Part 16 prior approval limits the council to siting and appearance. Health, need and property values carry no weight, so an objection has to be built on the two grounds that do.

If you want to object to a phone mast application, the first thing to establish is what kind of application it is. Most new masts arrive as a prior approval submission under Part 16 of the General Permitted Development Order, not as a planning application. The principle of the mast has already been granted by national legislation. The council is deciding two things only: where it goes and what it looks like.

That narrows the ground, and it explains why objections about health, about property values or about whether the area needs better coverage are set aside no matter how many people send them.

What prior approval covers for a mast

Part 16 grants permitted development rights to electronic communications code operators for specified categories of apparatus, subject to the council's prior approval of siting and appearance. The height and dimension limits were widened by amendments in 2022, and they differ between ordinary land and protected land such as conservation areas, National Landscapes and National Parks, so check the current wording of Class A rather than an older summary.

The submission has to include a plan showing the proposed siting, details of the apparatus and its appearance, evidence of the required notification, and a declaration about compliance with international radiation exposure guidelines.

An operator relying on Part 16 is not asking the council whether the mast can go somewhere in the area. They are telling the council where they intend to put it, and inviting the council to say no to that location and that design.

Siting and appearance are the only grounds

Everything in a useful objection has to be framed as siting or appearance. That is less restrictive than it sounds, because both terms are read broadly.

Siting arguments that carry weight include the relationship to nearby dwellings and their outlook, the position relative to a listed building or a conservation area, the effect on a view identified in the local plan or a neighbourhood plan, the loss of trees or verge, the obstruction of a footway or a visibility splay at a junction, and the cumulative effect of clustering equipment cabinets on one corner.

Appearance arguments include the colour and finish, the number and arrangement of antennas and headframes, the slimness of the column, whether a shroud or a disguised design is available for that equipment, and the size and placement of the ground cabinets that come with it.

What does not count: the operator's commercial need, whether another network already covers the village, the perceived effect on house prices, and the strength of local feeling on its own. Councillors can take the volume of objections into account when deciding whether to call an item to committee, but the decision itself still turns on the two grounds.

Why health concerns are excluded

The submission must be accompanied by a declaration that the equipment, in operation, will comply with the guidelines of the International Commission on Non-Ionizing Radiation Protection. National policy is explicit that where that declaration is provided, the local planning authority should not set its own health safeguards or question the science behind the guidelines.

Officers therefore cannot refuse a mast on health grounds where the declaration is in place, and an objection built on that argument will be recorded and then given no weight in the report.

That is frustrating for residents who feel strongly about it, and it is better to know before you write than after the decision. If the declaration is missing from the submission, that is a legitimate procedural point worth raising, because it is a requirement rather than a courtesy.

The 56 day period and what happens if it passes

The council has 56 days from receipt of a valid submission to notify the operator of its decision. Miss the deadline and the operator may proceed as submitted.

This matters for objectors in a practical way. The window for comments is short, often three weeks or less from the site notice going up, and the deadline is hard. A late objection on a planning application usually still reaches the officer. A late objection on a 56 day prior approval may arrive after the report has been signed.

Check the council's planning register for the application reference, the publicity end date and the target decision date on the day you find out about the proposal. Then write, rather than waiting to see what the parish council does.

Evidence about alternative sites

The strongest objections propose somewhere else. Operators are expected to explain why the chosen site was selected, and that explanation can be tested.

Look for three things in the supporting statement. Whether alternative sites were considered at all. Whether existing structures such as an industrial mast, a water tower, a pylon or an existing operator's column were assessed for sharing. And whether the reasons given for rejecting alternatives are technical or merely convenient.

If you know of a plausible alternative, name it precisely. A grid reference, a photograph, and a sentence about why it is less prominent will be quoted in the officer's report. A general statement that the mast should go somewhere in the industrial estate will not.

Site sharing carries particular weight because national policy expects operators to use existing masts and buildings where practicable. An objection that identifies an existing structure within the search area and asks why sharing was ruled out puts a specific question the operator has to answer.

Where full permission is needed instead

Some telecommunications development falls outside Part 16 and needs a full planning application, which opens up the full range of material considerations. That includes apparatus exceeding the permitted dimensions, some development on protected land, and works affecting a listed building, where listed building consent may also be required.

Check the description on the register. A submission described as an application for planning permission is not limited to siting and appearance, and an objection can then address landscape and visual impact, heritage significance and the development plan policies in the ordinary way. Where a proposal has a wider visual reach, the council can ask for a Townscape and Visual Impact Assessment rather than accepting a photomontage from one viewpoint.

Writing an objection that gets weight

Keep it short, specific and organised under the two headings the officer has to use.

  1. State the application reference and your address in the first line.
  2. Deal with siting: name the receptor, describe the view or the function affected, and give the distance.
  3. Deal with appearance: describe what would be seen, from where, and what alternative design or finish you are asking for.
  4. Propose an alternative location if you have one, with a grid reference or a marked plan.
  5. Ask a direct question about site sharing if an existing structure is nearby.
  6. Attach a photograph taken from the affected viewpoint.

Ask the parish or town council to submit its own response, because statutory consultee comments are reported separately. If the council operates a scheme allowing residents to address committee, register early, and use the time on the two grounds rather than on the network's commercial case. Understanding how consultation is meant to work is covered in our page on the Statement of Community Involvement.

You can see the full range of supporting documents councils ask for in the report index.

This is general guidance rather than legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Can I object to a mast on health grounds?

You can write it, but it will carry no weight. The operator must provide a declaration that the equipment will comply with the international radiation exposure guidelines, and national policy tells councils not to set their own health safeguards or question those guidelines where the declaration is given. A missing declaration is a fair procedural point to raise.

How long do I have to comment?

The council has 56 days from a valid submission to decide, and the publicity period is much shorter, often around three weeks from the site notice. If the council fails to decide within 56 days the operator may proceed as submitted, so late comments can arrive after the report is written. Check the register for the exact dates.

What arguments actually count against a mast?

Anything that can be framed as siting or appearance. That includes the distance to dwellings and the outlook from them, the effect on a listed building or conservation area, loss of trees or verge, obstruction of a footway or junction visibility, column slimness, colour and finish, and the size and clustering of ground cabinets.

Should I suggest an alternative site?

Yes, if you have a plausible one. Name it precisely with a grid reference or a marked plan and a photograph, and explain why it is less prominent. Also ask whether sharing an existing mast, water tower or pylon in the search area was assessed, because national policy expects operators to use existing structures where practicable.

When does a mast need full planning permission?

Where the apparatus falls outside the Part 16 limits, on some protected land, or where works affect a listed building and listed building consent is engaged. A full application opens up the whole range of material considerations, including landscape and visual impact and development plan policies, rather than siting and appearance alone.

Sources and further reading

telecomsprior approvalobjectionscommunitypermitted development

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Neighbours, Objections and Community

View all →
Neighbours, Objections and Community7 min read

Asking the council to make an Article 4 direction

Councils move slowly on Article 4 because of compensation liability. A request that acknowledges it, and asks for a twelve month deferred start, gets a better hearing.

Read article →
Neighbours, Objections and Community7 min read

Objecting to a change of use that needs no permission

Moving between two uses in the same class is not development, so no application exists. The remedies people reach for apply to permitted development rights, which is a different thing.

Read article →
Neighbours, Objections and Community7 min read

Petitions and template objections: how officers treat them

Public opposition is not itself a material consideration. The matters the opposition is about, if they are planning matters, are. That distinction decides whether a campaign changes anything.

Read article →
Neighbours, Objections and Community9 min read

Reading a viability assessment as a community objector

A viability assessment is an argument, not an accounting exercise. National guidance puts the burden on the applicant, and every assumption in the document can be tested.

Read article →
Neighbours, Objections and Community8 min read

Objecting to a scheme on an allocated site

On an allocated site, objecting in principle gets logged and set aside. The objections that change schemes aim at everything the allocation left open.

Read article →
Neighbours, Objections and Community6 min read

When a scheme is built differently from the approved plans

The drawings you objected to may not be the approved ones. How to check the register, report a departure usefully, and what remedies the council actually has.

Read article →