. Missing the timetable. A plan registered after the local development plan has been submitted for examination has missed the cycle it was aiming at.

One honest uncertainty. Because the regime is still young, there is limited experience of how much weight reporters give registered plans in individual appeal decisions. Read recent decision letters for your authority rather than relying on general statements.

Checking whether one covers your area

Planning authorities publish a register of local place plans, normally on the development plan pages of their website. Search for the register rather than for the plan, because an individual plan may be held as an appendix.

If one covers your area, read it before objecting to an application or responding to a plan consultation. If none does and you are thinking about preparing one, look at the authority's development plan scheme first for the timetable, then talk to your community council.

Communities in other parts of the UK have different routes into the process, and the appeal structure in Northern Ireland, covered in our note on appeals to the Planning Appeals Commission, is one example of how differently the nations are organised.

PlanScope's drafting is grounded in English national policy and English local plans, so any Scottish application needs the reviewer to check National Planning Framework 4 and the relevant local development plan. Browse the full set of report types to see which supporting documents a scheme is likely to need.

This is general guidance, not legal advice. Check the position with your planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Who can prepare a local place plan?

A community council for the area, or a community-controlled body as defined in Scottish legislation of 2015 on community rights, which covers most constituted community trusts and development companies. The plan must show that the wider community was involved in preparing it, and that evidence is examined at registration.

Does a registered local place plan form part of the development plan?

No. Section 24 of the Town and Country Planning (Scotland) Act 1997 defines the development plan as National Planning Framework 4 together with the local development plan. A registered local place plan can be a material consideration in a decision, with weight depending on how recent, well evidenced and site-specific it is.

What does registration achieve?

A registered plan goes on a public register kept by the planning authority, and the authority must take it into account when preparing the local development plan. Where a proposal is carried into the local development plan it acquires real force, because that plan is part of the statutory development plan.

Can a planning authority refuse to register a plan?

Yes, where the statutory requirements are not met. Most refusals are procedural: missing consultation with community councils and ward members, inadequate evidence of engagement, an unclear map, or no demonstration that the plan has had regard to the local development plan and the National Planning Framework.

When should a local place plan be submitted?

Before the planning authority is drafting its next local development plan. Authorities publish an invitation and a timetable as part of the development plan scheme, and a plan registered after the local development plan has gone for examination has missed the cycle. Check that timetable first and work backwards.

Sources and further reading

scotlandlocal place plancommunitydevelopment planplanning scotland act 2019

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Wales, Scotland and Northern Ireland

View all →
Wales, Scotland and Northern Ireland7 min read

Householder permitted development in Northern Ireland

Extensions, outbuildings and dormers in Northern Ireland are governed by the Planning (General Permitted Development) Order (Northern Ireland) 2015, not the England Order. The differences are substantive.

Read article →
Wales, Scotland and Northern Ireland7 min read

The two tier planning system in Northern Ireland

Eleven councils determine most applications and the Department for Infrastructure takes the regionally significant ones. The category decides the consultation, the decision-maker and the appeal route.

Read article →
Wales, Scotland and Northern Ireland7 min read

Notification of planning applications to Scottish Ministers

Notification bites after a Scottish authority has decided to approve, not before. The categories that trigger it, what happens during the pause, and why withdrawing a statutory objection is the whole game.

Read article →
Wales, Scotland and Northern Ireland7 min read

The hierarchy of developments in Scotland explained

In Scotland the development category decides whether you must consult the community twelve weeks before applying, how long determination takes and where an appeal goes. Here is how to work out which category applies.

Read article →
Wales, Scotland and Northern Ireland7 min read

Listed building consent in Scotland: categories A, B and C

Scotland grades listed buildings A, B and C, protects interiors as standard and still requires a separate conservation area consent for demolition. Here is how the consent works and who must be consulted.

Read article →
Wales, Scotland and Northern Ireland7 min read

NPF4 and the climate and nature tests in Scotland

In Scotland, National Planning Framework 4 is part of the development plan rather than a material consideration. That changes how a supporting statement has to be built.

Read article →