Glossary

Non-material amendment: what it means in planning

7 min readBy PlanScope Editorial Team

Section 96A amends the permission you already hold rather than creating a new one. Here is how councils judge materiality and what happens if they refuse.

A non-material amendment is a change to an existing planning permission that the council accepts is not material, made under section 96A of the Town and Country Planning Act 1990. It amends the permission you already have. It does not create a new one, it is normally determined within 28 days, and there is no right of appeal if the council says no.

Those three features make it the quickest way to correct a permission and the riskiest to rely on, because a refusal leaves you with nowhere to go except a full application.

Where it comes from

Section 96A was added to the 1990 Act by the Planning Act 2008 and came into force in 2009. It allows a local planning authority to make a change to any planning permission relating to land in its area if it is satisfied that the change is not material.

The section says nothing about what "not material" means. There is no statutory definition, no threshold and no list. What it does say is that in deciding the question the authority must have regard to the effect of the change, together with any previous changes made under the section, on the permission as originally granted.

That cumulative wording matters. Four small amendments that would each pass on their own can fail collectively, because the fourth is assessed against the permission as granted rather than against the permission as last amended.

The authority may also impose new conditions, and may remove or alter existing ones, when it makes the change.

How councils decide

The assessment is one of fact and degree, carried out by the case officer, and different authorities draw the line in different places.

The questions officers actually ask are practical. Would anyone who commented on the original application want to comment on this? Does the change affect the appearance of the building as seen from public views or from neighbouring windows? Does it alter the floor area, the number of units, the height or the position of the building? Does it affect anything a condition was imposed to control? And does it change anything a consultee relied on when it withdrew an objection?

If the answer to all of those is no, the change is usually accepted. If the answer to any is yes, expect a refusal or an invitation to apply under section 73 instead.

Some authorities publish their own guidance on what they will accept, with worked examples. Read it before applying, because it is a better predictor than any general rule.

An illustrative example

This example is illustrative rather than a real case. A permission for a rear extension is granted showing a 1.2 metre wide window on the rear elevation. During construction the client decides to move that window 400 millimetres towards the centre of the elevation and to change the rooflight from one 600 by 900 unit to two smaller ones.

Neither change alters the footprint, the height, the ridge line or the relationship to the boundary. Neither is visible from the street. Neither affects the separation distance to the neighbour's window. A section 96A application with revised drawings and a short covering note is the right route, and a council would normally accept it.

Move the same window 400 millimetres and enlarge it to 2.4 metres so that it now overlooks the neighbouring garden directly, and the answer changes. The effect on neighbouring amenity is exactly what a neighbour would have commented on.

What it cannot do

Three limits are worth knowing.

It cannot be used for anything material, which is circular but important: the assessment is the council's, and its view of materiality is what governs.

Councils generally decline to alter the description of development through this route, treating any change to the description as material by definition. A change from four houses to five will not be accepted, and neither will a change of use.

And it cannot extend the time limit for implementation. A permission running out of time cannot be saved this way.

There is also no statutory requirement to consult neighbours or publicise the application, although some councils notify as a matter of local practice. That absence of consultation is one reason officers apply the materiality test conservatively, since nobody else gets the chance to comment.

Fees, forms and what to submit

The application is made on the standard form for a non-material amendment through the usual submission route, with a fee set by the national fees regulations. The fee is modest compared with a full application and is indexed periodically, so take the current figure from the published schedule rather than from an older article.

The submission itself should be short and precise. Councils refuse applications that are vague about what is changing more often than they refuse applications for changes that sit close to the line.

Include a drawing schedule that lists the approved drawing numbers, the proposed replacement numbers and which supersedes which. Officers process the amendment by updating the list of approved plans in the decision, so a clear schedule is doing their work for them.

Where the change affects something a condition controls, say so and explain how the condition will still be met. A rooflight change that affects an approved materials schedule needs the materials position addressed, not left for the officer to notice.

One practical warning. An amendment granted under section 96A takes effect from the date it is issued, and works carried out before that date are not authorised by it. On a live site, that gap between deciding to change something and receiving the amended approval is a real compliance risk, and the honest answer is usually to pause that element of the works rather than to proceed and regularise later.

Route What it does Result Appeal
Section 96A Non-material change to a permission The original permission, amended No right of appeal
Section 73 Varies or removes a condition A new, separate permission Right of appeal
New application Any material change A new permission Right of appeal
Condition discharge Approves details a condition requires Written approval under the condition Right of appeal

Section 96A has one clear advantage over section 73 beyond speed. Because the permission is the same permission, any section 106 agreement attached to it continues to apply without a deed of variation, and approvals already given under conditions remain valid. A section 73 application creates a new permission and both of those have to be dealt with again.

The trade-off is scope. Section 73 can handle changes that section 96A cannot, and it carries a right of appeal if refused.

What to do if it applies to your site

Start by asking whether the change is one a reasonable neighbour would notice or care about. If you find yourself constructing an argument for why they would not, it is probably material.

Then work through the application itself.

  1. Identify the original permission by reference number and date, and list every previous amendment made under section 96A.
  2. Prepare drawings showing the approved scheme and the proposed change, clearly marked as superseding specific drawing numbers.
  3. Write a short covering note explaining what changes, what does not, and why the change has no material effect on anything the original decision turned on.
  4. Check the current fee for this type of application against the published fee schedule.
  5. Ask the case officer informally first if the change is anywhere near the line. A two minute conversation saves a refused application and a full resubmission.

If the council refuses, remember there is no appeal. The routes that remain are a section 73 application if the change can be expressed as a variation of a condition, or a fresh planning application. Where a fresh application follows, a short Planning Statement explaining the relationship to the existing permission, alongside an updated Design and Access Statement where one was required originally, keeps the history clear. The full set of supporting documents is on our report index.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to draft the supporting documents an amended scheme needs. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How long does a section 96A application take?

Commonly 28 days from receipt of a valid application, though an authority can agree a longer period. There is no statutory requirement to consult neighbours or publicise the application, which is part of why the determination period is short and why officers apply the materiality test conservatively.

Can I appeal a refusal?

No. The right of appeal under section 78 does not extend to decisions under section 96A. If a council refuses, the remaining routes are a section 73 application where the change can be expressed as varying a condition, or a fresh planning application. That is why an informal discussion with the case officer first is worth the time.

What counts as not material?

There is no statutory definition. Officers assess it as a matter of fact and degree, asking whether anyone who commented on the original application would want to comment on this change, whether it affects appearance from public or neighbouring views, floor area, unit numbers, height or position, and whether it touches anything a condition controls.

Do previous amendments affect a new one?

Yes. Section 96A requires the authority to have regard to the effect of the change together with any previous changes made under the section, judged against the permission as originally granted. Four individually minor amendments can therefore fail collectively, so list every earlier amendment in the application.

What happens to the section 106 agreement?

Nothing, which is one of the advantages of this route. Because the permission remains the same permission, any planning obligation attached to it continues to apply and no deed of variation is needed. Approvals already given under conditions also remain valid, which is not the case with a section 73 permission.

Sources and further reading

section 96anon-material amendmentplanning conditionsplanning processglossary

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary7 min read

Competent person: who the law accepts for which report

Six planning report types carry a statutory competence requirement. Many more only expect a suitably qualified author. The difference changes who can sign and what happens if they cannot.

Read article →
Glossary7 min read

Betterment in highway terms: what a section 278 delivers

A section 278 agreement lets a developer pay a highway authority to improve the existing highway, but only where the authority is satisfied the public benefits. Here is how it is secured and programmed.

Read article →
Glossary6 min read

Exceedance route: where water goes when the system fills

Every drainage system has a capacity, and water above it has to go somewhere. An exceedance route is the designed overland path, and it is a levels exercise before it is a pipe exercise.

Read article →
Glossary6 min read

Receptor: who and what an assessment protects

Receptor is the third term in the source-pathway-receptor chain, and every discipline defines it slightly differently. Getting the list right is what makes the rest of an assessment defensible.

Read article →
Glossary7 min read

Reasonable worst case: what it means in assessment

An outline or parameter-based scheme still has to be assessed against something definite. Reasonable worst case is how that is done, and the parameters you fix decide whether the assessment holds.

Read article →
Glossary7 min read

Severance: when one permission cannot be built in parts

A planning permission is normally a permission for the whole development, not a set of independent parts. Here is what severance means, where the rule comes from, and how to check the position for a part-built site.

Read article →