Trees and Arboriculture

Objecting to a new tree preservation order

6 min readBy PlanScope Editorial Team

A provisional tree preservation order binds you from the day it is made. Objections must arrive within the period stated in the notice, and only some arguments carry weight.

A tree preservation order takes effect the moment it is made, before anyone has had the chance to object. The authority then has six months to confirm it, and during that period the trees are fully protected. If you want to object to a tree preservation order, the notice served on you states the date by which written objections must arrive, and the Town and Country Planning (Tree Preservation) (England) Regulations 2012 require that period to be at least 28 days from service.

Most people discover the order when the envelope lands. That is deliberate, because an order announced in advance would invite a chainsaw.

How a provisional order takes effect

Section 198 of the Town and Country Planning Act 1990 lets a local planning authority make an order where it appears expedient in the interests of amenity to make provision for preserving trees or woodlands. Two words in that sentence do the work. Amenity, meaning the contribution the trees make to the appearance and character of the area. Expediency, meaning whether an order is a sensible use of the power at this point.

The order names the trees individually, as groups, as areas or as woodland, and a plan shows their positions. A copy goes to everyone who owns or occupies land affected, along with a statement of the authority's reasons and the period for objections.

From that date, cutting down, topping, lopping, uprooting, wilfully damaging or wilfully destroying any of the trees is an offence without consent. Our note on penalties for damaging a protected tree sets out how the courts treat it, and the fines are not trivial.

The period for objections and representations

Write, and write in time. Objections must be in writing, must identify the trees they relate to and must state the reasons. An objection that says only that the order is unfair gives the officer nothing to report.

Address the letter to the officer named in the notice, quote the order reference, and list the trees by their numbers on the schedule. Where your objection relates to some trees and not others, say so plainly, because a partial objection is far easier to accommodate than a blanket one.

Supporting material helps. Dated photographs, a report from an arboriculturist, a copy of a previous quotation for works, correspondence with an insurer about subsidence, or a drainage engineer's note about root ingress all turn an assertion into evidence.

Grounds that authorities take seriously

The authority has to consider whether it remains expedient in the interests of amenity to confirm the order. Objections that engage with that question carry weight. Objections that do not, tend not to.

Ground Weight it usually carries
Tree is dead, dying or structurally unsound High, with arboricultural evidence
Species is short-lived or unsuitable for the position Moderate, depends on the report
Tree is barely visible from public vantage points Moderate, goes to amenity value
Documented subsidence or drainage damage Moderate to high, with engineering evidence
Tree blocks light to the house or drops leaves Low on its own
Cost of future maintenance Low
Ownership or plan errors High, usually leads to modification

Amenity is judged from public places rather than from your garden. A mature oak screened from the road by a tall wall and visible only from the objector's kitchen window is a weaker candidate than a street-side lime in full view.

And an objection based on condition needs a qualified author. An arboriculturist's report describing decay, included bark at a union, fungal fruiting bodies or a poor root plate is the single most effective document you can submit.

The confirmation decision

The authority decides whether to confirm, and the decision may be taken by an officer under delegated powers or by a committee, depending on the council's scheme of delegation and the number of objections received. Where the matter goes to committee, objectors can usually ask to speak.

The decision must be notified to everyone who was served with the order and to anyone who objected. Where the order is confirmed with modifications, the modified order and schedule are served with it.

There is no right of appeal against confirmation. The remaining route is judicial review in the High Court, which tests the lawfulness of the decision rather than its merits and has a short time limit. In practice, almost nobody goes there for a household tree.

Modification on confirmation

Modification is the realistic goal for most objections. Authorities regularly narrow an order at confirmation, and the common modifications are worth knowing.

  1. Individual trees removed from the schedule where the evidence shows poor condition or low amenity value.
  2. A woodland classification replaced by individual or group protection, which changes what happens when the trees are felled and regrow.
  3. A group reduced to the trees that are actually visible from the street.
  4. The plan corrected where a tree is shown on the wrong side of a boundary.

Ask for the specific modification you want. An objection that proposes a workable alternative gives the officer something to recommend.

Be realistic about scale. An objection asking for one dangerous ash to be removed from a schedule of eleven trees stands a far better chance than one asking for the whole order to be dropped, and the officer's report will treat the two very differently.

Where several neighbours are affected, a single co-ordinated objection setting out the shared points, with individual letters covering property-specific issues, reads better than eleven near-identical emails. Officers summarise objections by theme, and repetition adds nothing to the summary.

What happens if the order is not confirmed in time

The six-month rule is the one to diarise. If the authority does not confirm the order within six months of the date it was made, the order ceases to have effect. No notice is required for that to happen.

Councils occasionally miss the deadline on contested orders, particularly where a case officer leaves. If the date passes and you have heard nothing, ask the tree officer in writing to confirm the position before doing anything, because the consequence of getting it wrong is a criminal offence rather than a refusal.

Living with a confirmed order

Once confirmed, the order runs with the land indefinitely until it is revoked. It appears on a local land charges search, so a buyer's solicitor will find it.

Revocation happens, though rarely. An authority can revoke or vary a confirmed order where circumstances change, for example where a tree has since declined or where a subsequent permission makes retention impossible. There is no application form for revocation, so the approach is a written request to the tree officer with evidence.

The practical effect is that works to the trees need an application for consent, which is free and decided within eight weeks. Refusals can be appealed to the Planning Inspectorate. Clear specification matters more than people expect, and our note on specifying crown works councils will accept covers how to write the application so it is not refused for vagueness.

If you are planning to build, commission a survey to BS 5837:2012 before the drawings are fixed. A tree survey showing root protection areas, canopy spread and the constraints each tree imposes lets the designer work around the trees rather than around a refusal. You can enter your postcode on PlanScope to see which reports a site with protected trees is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I still prune a tree while an order is provisional?

Not without consent. A provisional order has full effect from the day it is made, so cutting down, topping, lopping, uprooting, wilfully damaging or wilfully destroying a protected tree is an offence unless an exception applies or the authority has given consent. The exceptions cover dead trees and work urgently needed to remove an immediate risk of serious harm, on notice.

How long do I have to object?

The notice served with the order states the date by which objections and representations must be received, and the regulations require at least 28 days from the date of service. Late objections can be considered at the authority's discretion but there is no entitlement to have them taken into account, so treat the stated date as the deadline.

What happens if the council does not confirm the order?

The provisional order lapses six months after the date it was made if it has not been confirmed by then. The trees lose protection unless they are covered by something else, such as a conservation area or a planning condition. Authorities occasionally make a fresh order afterwards where circumstances have changed, which is lawful but unusual.

Can the order be changed rather than confirmed or dropped?

Yes. The authority may confirm the order with modifications, and this is the most common outcome of a successful objection. Trees can be removed from the schedule, a group or woodland classification can be narrowed to individual trees, and the plan can be corrected where it shows a tree in the wrong position or on the wrong ownership.

Does an order stop me developing the site?

No, though it changes how the scheme is designed and assessed. Protected trees are a material consideration, and a planning permission can authorise works to them where the permission plainly requires it. Expect the council to want a survey to BS 5837:2012, root protection areas shown on the layout and a method statement for work near retained trees.

Sources and further reading

tree preservation ordertpoobjectiontreeshouseholder

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Trees and Arboriculture

View all →
Trees and Arboriculture6 min read

Woodland creation on a development site and its upkeep

New woodland is easy to draw and hard to keep alive. The planting design, the establishment regime and the legal mechanism all have to agree with each other.

Read article →
Trees and Arboriculture7 min read

Tree officer site visits and what they inspect

The officer looks at the fence line first. Here is the full checklist, the consequences of an incursion, and the site record that protects you.

Read article →
Trees and Arboriculture7 min read

The five year maintenance condition on new planting

Planting that dies within five years must be replaced in the next planting season. The obligation runs with the land and survives the sale of the house.

Read article →
Trees and Arboriculture7 min read

Tree pits, structural soils and street tree establishment

Street trees fail on soil volume, not species choice. Work backwards from the mature canopy, put the volume on the drawing, and resolve the service corridor first.

Read article →
Trees and Arboriculture7 min read

Tree roots and proximity to a public sewer or drain

Most undertakers control building and planting within around 3m of a public sewer. Resolving that against retained trees is a layout decision, not a condition to discharge later.

Read article →
Trees and Arboriculture8 min read

Ash dieback and what it changes in a tree survey

Infected ash is not automatically a category U tree. How to record crown decline and basal lesions, categorise honestly, and handle protected ash under the 2012 exemption.

Read article →