Trees and Arboriculture

Overhanging branches, roots and protected trees

6 min readBy PlanScope Editorial Team

The common law right to cut back to the boundary is settled. Tree preservation orders and conservation area notice requirements sit on top of it and take precedence.

You may cut back branches and roots that cross your boundary. You may not do it if the tree is protected by a tree preservation order, and you may not do it in a conservation area without giving the council six weeks' written notice first. That is the whole of the rule in three sentences, and the second and third sentences are the ones people find out about afterwards.

The common law right is old and well settled. Statutory tree protection sits on top of it and takes precedence, which is a surprise to most householders because the two rules come from completely different places.

The right to cut back

A landowner may remove the parts of a neighbouring tree that encroach over the boundary. You do not need the tree owner's permission, and you do not have to give notice. The limits are practical ones.

You may only cut to the boundary line, not beyond it. You may not enter the neighbour's land to do the work, so anything requiring a ladder against their fence or a climber in their tree needs their agreement. And the work has to be reasonable: the right exists to remove the encroachment, not to reshape or damage the tree.

You also take on a risk. If cutting roots or a large limb destabilises the tree and it later fails, the person who did the cutting may be liable for the consequences. On anything more than light branch work, an arboriculturist's opinion before you start is worth far more than it costs.

What a preservation order does to that right

An order protects the whole tree, including the parts hanging over your garden. Cutting them without the local planning authority's consent is an offence, and the fact that the branches were on your side is not a defence.

Apply to the council for consent, describing the work with the same precision you would use on any other application: the branches identified on a plan or photograph, the length of reduction in metres, and the reason. Councils regularly grant consent for proportionate work to overhanging limbs, and the process takes weeks rather than months. Writing the request properly is covered in more depth in pruning specifications and how to write them.

The regulations contain an exemption for works needed to prevent or abate a nuisance, and this is the most misunderstood provision in tree law. Nuisance here means a nuisance in the legal sense, not an annoyance. Leaves in a gutter, shade over a lawn, birds over a car and fallen fruit have all been treated as insufficient. The courts have also taken a narrow view of how far the exemption extends: it permits what is necessary to deal with the problem, not the most convenient remedy, so where a lesser intervention would work, felling is not covered.

Relying on the exemption without written advice is a gamble with an unlimited fine on the other side. Ask the council instead.

Conservation area trees

Trees in a conservation area that are not covered by an order are protected by a notice requirement. You must give the local planning authority six weeks' written notice before carrying out work to a tree above the stem diameter threshold in the regulations.

During that period the authority can make an order protecting the tree, which converts the situation into the one described above. If it does nothing, the work may proceed within a limited window after the notice period ends.

The notice is not an application, so there is no decision to argue with and no appeal. There is also no fee. Send it early, describe the work in measurements, and diarise both the end of the six weeks and the end of the window in which the work must be carried out.

Who owns what comes off

The branches remain the property of the tree owner, and so does the fruit, whichever side of the boundary it grew on. Strictly, cut material should be offered back.

In practice most people ask first and agree that the material will be taken away. Tipping a pile of cut branches over the fence is a poor idea in law and a worse one in neighbour relations, and where the tree is protected it can look like an admission of unauthorised work.

Photograph the tree from your side before and after, with dates. That record settles most later disagreements about how much was removed, and it is the only evidence you will have if the council asks.

Roots, drains and subsidence

Roots are treated the same way as branches for both the common law right and statutory protection. Cutting the roots of a protected tree without consent is an offence in the same terms as cutting its branches.

Roots in drains are usually a symptom rather than a cause. Roots enter pipes at existing defects, at joints and cracks, because that is where the water is. A drainage survey identifying the defect is more useful than an argument about the tree, and repairing the pipe is generally the answer.

Subsidence is a more serious claim and runs on different rules. A claim against a tree owner requires the damage to be foreseeable, notice to have been given and an opportunity to act, and evidence linking the specific tree to the specific movement, usually through soil and root analysis and level monitoring. It is insurer-led work, and subsidence claims involving neighbouring trees follow a process that householders rarely run themselves.

Where the tree stands in the highway rather than a garden, the highway authority is the owner and the route is different again, as is the position on street trees and utility trenching.

Damaging a protected tree

The offences are serious. Cutting down, uprooting, wilfully destroying or wilfully damaging a protected tree without consent can attract an unlimited fine on conviction in the Crown Court, and the authority can require a replacement tree to be planted.

Ignorance that the tree was protected is not a defence, and orders are not marked on the tree. Check before any work: ask the council's tree officer, search the authority's register, and check whether the address falls in a conservation area. A short email and a week of patience costs nothing.

Contractors are not a shield either. Where a tree surgeon cuts a protected tree on your instruction, both of you may be in difficulty, and a reputable contractor will ask for the consent before quoting.

Resolving it without going formal

Most of these disputes are about being told rather than about the tree. A conversation before work starts, with a description of exactly what you propose to remove, resolves the majority of them.

Where it does not, three routes exist short of litigation. The council's tree officer will often give informal advice on whether a tree is protected and what work would be acceptable. An independent arboriculturist's report gives both sides a neutral description of the tree's condition and what the work would do to it. And for evergreen hedges above two metres causing loss of light, the high hedges provisions in the anti-social behaviour legislation allow a formal complaint to the council once you have made reasonable attempts to settle it directly.

Where trees affect a development proposal rather than a boundary dispute, a tree survey to the British Standard is the document that sets the constraints properly.

Browse all 66 PlanScope report types and start a draft if you are preparing an application that involves trees on or near the site.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I cut branches that hang over my garden?

Yes, back to the boundary line, without the owner's permission and without notice, provided the work is reasonable and you do not enter their land. That right disappears if the tree is covered by a tree preservation order, and in a conservation area you must give the council six weeks' written notice before carrying out the work.

Do I need permission to cut a protected tree's overhanging branches?

Yes. A tree preservation order protects the whole tree including the parts over your land, and cutting without the authority's consent is an offence. Apply describing the work in measurements, with the branches identified on a plan or photograph and a reason given. Councils regularly grant consent for proportionate work to overhanging limbs.

What counts as nuisance under the tree preservation exemption?

Nuisance in the legal sense, not annoyance. Leaves in gutters, shade over a lawn, birds and fallen fruit have been treated as insufficient. The courts have also read the exemption narrowly, allowing only what is necessary to deal with the problem, so felling is not covered where a lesser intervention would work. Ask the council rather than relying on it.

Who owns branches cut from a neighbour's tree?

The tree owner. Cut branches and any fruit remain their property whichever side of the boundary they grew on, and strictly should be offered back. In practice most people agree in advance that the material will be taken away. Tipping cuttings over the fence is a poor idea legally and worse for neighbour relations.

What is the penalty for damaging a protected tree?

Cutting down, uprooting, wilfully destroying or wilfully damaging a protected tree without consent can attract an unlimited fine on conviction in the Crown Court, and the authority can require a replacement to be planted. Not knowing the tree was protected is not a defence, and orders are not marked on the tree.

Sources and further reading

treestponeighbour disputesconservation arearootsabatement

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Trees and Arboriculture

View all →
Trees and Arboriculture7 min read

Damage to a protected tree during development

Wilful damage to a tree protected by a Tree Preservation Order is an offence even where nobody intended to harm the tree. What counts as damage, what the authority can do about it, and how to report a breach.

Read article →
Trees and Arboriculture7 min read

Tree planting conditions: species, size and maintenance

Tree planting conditions ask for a plan, a species schedule, a specification and a maintenance period. A complete discharge package is usually determined without correspondence.

Read article →
Trees and Arboriculture7 min read

Pruning specifications councils will condition

Reduce by 30 per cent means nothing to a tree officer. BS 3998 specifies pruning by the dimensions of the crown that remains, and a specification written that way can be approved in one pass.

Read article →
Trees and Arboriculture7 min read

Soil volumes and pit design for new street trees

Soil volume decides whether a street tree reaches the size on the drawing or dies at fifteen years. Sizing it from mature canopy area, and specifying the pit, matters more than species choice.

Read article →
Trees and Arboriculture7 min read

Answering a tree officer's loss of amenity objection

A tree officer's objection is a professional opinion, not a refusal. Answer it on arboricultural terms by isolating what is disputed and evidencing that point alone.

Read article →
Trees and Arboriculture7 min read

Trees, subsidence and the planning answer

Blaming a protected tree for cracks is not enough. Consent turns on a full season of monitoring, trial pits, soil desiccation data and root identification, plus the heave risk of removal.

Read article →