Noise, Air, Odour and Light

NOEL, LOAEL and SOAEL: the noise exposure hierarchy

6 min readBy PlanScope Editorial Team

The noise hierarchy is a policy device, not a pass or fail test. None of its thresholds has a national value, so an assessment has to derive them for the site.

The noise exposure hierarchy runs NOEL, LOAEL, SOAEL and UAEL, and it describes what happens to people as sound levels rise: no observed effect, then an observed effect that is not adverse, then the lowest level at which an adverse effect can be detected, then the level at which that adverse effect crosses into the band policy treats as serious, and finally a level that should be avoided altogether. It comes from the Noise Policy Statement for England and it is carried through into national planning guidance, which is why planning officers use the terms even though no British Standard defines them.

The single most useful thing to understand is that none of these thresholds has a national numerical value. They are site specific, and an assessment that quotes a SOAEL without deriving it is asserting a conclusion rather than reaching one.

Where the hierarchy comes from

The Noise Policy Statement for England sets three aims: to avoid the most serious adverse impacts on health and quality of life, to mitigate and minimise adverse impacts, and, where possible, to contribute to improvements in health and quality of life. The hierarchy exists to link a measured or predicted sound level to one of those aims.

National planning guidance on noise then applies the hierarchy to development management, describing observed and adverse effects and setting out what the decision maker should do at each level. The language of no observed effect, no observed adverse effect, observed adverse effect and the SOAEL band runs through both documents.

The practical translation is that the hierarchy is a policy device for deciding how much weight noise carries, not a test a scheme passes or fails.

Definitions of each threshold

Term Meaning
NOEL No observed effect level: below this, no effect on health or quality of life is detectable
NOAEL No observed adverse effect level: the effect is noticeable but not adverse
LOAEL Lowest observed adverse effect level: the level above which adverse effects begin to be seen
SOAEL Significant observed adverse effect level: the level above which adverse effects are treated as serious
UAEL Unacceptable adverse effect level: a level that should be prevented

Adverse in this context means more than annoyance. It covers changes in behaviour and attitude, such as closing windows, avoiding a garden, altering the layout of a home to escape the sound, and disturbed sleep. That behavioural definition is what makes the thresholds situational.

Why the values are not fixed nationally

Government has consistently declined to publish numbers for LOAEL and SOAEL, and the reason is that the same decibel level produces different effects in different contexts.

The character of the source matters. A steady mechanical hum at a given level is experienced differently from intermittent reversing alarms at the same level. The existing acoustic environment matters: an addition that is inaudible against a busy road is conspicuous in a quiet rural valley. The receptor matters, because a bedroom at night, a garden on a summer afternoon and an office are not the same. And the time period matters, which is why night-time thresholds sit lower than daytime ones.

Fixing a national figure would produce absurd results at both ends. So the hierarchy is deliberately qualitative, and the numbers are derived case by case.

Setting site specific values in an assessment

A credible Noise Impact Assessment derives its LOAEL and SOAEL rather than borrowing them. The derivation usually draws on four strands.

  1. Published guidance on internal and external noise levels for dwellings, which gives commonly accepted internal levels for living rooms and bedrooms and a desirable range for external amenity areas.
  2. The international community noise guidance that underpins those published levels.
  3. The measured existing acoustic environment at the receptor, by day and by night, including the character of the existing sound.
  4. The relevant assessment standard for the source, such as the rating method used for industrial and commercial sound, or the methodology used for road, rail or aircraft noise.

State the derived values explicitly, with the reasoning, and apply them consistently through the report. If the assessment then concludes that predicted levels sit between LOAEL and SOAEL, it has to say what mitigation reduces the adverse effect, because that is the policy consequence of sitting in that band.

The policy consequence at each level

Below LOAEL, noise carries little weight and no specific mitigation is required.

Between LOAEL and SOAEL, the adverse effect should be mitigated and minimised. This is where most real cases sit, and it is where the argument actually happens, because "mitigated and minimised" is a judgement about what is reasonable rather than a numerical target. Mitigation here means the practical measures: a barrier where it breaks line of sight, an acoustically treated facade, a layout that puts habitable rooms away from the source, restrictions on hours of operation.

Above SOAEL, the effect should be avoided. Avoidance is a stronger word than mitigation, and in practice it means either a design change that removes the exposure or a conclusion that the development should not happen in that form on that site.

The agent of change principle sits alongside this. Where a new noise-sensitive development is proposed next to an existing business, the responsibility for mitigation falls on the new development rather than on the established use, and national policy supports that. A new block of flats beside a music venue cannot expect the venue to solve the problem it created.

How the hierarchy is used in decisions

Officers use the hierarchy to structure the recommendation. An officer report will typically state the derived LOAEL and SOAEL, state the predicted levels, place the scheme in a band, and set out the conditions that deliver the mitigation.

Conditions are where the hierarchy becomes concrete. Expect limits on plant noise expressed relative to background, a requirement to submit and approve a detailed acoustic design before installation, restrictions on hours, and in residential schemes a post-completion verification requirement demonstrating that internal levels have been achieved.

A word on what happens afterwards. Compliance with a planning condition does not prevent a statutory nuisance case being brought later, and the two regimes have different tests, as statutory nuisance after planning permission is granted explains.

Common misuse of the terms

Four patterns come up often enough to check for in any report you receive.

Quoting a SOAEL from a different project, or from a textbook, without deriving it for this site. Using the internal noise levels in published guidance as if they were the SOAEL, when they are design targets that inform the derivation rather than define it. Applying daytime thresholds to a night-time source. And treating a conclusion of "below SOAEL" as a pass, when the policy requirement between LOAEL and SOAEL is to mitigate and minimise, not simply to stay below a line.

A fifth, subtler one: assessing only the source and ignoring the resulting acoustic environment as a whole. A development that adds a small contribution to an already high level can still push the overall exposure into a different band, and the assessment should address the total rather than the increment alone. The limits of physical mitigation in that situation are worth understanding, and what an acoustic barrier actually achieves sets out how modest the gains often are.

Ask for the derivation. If a report cannot show how it arrived at its thresholds, the conclusions built on them carry no weight.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see whether your site is likely to need noise, air quality or odour evidence.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What do LOAEL and SOAEL stand for?

LOAEL is the lowest observed adverse effect level, the point above which adverse effects begin to be seen. SOAEL sits above it and marks where those adverse effects are treated as serious enough to change the policy response. Both come from the Noise Policy Statement for England and are carried into national planning guidance on noise.

Is there a national decibel value for SOAEL?

No. Government has consistently declined to publish figures because the same level produces different effects depending on the character of the source, the existing acoustic environment, the receptor and the time of day. Values are derived case by case, and an assessment quoting a threshold without showing its derivation is asserting a conclusion.

What does adverse effect mean in this context?

More than annoyance. It covers changes in behaviour and attitude attributable to the sound, such as closing windows that would otherwise be open, avoiding the garden, rearranging how rooms are used, and disturbed sleep. That behavioural definition is why the thresholds depend on the situation rather than on the decibel level alone.

What must a scheme do if it sits between LOAEL and SOAEL?

Mitigate and minimise the adverse effect. That is a judgement about what is reasonable rather than a numerical target, and it typically means a barrier where one breaks line of sight, acoustic treatment of the facade, a layout that moves habitable rooms away from the source, or restrictions on hours of operation.

What is the agent of change principle?

Where a new noise-sensitive development is proposed next to an established business, responsibility for mitigation falls on the new development rather than the existing use. National policy supports it, so a residential scheme beside a music venue or an industrial unit is expected to design out the conflict rather than ask the existing operator to.

Sources and further reading

noiseloaelsoaelenvironmental healthpolicy

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Noise, Air, Odour and Light

View all →
Noise, Air, Odour and Light7 min read

Play noise from schools and nurseries in an application

BS 4142 excludes sound from people and recreational activities, so a nursery or school application needs a different approach. Here is how to assess play noise and which controls councils accept.

Read article →
Noise, Air, Odour and Light7 min read

Odour and noise from waste facilities at planning stage

National waste planning policy tells authorities not to duplicate pollution control. Here is where the planning line falls, which odour and noise sources matter, and the conditions that work without duplicating the permit.

Read article →
Noise, Air, Odour and Light7 min read

Drafting noise conditions that can actually be verified

A noise condition that cannot be measured cannot be enforced. How to draft a limit with a named receptor, defined periods, a stated metric and a verification test that settles the question.

Read article →
Noise, Air, Odour and Light7 min read

Statutory nuisance and why planning conditions matter more

Two regimes control the same noise from a business. The planning condition is the one with no right of appeal, which is why councils reach for it first.

Read article →
Noise, Air, Odour and Light6 min read

Specifying luminaires to control sky glow

A luminaire datasheet quotes upward light ratio at zero tilt. Once the unit is angled across a carriageway the figure changes, which is why the schedule has to state the installed attitude.

Read article →
Noise, Air, Odour and Light7 min read

Dark sky areas and lighting policy in protected landscapes

National Parks and National Landscapes sit in the darkest obtrusive light zones, where upward light is zero and spill after curfew is zero. What that means for design.

Read article →