Use Classes and Change of Use

Moving within Class E: what still needs permission

6 min readBy PlanScope Editorial Team

A shop can become a restaurant, a gym or a nursery without planning permission. The physical works, planning conditions and licensing that come with it are a different question.

Moving from one use to another inside Class E does not need planning permission, because section 55(2)(f) of the Town and Country Planning Act 1990 says a change of use within the same class is not development. A shop can become a restaurant, a gym, a nursery, a clinic or an office with no application, no fee and no decision notice.

What that does not do is make the project consent free. The physical works usually need permission, an old condition on the building's permission can override the freedom entirely, and the environmental health team will arrive on its own schedule regardless of what the Use Classes Order says.

What the 2020 amendment put into Class E

The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020 took effect on 1 September 2020 and collapsed the old shop, financial and professional services, restaurant, office, light industrial, clinic, crèche and indoor sport classes into a single commercial, business and service class.

Class E now runs from E(a) to E(g):

  • E(a) display or retail sale of goods, other than hot food
  • E(b) sale of food and drink for consumption mostly on the premises
  • E(c) financial services, professional services and other appropriate services
  • E(d) indoor sport, recreation or fitness, not involving motorised vehicles or firearms
  • E(e) medical or health services other than at a practitioner's home
  • E(f) crèche, day nursery or day centre
  • E(g) offices, research and development, and light industrial processes that can be carried out in a residential area without detriment to amenity

Movement between any of these is free. What did not go into Class E is as important: hot food takeaways, drinking establishments, cinemas, concert halls, bingo halls and dance halls are all sui generis, so a restaurant becoming a takeaway is a change of use that needs permission. Nurseries with a residential element and most sui generis leisure uses sit outside too.

The works are the application

Almost every real change of occupier involves building work, and section 55 treats external and structural works quite differently from the use.

A new shopfront needs permission. An extraction duct running up the rear elevation needs permission. Air conditioning condensers on a flat roof, a flue, a new door opening, an altered fascia, external seating with a structure over it, and any advertisement beyond the limited deemed consent all need their own approval. Internal alterations generally do not, with the exception of a mezzanine floor in a building used for retail where the added floorspace exceeds the threshold in section 55, and any works to a listed building.

The pattern that produces enforcement notices is a lawful use change carried out alongside unlawful works. The council cannot stop you opening a restaurant in a former bank. It can require you to remove the extract duct you put up the back wall without permission, which in practice stops the restaurant.

Plan the works as an application from the start, and expect a Ventilation and Extraction Statement for anything involving cooking.

Conditions that survive the freedom

The most common reason a Class E movement fails is a condition on an earlier permission. Councils have restricted uses by condition for decades, and a condition limiting a unit to retail sales, or excluding food and drink, or tying an office to a named occupier, continues to bite after the 2020 changes. A condition referring to a use class that no longer exists still has effect according to its terms.

So the first thing to do before signing a lease is to obtain the planning history for the unit and read every decision notice, including those for the wider development if the unit sits in a retail park or a converted building. The condition you are looking for is often on a permission from twenty years ago and is not referenced anywhere in the letting particulars.

Where a condition blocks the use, the route is an application under section 73 to vary it, which is determined on planning merits and is refusable. Budget the time.

Article 4 directions cannot stop movement inside Class E

This point is widely misunderstood, including by some agents. An Article 4 direction withdraws permitted development rights granted by the General Permitted Development Order. Movement within a use class is not permitted development, it is not development at all, so an Article 4 direction cannot prevent it.

What Article 4 directions do reach is the separate right, under Schedule 2 Part 3 Class MA, to change from Class E to residential use through prior approval. Many councils have made directions removing Class MA in town centres and on industrial estates, and those directions are effective. Similarly, Article 4 directions removing the Class E to state funded school or to temporary flexible use rights are real.

If a council officer tells you an Article 4 direction prevents your shop becoming a gym, ask which permitted development right the direction withdraws. The answer will usually reveal that the direction is about something else.

What arrives anyway

The planning position is only one of four or five regimes, and the others are not affected by Class E at all.

Building regulations apply to a material change of use and to the works, with Approved Document B fire safety and Approved Document M access most often driving the cost. Food business registration, a premises licence for alcohol or late night refreshment, and a pavement licence for outside tables all run on their own timetables. Environmental health will take an interest in cooking odour, plant noise and refuse storage whether or not you needed planning permission.

Noise is where a lawful change of use most often ends in a statutory nuisance notice. A Noise Impact Assessment using BS 4142:2014+A1:2019 for plant, carried out before the equipment is specified, is far cheaper than replacing a condenser after complaints. Where the unit sits above or beside flats, assume the neighbours will complain and design for it.

Transport is the other one. A change from an office to a nursery or a gym alters trip generation and arrival patterns even though the use class did not change, and where an existing condition or a highway agreement controls parking, a short Transport Statement may be needed for the works application.

Evidencing the existing lawful use

You cannot move within Class E from a use that was never lawful. If the unit has been operating as something the planning history does not support, the starting point is not Class E freedom but a lawful development certificate under section 191 of the 1990 Act, evidenced by rates records, leases, accounts, utility bills and dated photographs.

The same certificate is worth having even where the position looks clear. A certificate of lawful proposed use under section 192 confirms that the intended use falls within Class E and needs no permission, which is the document a funder or a landlord will ask for. It costs a fee and a wait, and it removes the argument.

Where the fit-out needs a planning application anyway, deal with both in one go, with a short Planning Statement that sets out the lawful use, the Class E position and the works being applied for.

This is general guidance rather than legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can a shop become a restaurant without planning permission?

Yes in use terms, because retail sale under E(a) and sale of food and drink for consumption on the premises under E(b) are both inside Class E, and movement within a class is not development. The extraction, flues, shopfront alterations and any external seating structure will still need permission, and a condition on an earlier consent can block the change.

Is a hot food takeaway inside Class E?

No. Hot food takeaways were left out of Class E and are sui generis, so moving from a restaurant to a takeaway is a change of use requiring planning permission. Councils commonly assess these against local policies on hot food outlets, and odour, litter, parking and hours are the usual points of dispute.

Can an Article 4 direction stop me changing use within Class E?

No. Article 4 directions withdraw permitted development rights granted by the General Permitted Development Order, and movement within a use class is not development at all. Directions can and do remove the separate Class MA right to convert Class E premises to residential use, which is a different question.

Does an old condition restricting the use still apply?

Yes. A condition limiting a unit to a particular use, or excluding food and drink, continues to have effect according to its terms even where it refers to a use class abolished in 2020. Obtain the planning history before signing a lease, and if a condition blocks the intended use, apply under section 73 to vary it.

Do I need a lawful development certificate to confirm a Class E change?

It is not compulsory, but a certificate of lawful proposed use under section 192 of the 1990 Act confirms the intended use needs no permission and is the document funders and landlords usually ask for. Where the existing use itself is doubtful, a certificate under section 191 evidencing the lawful use is the necessary first step.

Sources and further reading

class echange of useuse classes ordercommercial propertyarticle 4

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use8 min read

Live-work units and how councils classify them

A live-work unit is a composite use, not a use class. That is why permission is needed, why the conditions are tight, and why councils worry about the work element disappearing.

Read article →
Use Classes and Change of Use7 min read

Merging two dwellings and the loss of a unit

Combining two dwellings into one is not automatically a change of use. Whether permission is needed turns on local housing retention policy and the evidence you bring.

Read article →
Use Classes and Change of Use7 min read

Splitting one dwelling into two: the use position

Subdividing a dwelling always needs permission under section 55(3)(a). What decides the outcome is room sizes, refuse storage, cycle parking and overnight parking stress.

Read article →
Use Classes and Change of Use7 min read

Flats above shops and ancillary residential use

Accommodation above a shop is either ancillary to the Class E use or a separate dwelling. Access arrangements usually decide which, and moving between them is a material change of use.

Read article →
Use Classes and Change of Use7 min read

Change of use with no building work: what to submit

No building work does not mean no drawings. The permission defines a use within a planning unit, and only plans can define either, which is why most invalid applications fail here.

Read article →
Use Classes and Change of Use8 min read

Two planning units in one building: how to tell

A shop with a flat above may be one planning unit or two, and the answer changes which permitted development rights exist and whether a change of use needs permission at all.

Read article →