Commercial Occupiers

An off licence or vape shop: planning and licensing together

7 min readBy PlanScope Editorial Team

Two regimes, two tests. Class E usually answers the planning question, while the Licensing Act 2003 answers a different one, and the hours they grant need not match.

An off licence planning permission and licence question has two answers because there are two regimes. The retail sale of alcohol for consumption elsewhere falls within Class E(a) of the Use Classes Order, so taking over a former shop unit usually needs no planning permission at all. Selling the alcohol needs a premises licence under the Licensing Act 2003, which is a separate application, to a separate committee, judged against four statutory objectives that have nothing to do with planning policy.

A vape shop is simpler on one side and harder on the other. No premises licence is needed to sell vapes, but the product regulation around them has been moving faster than the planning system.

Retail sale as a use class question

Off-licences and vape shops are both retail, and both sit in Class E(a), the sale of goods other than hot food principally to visiting members of the public. Movement within Class E is not development under section 55 of the Town and Country Planning Act 1990, so a unit whose lawful use is Class E can become either without an application.

Three things qualify that.

A condition on an earlier permission can restrict the unit more tightly than the class does, including conditions tied to the pre-2020 A1 definition, and those conditions survive the reclassification. An Article 4 direction can remove permitted development rights across a parade or a town centre. And a unit whose last lawful use was sui generis, a hot food takeaway or a betting shop for instance, needs permission for the change.

Where the previous use is not clear from the planning history, the route to certainty is a certificate of lawfulness rather than an assumption. Our note on micro-pubs in former shop units works through the same analysis for a use that does need permission.

Where planning control ends and licensing begins

The two regimes ask different questions, and the statutory guidance issued under section 182 of the Licensing Act 2003 is explicit that a licensing hearing should not be used as a second run at the planning process.

Question Planning Licensing
Governing instrument Town and Country Planning Act 1990 and the development plan Licensing Act 2003 and the statement of licensing policy
Test applied Material considerations, development plan policy Four licensing objectives
The objectives or considerations Amenity, highways, character, policy compliance Crime and disorder, public safety, public nuisance, protecting children from harm
Decision maker Planning committee or delegated officer Licensing sub-committee
Appeal route Planning Inspectorate Magistrates' court, within 21 days

The overlap is public nuisance, which looks like amenity and is not the same thing. A licensing authority considering nuisance is looking at the effect of the licensable activity on nearby residents, with the police and environmental health as responsible authorities. A planning authority considering amenity is looking at the use of the land as a whole, including matters the licensing regime cannot touch, such as the loss of a shop from a protected frontage.

The planning authority is itself a responsible authority under the Licensing Act, so it can make representations on a licence application. That is the formal bridge between the two processes, and it is worth checking whether it has done so.

Hours granted under each regime and why they differ

This is where businesses get caught. A premises licence can grant hours for the sale of alcohol until midnight while a planning condition restricts the shop's opening hours to 22:00. The licence does not override the condition. In practice the more restrictive of the two governs, and trading beyond the planning hours is a breach of condition enforceable by the planning authority regardless of the licence.

So check the planning history for an hours condition before you apply for the licence hours you want. If a condition restricts hours, the route to changing it is an application under section 73 to vary the condition, which is a full planning application with its own fee, consultation and determination period.

Sequence matters for a second reason. A licensing sub-committee asked to grant hours that planning will not permit tends to grant them anyway, because planning is not its test, leaving the operator with a licence they cannot lawfully use.

Cumulative impact policies and their planning parallel

Under section 5A of the Licensing Act 2003 a licensing authority may publish a cumulative impact assessment for an area where it considers the number of licensed premises is such that further licences would undermine the licensing objectives. Where one is in force, the practical effect is to shift the argument onto the applicant, who has to show their premises will not add to the problem. The assessment has to be reviewed periodically and published in the statement of licensing policy.

Planning has analogues rather than an equivalent. Local plan policies limiting concentrations of particular uses within a frontage, policies on hot food takeaways near schools, and Article 4 directions all perform a similar function through a different mechanism. The analysis for over-concentration arguments is much the same, and our piece on adult gaming centres and amusement arcades in planning covers how authorities build that case.

Where both apply, expect the objections to arrive twice, in different language, from overlapping groups of people.

Age restricted sales and shopfront treatment

The Licensing Act carries mandatory conditions on every premises licence, including the requirement for a designated premises supervisor holding a personal licence, authorisation of each sale by a personal licence holder, and an age verification policy. Challenge 25 is the operational norm rather than a legal requirement, and licensing officers will ask about it.

Vapes sit under product regulation instead. The age of sale is 18 under regulations made in 2015, and the tobacco and vapes legislative framework has been reformed more than once, including a prohibition on the sale of single-use vapes in England taking effect in 2025. Verify the current rules on gov.uk before fitting out, because display and packaging requirements change independently of planning.

Shopfront treatment is where the two regimes meet physically. Tobacco display restrictions mean a covered gantry, which affects the internal layout. Solid external roller shutters are resisted by most authorities on design grounds and usually need planning permission, with open-mesh or internal shutters the acceptable alternative. And window vinyls covering more than a modest proportion of the glazing attract objections both from design officers and, where they prevent natural surveillance, from the police as a responsible authority.

Waste, deliveries and servicing

Glass is the planning issue nobody raises until a resident does. Emptying bottle bins outside a flat at seven in the morning generates complaints that end up as a licence review or an enforcement complaint, sometimes both.

Three things to settle at the outset. Where the bins stand, which must be within the demise rather than on the footway. When collections happen, which should be inside the hours you are prepared to have conditioned. And how deliveries arrive, since a vehicle larger than a transit van on a narrow high street needs a stopping position that does not obstruct the carriageway.

Where plant is installed, whether a chiller, a walk-in cold room or an air conditioning condenser, a noise impact assessment to BS 4142:2014+A1:2019 gives the environmental health officer the rating level against background. That same document often answers the licensing nuisance objection, so commission it once and use it twice. On a busier unit a transport statement covering servicing and customer trips is proportionate.

Running both applications in the right order

Settle the planning position first, then apply for the licence.

That means establishing the lawful use, checking for conditions on hours and on the range of goods, and applying under section 73 where a condition blocks what you need. Only then apply for the premises licence, with the hours you can lawfully trade.

Running them in parallel is defensible where no planning permission is needed and no condition restricts hours, which is the common case for a straightforward shop-to-shop move. Even then, check the planning history before you lodge the licence application, because a 28 day representation period is a short time in which to discover a 1998 condition.

Enter your postcode on PlanScope to see which documents a retail fit-out or change of use is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority, the licensing authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission to open an off licence in a former shop?

Usually not. Retail sale of alcohol for consumption off the premises falls within Class E(a), and movement within Class E is not development. Check the planning history for conditions restricting the unit or its hours, and check for any Article 4 direction, because both can bite where the use class does not.

Does a premises licence override a planning hours condition?

No. The two regimes run independently, and in practice the more restrictive of the two governs. Trading beyond the hours allowed by a planning condition is a breach of condition that the planning authority can enforce, whatever the licence says. Check for an hours condition before applying for licence hours.

Do vape shops need a licence?

Not a premises licence under the Licensing Act 2003, because selling vapes is not a licensable activity. Vapes are regulated as products instead, with an age of sale of 18 and display and packaging rules that have been reformed more than once, including a prohibition on single-use vapes in England taking effect in 2025.

What are the licensing objectives and how do they differ from planning tests?

The four objectives are preventing crime and disorder, public safety, preventing public nuisance and protecting children from harm. Planning is decided on material considerations against the development plan. The statutory guidance under section 182 is explicit that a licensing hearing should not re-run the planning process.

What is a cumulative impact assessment?

Under section 5A of the Licensing Act 2003 a licensing authority may publish an assessment for an area where it considers further licensed premises would undermine the licensing objectives. Where one is in force the applicant has to show their premises will not add to the problem. It is published in the statement of licensing policy.

Should the planning or the licence application go in first?

Settle planning first. Establish the lawful use, check for conditions on hours or the range of goods, and apply under section 73 where a condition blocks what you need. Parallel applications are defensible where no permission is needed and no condition restricts hours, which covers most shop-to-shop moves.

Sources and further reading

licensinguse classesclass eoff licencevape shopcommercial occupiers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

Hours of opening conditions and how to negotiate them

An hours condition is easier to shape before it is imposed than to vary afterwards. Here is the evidence that supports longer hours, how to split customer and delivery restrictions, and what varying an existing condition involves.

Read article →
Commercial Occupiers7 min read

Planning a pharmacy alongside a medical practice

Retail and health services both sit inside Class E, so a pharmacy opening in a shop unit or alongside a surgery usually needs no change of use permission. The consents that do bite are parking, hours, extraction and signage.

Read article →
Commercial Occupiers7 min read

Change of use to a light industrial unit near homes

Light industry sits inside Class E only where the process could be carried out in a residential area without detriment to amenity. That wording, not the machinery, decides whether your unit needs permission.

Read article →
Commercial Occupiers6 min read

Change of use to an amusement arcade or betting shop

Amusement arcades and betting offices sit outside every use class, so a change of use always needs planning permission. The decision usually turns on frontage policy, clustering and noise rather than on the gambling itself.

Read article →
Commercial Occupiers7 min read

Planning a barber, nail bar or beauty salon

Most personal care uses now sit inside Class E, so the use rarely needs permission. Extraction, waste and registration are where the work is.

Read article →
Commercial Occupiers7 min read

Mobile catering on private land and the 28-day rule

Part 4 Class B allows temporary use of land for 28 days a year. It does not apply inside the curtilage of a building, which rules out most car parks.

Read article →