Viability, Obligations and Commercial

Meanwhile use and its effect on benchmark land value

8 min readBy PlanScope Editorial Team

Interim income rarely moves benchmark land value as much as developers expect, and it can cost you the vacant building credit. What to evidence, and how to structure the occupation.

Putting a meanwhile use on a site you intend to redevelop changes your viability position, and not always in the direction you expect. Benchmark land value in national guidance is existing use value plus a premium, and existing use value is the value of the land in its current lawful use. A temporary use generating rent looks like it should lift that value. Sometimes it does. Often the income is too short-dated and too expensive to run to move the number much, and the real effects are elsewhere: on the vacant building credit, on how a council reads the site, and on what an objector can argue when you come back for the permanent scheme.

Meanwhile use land value arguments are worth getting straight before the first licence is signed, because the lease structure you choose is hard to unwind later.

What counts as a meanwhile use

A meanwhile use is an interim occupation of land or buildings pending redevelopment: container workspace, a pop-up food yard, surface car parking, storage, a community garden, film production, sports pitches. The defining features are a short term, a low capital fit-out and an exit that does not depend on the occupier's goodwill.

The consent route varies. Some uses fit within permitted development for temporary use of land, which allows use for any purpose for not more than 28 days in a calendar year, reduced to 14 days for markets and for motor car and motorcycle racing, and which does not authorise buildings. Film-making has its own longer temporary right with conditions attached. Anything beyond that needs a temporary planning permission, usually a full application with a condition limiting the period and requiring reinstatement.

Read the permitted development text before relying on it. The day counts are cumulative across the year and they are counted per parcel of land, which trips up sites running several events.

Whether it changes existing use value

Start from what existing use value means. It is the value of the land in its existing lawful use, disregarding the prospect of the development being applied for. It is not the price paid, and hope value is excluded. Where a site is vacant and derelict, existing use value is low, sometimes nil once holding costs are counted.

A temporary use can raise it, on two conditions. The income has to be real and net of the cost of earning it. And the use has to have a term the valuer can capitalise.

Both conditions fail more often than not. The costs of running a meanwhile use are not small: business rates, insurance, security, site management, utilities, the capital cost of the fit-out, and the cost of decommissioning at the end. A gross rent roll that looks like a yield turns into a thin net figure. Then the term: a licence terminable on a month's notice has almost no capital value, because a purchaser buys the right to receive income only for as long as it is contractually certain.

So the honest valuation position is usually that a meanwhile use produces a modest uplift in existing use value, supported by net income over a stated term, rather than a step change. Where a developer argues otherwise, expect the authority's valuer to ask for the management accounts.

Question the valuer asks What to provide
Is the use lawful Temporary permission or the permitted development basis, with dates
What is the net income Two years of accounts, or a budget with named cost lines
How long is it contractually certain Executed licences or leases, showing term and break provisions
What does exit cost Decommissioning estimate, dilapidations position
Is the income transferable Whether a purchaser could step into the arrangements

The vacant building credit trap

This is the point most often missed. The vacant building credit in national policy reduces affordable housing contributions where a vacant building is brought back into use or demolished and replaced. It depends on the building being vacant, and authorities look at whether a building has been brought into occupation deliberately to create or preserve an advantage.

Put a meanwhile use into an empty building and you may lose the credit, or at least hand the authority an argument that the building was not vacant at the relevant date. On a scheme where the credit is worth more than two years of interim rent, that is a bad trade. Work out both numbers before signing anything, and set the affordable housing position out properly in the Affordable Housing Statement rather than leaving it to the appraisal narrative.

Lease structures that protect the redevelopment

Three principles, in order of importance.

Exclude security of tenure. Business tenancies attract protection under the Landlord and Tenant Act 1954 unless the parties contract out by the statutory procedure, or the term certain is short enough to fall outside the protection. A meanwhile use occupier with security of tenure is a planning problem that turns into a litigation problem.

Use licences where occupation is shared, and leases where it is exclusive. Labelling exclusive occupation a licence does not make it one, and a badly drafted licence can be construed as a lease with all the consequences that follow.

Keep the term shorter than your programme and renew it. Rolling short arrangements cost more in management time and give you an exit that matches reality. Build in a landlord break tied to the grant of planning permission, not to a fixed date, so the trigger is the event you actually care about.

Document reinstatement obligations and take a deposit for them. Condition compliance at the end of a temporary permission is your liability, not the occupier's, unless the paperwork says so.

What councils think about temporary consents

Authorities have become more willing to grant temporary permissions on stalled sites, partly because an active frontage beats hoardings and partly because meanwhile uses support town centre policy aims. What they are cautious about is any temporary use that could become permanent or that creates a constituency.

Three practical consequences.

A use that runs long enough becomes immune from enforcement, and the enforcement time limit in England is now ten years for all breaches. Temporary consents that lapse unnoticed can, over time, turn into a lawful use you did not intend to create.

A community use can acquire policy protection. A well-loved meanwhile garden or community hall can attract local plan protection as a community facility, or nomination as an asset of community value, and the loss of it then becomes a material consideration weighing against your permanent scheme. That does not mean avoid community uses. It means write the temporary nature into every piece of communication from the start, and expect to be held to what you said.

An interim use that generates noise, traffic or odour can also prejudice the permanent scheme by establishing a baseline you then have to design around, or by souring the neighbours whose representations the committee will read.

Evidence for the benchmark land value argument

If you are running the argument that a meanwhile use has lifted existing use value, build it properly.

  1. A valuation from a suitably qualified valuer, stating the basis, the term assumed and the yield applied.
  2. Net income evidence over at least two accounting periods, with cost lines identified.
  3. The occupational documents, showing what is contractually certain.
  4. Market evidence of comparable transactions where interim income was in place, which is thin, so say so rather than overstating it.
  5. A clear statement of what happens to that income on redevelopment, because it stops.

Then reconcile the figure with the rest of the appraisal. A Viability Assessment that claims a meanwhile-use-enhanced benchmark while showing a nil abnormal cost for decommissioning is internally inconsistent, and reviewers find that quickly. Councils expect a suitably qualified author for this document and professional review before submission is strongly advised. Assume publication too, which is the position national guidance starts from and which we cover in viability at appeal.

Sequencing the interim and the permanent application

Run the temporary application and the pre-application discussion on the permanent scheme in parallel, with the same officer where possible. Align the end date of the temporary consent with a realistic start on site, and ask for a period long enough that you are not returning for an extension in eighteen months.

Where the site is employment land, take care. A temporary non-employment use can be used as evidence that the employment use is no longer viable, or as evidence that the site still functions, depending on who is arguing. Our note on employment land release sets out what councils look for.

One honest uncertainty: there is no settled national position on how much an interim income should move benchmark land value, and district valuer practice varies. Which is why the evidence, rather than the theory, is what decides it.

See PlanScope pricing: one free report, £50 per report, or Professional for unlimited reports.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does a meanwhile use increase existing use value?

It can, but usually modestly. Existing use value is the value of the land in its current lawful use, and a valuer can only capitalise income that is net of the cost of earning it and certain for a stated term. A licence terminable at a month's notice has almost no capital value.

Will a meanwhile use cost me the vacant building credit?

It may. The credit depends on the building being vacant, and authorities examine whether occupation was arranged to create or preserve an advantage. Compare the value of the credit against the interim net income before signing anything, because on many schemes the credit is worth more than two years of rent.

How long can I use land temporarily without permission?

Permitted development allows temporary use of land for any purpose for not more than 28 days in a calendar year, reduced to 14 days for markets and for motor car and motorcycle racing, and it does not authorise buildings. Film-making has a separate longer right. Anything more needs a temporary planning permission.

How should the occupation be documented?

Exclude security of tenure under the Landlord and Tenant Act 1954 by the statutory procedure or by keeping within the short-term exception, use licences only where occupation is shared rather than exclusive, and include a landlord break tied to the grant of planning permission rather than a fixed date.

Can a temporary community use harm my permanent scheme?

Yes. A valued community use can attract local plan protection as a community facility or nomination as an asset of community value, and its loss then becomes a material consideration against the redevelopment. State the temporary nature in every communication from the outset and expect to be held to it.

What evidence supports a higher benchmark land value?

A valuation from a suitably qualified valuer stating basis, term and yield; net income over at least two accounting periods with cost lines identified; the executed occupational documents; any comparable transactions; and a statement of what happens to the income on redevelopment. Reconcile it with the decommissioning cost in the appraisal.

Sources and further reading

viabilitymeanwhile usebenchmark land valuetemporary permissionvacant building credit

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial7 min read

Does paying for pre-application advice pay for itself

Pre-application advice pays when the answer could change the scheme. Where the policy position is already clear, the fee buys a letter restating what you knew.

Read article →
Viability, Obligations and Commercial7 min read

Planning performance agreements: what to put in one

A performance agreement buys predictability on a complex application, not a permission. The clauses that matter are dated milestones, named officers and a section 106 timetable.

Read article →
Viability, Obligations and Commercial6 min read

CIL liability notices and who actually pays the levy

If nobody assumes liability for the Community Infrastructure Levy, it apportions to the owners of the land. The notice sequence, the deadlines and the exemptions that have to be claimed.

Read article →
Viability, Obligations and Commercial8 min read

Marriage value and site assembly in a viability appraisal

Assembly costs are real, but most of them do not reduce what a scheme can contribute. Where acquisition costs, ransom premiums and created marriage value each belong in the appraisal.

Read article →
Viability, Obligations and Commercial7 min read

Varying a planning obligation after five years

After the five year relevant period, a statutory application under section 106A replaces negotiation, and a refusal can be appealed under section 106B. What the authority can decide and what it cannot.

Read article →
Viability, Obligations and Commercial7 min read

Social infrastructure contributions and how they are justified

Contribution requests are built from a yield factor, a capacity claim and a published cost. The arithmetic is usually right, so the argument belongs on the capacity evidence and the statutory tests.

Read article →