Use Classes and Change of Use

Losing a community facility and the policy tests

7 min readBy PlanScope Editorial Team

Applications to redevelop a village hall or local shop turn on marketing, viability and replacement provision. Those tests are evidential, and the evidence can be checked.

When a village hall, scout hut, swimming pool or corner shop is proposed for housing, the loss of community facility planning policy in the adopted local plan is usually what decides the application. Almost every plan in England carries a policy resisting the loss of community facilities unless three things are shown: that the facility is surplus or unviable, that it has been properly marketed, and that any replacement provision is equivalent or better. Those are the tests to argue about, and they are evidential rather than emotional.

National policy sits behind them. The Framework's healthy and safe communities chapter expects policies and decisions to guard against the unnecessary loss of valued facilities and services, and to ensure that established shops, facilities and services can develop and modernise and are retained for the benefit of the community.

What local policies actually protect

Read the policy before anything else, because the scope varies. Some policies protect a defined list of named facilities. Others protect any building or land in community use, which can extend to a privately owned nursery or a commercial gym. Others are limited to facilities in specified settlements or to those the plan describes as important to the rural community.

Use classes matter here because they set the baseline. Halls and meeting places for the principal use of the local community sit in Class F2 of the Use Classes Order 1987 as amended in 2020, along with small local shops meeting the size and distance conditions, outdoor sport and recreation areas, and swimming pools and skating rinks. Schools, libraries, museums, public halls and places of worship sit in Class F1. Public houses and drinking establishments are sui generis, so a pub cannot change to anything else without permission.

Open space and playing fields have their own protection in the Framework, which allows their loss only where an assessment shows a surplus, where the loss is replaced by equivalent or better provision in a suitable location, or where the development is for alternative sport and recreation provision whose benefits clearly outweigh the loss. Sport England is a statutory consultee for development affecting playing fields, and an Open Space Assessment is the usual way the surplus question is answered.

Marketing evidence and the usual periods

Marketing is where most of these applications are won and lost. Policies commonly require a continuous marketing period, often six months and sometimes twelve, through a named agent, at a price or rent that reflects the existing community use rather than a residential development value.

The details are worth examining closely.

  • Was the property marketed for its existing use, or only as a development opportunity?
  • Was the asking price evidenced against comparable community premises, or set at residential land value?
  • Was there a board on site, a listing with the relevant trade bodies, and a record of enquiries with dates and outcomes?
  • Was the marketing continuous, or a series of short bursts adding up to the stated period?
  • Were community groups or the parish council approached directly?

Marketing at a price no community organisation could pay is the standard way a policy test is defeated in form while being failed in substance. Objectors who obtain the marketing particulars and set them against the asking prices of comparable premises often do more damage to an application than a hundred signatures.

Viability evidence and its limits

Applicants frequently submit trading accounts to show the facility loses money. That evidence is relevant, and it is narrower than it looks.

Accounts show that one operator, running the facility in one way, at one point in the economic cycle, did not make it pay. They do not show that the facility is not needed, that no other operator could run it, or that a community trust with volunteer labour and grant funding could not. Where a policy asks whether the facility is viable, the honest question is whether the use is viable, not whether the current business was.

Look for what is missing. A hall with no website, no online booking and hours that suit nobody with a job has not been tested. Where accounts are submitted, ask whether they are audited, which years they cover, whether the property carried an inflated internal rent, and whether the operator was also the applicant for the housing.

Alternative provision and equivalence

Where replacement is offered, equivalence is judged on more than floor area. Quality, accessibility by foot and public transport, hours of availability, hire cost, parking, storage for equipment and the ability to host the existing user groups all count.

Test What to examine
Quantity Floor area, pitch size, capacity for the largest existing user
Quality Condition, heating, acoustics, kitchen and WC provision, accessibility
Location Walking distance, bus routes, safety of the route for children
Availability Hours, competing bookings, hire charges, security of tenure
Timing Whether the replacement is open before the existing facility closes

That last row is the one to press. An offer to provide a new hall at some point after the housing is built, secured by a planning obligation with a long trigger, leaves the community with nothing for years. Ask for the replacement to be delivered and open before the existing facility closes, and for the obligation to say so.

Assets of community value and neighbourhood plans

Listing a building as an asset of community value under the Localism Act 2011 gives a community group a moratorium in which to prepare a bid if the owner decides to sell. It is worth doing, and it is important to be clear about what it does not do. It does not prevent a sale to anyone else after the moratorium, it does not prevent development, and it does not stop planning permission being granted. It is a material consideration, and it is evidence that the community values the facility, which is a different and lesser thing than protection.

Neighbourhood plans carry more weight. Once made, a neighbourhood plan forms part of the development plan for the area under section 38(6) of the Planning and Compulsory Purchase Act 2004, so a neighbourhood plan policy protecting a named community facility applies with the same legal force as a local plan policy. Communities facing repeated loss of facilities should be putting policies into a neighbourhood plan rather than fighting each application on its own.

Objecting effectively on loss grounds

Evidence beats sentiment. The representations that change officer recommendations contain a bookings diary, membership numbers with dates, photographs of the facility in use, a list of the groups that meet there and the alternatives they have investigated, and a clause-by-clause response to the marketing and viability evidence.

Say which policy is breached and why, by policy number. Ask the case officer whether the application will be determined under delegated powers or by committee, and if delegated, ask your ward councillor to request that it goes to committee. Where the applicant argues the community use has stopped, the legal position on whether a use has been lost is a question of fact and degree, set out in the guide to proving a use has been abandoned.

And read the application's own Planning Statement closely. Applicants often concede more in their own documents than objectors notice.

Where a change needs no permission at all

Some changes fall outside the planning system entirely, and objecting is then pointless. Movements within a use class are not development, so a community hall in Class F2 can change to another use within Class F2 without permission. Part 3 of the General Permitted Development Order also contains permitted changes out of some commercial and community classes, and that Part has been amended repeatedly, so the current text of the Order is what governs.

One thing is clear. There is no permitted development right that turns a community hall into housing, so that change always needs planning permission and the local plan policy always applies. Where the argument is about what the lawful use of the building actually is, the boundaries of the relevant planning unit decide the answer before any policy test is reached.

Enter your postcode on PlanScope to see which documents an application affecting a community facility would need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Which use class is a village hall?

A hall or meeting place for the principal use of the local community falls within Class F2 of the Use Classes Order 1987 as amended in 2020. Class F2 also covers small local shops meeting the size and distance conditions, outdoor sport and recreation areas, and swimming pools and skating rinks. Public halls and exhibition halls sit in Class F1 instead.

How long must a community facility be marketed before it can be redeveloped?

The period comes from the adopted local plan rather than from national policy, and it is commonly six months, sometimes twelve. The policy will usually also require marketing through a named agent at a price reflecting the existing community use. Check whether the marketing was continuous and whether community groups were approached directly.

Does listing a building as an asset of community value stop development?

No. Listing under the Localism Act 2011 gives a community group a moratorium in which to prepare a bid if the owner decides to sell. It does not prevent a sale after the moratorium, does not prevent development and does not stop permission being granted. It is a material consideration and evidence that the community values the facility.

Can a community hall be converted to housing under permitted development?

No. There is no permitted development right that turns a community hall into housing, so the change always needs planning permission and the local plan policy protecting community facilities applies. Movements within Class F2 are a different matter, because a change from one use in the class to another is not development.

What makes an objection on loss of a community facility effective?

Evidence rather than sentiment. Include a bookings diary, membership numbers with dates, photographs of the facility in use, the groups that meet there and the alternatives they investigated, plus a clause-by-clause response to the applicant's marketing and viability evidence. Cite the policy number breached and ask your ward councillor to request committee determination.

Sources and further reading

community facilitiesuse classesclass f2objectionsmarketing evidenceneighbourhood plan

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Co-living schemes and what use class they fall into

Large-scale purpose-built shared living fits no class in the Use Classes Order, so it is sui generis. That shapes room sizes, affordable housing contributions and the conditions on any consent.

Read article →
Use Classes and Change of Use7 min read

Trampoline parks and indoor leisure capacity

Indoor trampoline parks usually sit in Class E(d), so the planning risk moves to restrictive conditions, structure-borne impact noise and the occupancy figure the fire strategy allows.

Read article →
Use Classes and Change of Use7 min read

Crematoria and burial grounds: use class and consents

Neither a crematorium nor a burial ground falls within any use class, so both need planning permission. A crematorium also carries statutory separation distances and an emissions permit, and a burial ground needs a groundwater risk assessment.

Read article →
Use Classes and Change of Use6 min read

Sports and social clubs: Class F2 or sui generis?

A sports and social club can sit in Class F2 as a local community facility, or outside the use classes entirely if the bar becomes the main event. The distinction decides what you can change without permission.

Read article →
Use Classes and Change of Use6 min read

Film and television studios and the use class question

Film and television production is not named in the Use Classes Order, so a studio consent turns on how the primary use is described and how the planning unit is drawn. Sound stages, set workshops and production offices can each fall differently.

Read article →
Use Classes and Change of Use7 min read

Data centres: which use class applies

Classifying a data centre is a matter of fact and degree, and the answer rarely decides the scheme. Grid capacity and plant noise do.

Read article →