Matching roof tiles when the original is unavailable

8 min readBy PlanScope Editorial Team

A concrete interlocking tile beside a clay plain tile roof reads wrong whatever the colour. Profile, lap and unit size are what a case officer actually sees.

When the original roof tile is no longer made, the way to match a roof is to match its profile and texture first and its colour second. A concrete interlocking tile in roughly the right shade next to a clay plain tile roof reads as a different building, because the shadow lines, the lap and the unit size are all wrong. Get the profile right and a slight difference in colour weathers out within a few seasons.

That matters whether or not an application is needed. Permitted development under Class A of Part 1 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 carries a condition that the materials used in any exterior work must be of similar appearance to those used in the existing house. A visibly mismatched roof is a breach of that condition, not merely an aesthetic misjudgement.

Why tile profile matters more than colour

A roof covering has three characteristics the eye reads from the street: the size of the unit, the depth of shadow between courses, and the surface texture. Colour comes fourth.

Plain tiles are small, laid double lap, and give a fine grain with a dense pattern of horizontal shadow lines. Interlocking tiles are much larger, laid single lap, and produce long continuous shadow lines with a visible roll or flat pan. Pantiles give a strong S-curve. Slate gives flat, thin courses with crisp edges and almost no relief.

Put any two of those next to each other and the difference is obvious at 30m, whatever the colour. That is why a case officer looking at a photograph of a rear extension will comment on an interlocking tile against plain tiles and say nothing about a plain tile two shades lighter than the original.

Clay plain tiles against concrete interlocking

The practical choice on most Victorian and Edwardian houses is between clay plain tiles and a concrete interlocking tile that costs considerably less and lays faster.

Two technical points limit the substitution. Plain tiles need a steep pitch, generally around 35 degrees as a minimum for standard double lap work, while interlocking tiles are designed to work at much shallower pitches. So a shallow single storey rear extension roof cannot take plain tiles at all without a different detail.

The second is weight and batten spacing, which is a structural question rather than a planning one but drives the design. A plain tile roof is heavier per square metre than most interlocking roofs, and on an extension tied into an existing structure that difference has to be accounted for.

Where the main house has plain tiles and the extension roof pitch is too shallow for them, the honest answers are to raise the pitch, to use a different covering that is clearly of its own kind such as standing seam metal or a single ply membrane on a flat roof, or to accept a sympathetic substitute and explain the reasoning. What rarely succeeds is a concrete tile pretending to be a plain tile.

Reclaiming tiles from the original slope

The best match for an old roof is the old roof. Where an extension removes part of an existing slope, or where a rear outrigger is being raised, strip and set aside the sound tiles and relay them on the elevation that matters most.

The method is straightforward. Strip carefully, sort into sound, reusable and broken, use the reclaimed tiles on the most visible slope, and cover the less visible slope with new tiles of matching profile. On a terrace this usually means reclaimed tiles to the front or to whichever slope is seen from the street, and new tiles to the rear.

Expect losses. Hand-stripping a clay plain tile roof laid a century ago typically yields a usable proportion well short of the whole, and old nibs break. Order the new tiles knowing that, and keep a small stock for repairs.

Reclaimed tiles bought in rather than salvaged from the house carry two risks worth stating: inconsistent frost resistance in tiles of unknown age, and provenance. Ask where they came from.

Verge, ridge and valley details

Details give away a roof faster than tiles do. Three are worth specifying rather than leaving to the roofer.

The verge, where the roof meets the gable, was traditionally bedded in mortar with an undercloak, sometimes with a tile-and-a-half course. A plastic dry verge system on a Victorian terrace is immediately visible and frequently the subject of a condition requiring removal. If a dry system is used for durability, choose one with a low profile in a dark colour.

The ridge changes the silhouette. Half-round ridge tiles sit differently from angular or hogback ridges, and swapping one for the other on part of a roof is noticeable along a whole street. Match what is there.

Valleys are where plain tile roofs show their quality. A swept or laced valley is the traditional detail on clay plain tiles and is expensive. A lead-lined open valley is simpler and acceptable in most settings. A GRP valley trough on a prominent front roof slope will be commented on.

Slate: natural, Spanish and fibre cement

Slate roofs are easier to match in profile and harder to match in character. Natural slate varies in colour, thickness and surface between quarries, and the difference between a Welsh slate and an imported slate of the same nominal size is visible in texture and in how the roof ages.

Three practical points. Match the size as well as the material, because slate sizes vary and a change in course height alters the proportions of the whole slope. Fibre cement slates are flat, uniform and thinner at the edge, and read as a modern material at close range, which makes them a reasonable choice on a rear extension and a poor one on a street elevation in a conservation area. And on a listed building, slate substitution is a matter for listed building consent in its own right, supported by a Heritage Statement describing the existing covering and the effect of the change.

Where a different tile is acceptable

There are situations where matching is the wrong objective. A clearly contemporary extension with a flat roof, a zinc or standing seam covering, or a glazed roof, is not trying to match and should not pretend to. Officers generally accept a frank difference more readily than a poor imitation.

The cases where a different covering is usually accepted:

  • Rear single storey extensions not visible from the street.
  • Flat or shallow-pitched roofs where the original covering is technically unsuitable.
  • A designed contrast on a contemporary addition, explained in the Design and Access Statement rather than left for the officer to interpret.
  • Roofs behind a parapet where the covering is not visible at all.

The cases where it is usually refused are front roof slopes, roofs in a conservation area visible from a public vantage point, and anything on a listed building. Where an Article 4 direction applies, the permitted development route may not be available either, and replacing windows where an Article 4 direction applies explains how those directions work.

An illustrative example

A 1900s terrace has a rear outrigger being raised to create a larger bathroom, with the main roof in clay plain tiles. The original tile pattern is no longer manufactured. The builder strips the outrigger slope, salvages enough sound tiles to cover the new rear slope facing the garden, and uses a current clay plain tile of the same nominal size on the small side slope that is not visible from the lane. The verge is mortar bedded with a tile-and-a-half course to match the existing. This example is illustrative and not a specification for any particular house.

Discharging the roofing materials condition

Where permission has been granted with a condition requiring materials to be approved, make the submission easy to approve. Councils discharge these quickly when the evidence is specific.

What works:

  1. The manufacturer, product name and reference for each covering, with the nominal size.
  2. A photograph of the proposed tile alongside the existing roof, taken in daylight, not a product brochure image.
  3. A note of which slopes receive reclaimed tiles and which receive new.
  4. The verge, ridge and valley details named, with a sketch where the detail is unusual.
  5. Where a sample panel is offered, say where it will be built and invite inspection.

Submit before the roof goes on. A condition discharged retrospectively after a mismatched roof is complete leaves the council with a choice between accepting something it refused and asking for the roof to be redone, and neither conversation goes well. The same discipline applies to wall finishes, as the materials condition on render and cladding sets out.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and remember that a Lawful Development Certificate is the only formal way to confirm that works are lawful.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Enter your postcode on PlanScope to see which reports your extension is likely to need.

Frequently asked questions

Do extension roof tiles have to match the house?

Under Class A of Part 1 of Schedule 2 to the GPDO 2015, materials used in exterior work must be of similar appearance to those on the existing house. That is a condition of the permitted development right, so a visibly mismatched roof puts the works outside it. On a full application the same point is usually conditioned.

Can I use concrete tiles on a plain tile roof extension?

It is usually resisted where the extension is visible, because the unit size, lap and shadow lines differ. Pitch is the practical constraint: plain tiles generally need around 35 degrees or more, so a shallow extension roof cannot take them. Raising the pitch or using a frankly different covering is often the better answer.

How many tiles survive being stripped and relaid?

Fewer than most people assume. Old clay plain tiles lose nibs and break during hand stripping, so expect a usable proportion well short of the whole roof. Use the salvaged tiles on the most visible slope and new matching tiles elsewhere, and keep a small stock back for future repairs.

Are dry verge systems acceptable?

On a modern estate house, generally yes. On a Victorian or Edwardian terrace a plastic dry verge is immediately visible and is sometimes the subject of a condition requiring a mortar bedded verge with an undercloak instead. If durability points to a dry system, choose a low profile one in a dark colour.

What should I submit to discharge a roofing materials condition?

The manufacturer, product name, reference and nominal size for each covering, a daylight photograph of the proposed tile against the existing roof rather than a brochure image, a note of which slopes take reclaimed tiles, and the verge, ridge and valley details. Submit before the roof is laid.

Sources and further reading

roof tilesmaterials conditionextensionconservation areaplain tilesslate

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Householder Extensions and Conversions

View all →
Householder Extensions and Conversions7 min read

Counting back to the original dwellinghouse

Previous owners' extensions eat into your allowance, and conservatories count. Here is how the original dwellinghouse baseline is fixed and proved.

Read article →
Householder Extensions and Conversions7 min read

Householder applications where Article 4 applies

An Article 4 direction withdraws a permitted development right, it does not ban the work. Here is how to read the schedule and apply without a fee.

Read article →
Householder Extensions and Conversions7 min read

Decking and raised platforms in a garden

The 300 millimetre raised platform threshold decides whether garden decking needs permission. Here is how it is measured and what an application must show.

Read article →
Householder Extensions and Conversions7 min read

Replacing windows: when it is development at all

A like for like window swap is usually not development. Changing material, opening pattern or glazing bars can be, and flats and listed buildings follow different rules.

Read article →
Householder Extensions and Conversions7 min read

Dormer windows on a front roof slope

Class B of Part 1 excludes work extending beyond a roof slope that forms the principal elevation and fronts a highway. Both limbs must apply, so a few front slopes can still take a dormer.

Read article →
Householder Extensions and Conversions7 min read

Annexes for a dependent relative and the planning unit

An annexe for a relative is lawful as part of the house while it remains ancillary. Access, kitchen provision, garden division and separate services decide whether a second planning unit has been created.

Read article →